BuildingCensus
A

101 Metro Dr

Office in San José, CA · 95110

ENERGY STAR score
88
band A · 2024
Site EUI
43.9
kBtu/ft²
GHG emissions
1,300
tCO₂e
GHG intensity
kgCO₂e/ft²
Floor area
482,215
sq ft
Year built
1986
vintage

San José Municipal Code Ch. 17.87 (BPO) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score88 (band A)
Site EUI43.9 kBtu/ft²
Source EUI91.2 kBtu/ft²
GHG emissions1,300 tCO₂e
GHG intensity
Electricity3,900,287 kWh
Natural gas78,400 therms
Water use8,637 kgal
Gross floor area482,215 sq ft
Source recordsan_jose:0314-0-00:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest88±043.9 kBtu/ft²1,300 tCO₂e
202388±046.6 kBtu/ft²1,412 tCO₂e
202288+147.0 kBtu/ft²1,410 tCO₂e
202187+345.2 kBtu/ft²
202084-454.0 kBtu/ft²
201988±060.7 kBtu/ft²
20188856.8 kBtu/ft²

Compliance context

San José Municipal Code Ch. 17.87 (BPO)

San José's BPO requires buildings over 20,000 sq ft to benchmark annually and complete beyond-benchmarking performance improvements on a rolling schedule.

Program details →

Ownership

No owner listed in the disclosure.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
101 Metro Dr
State
California
ZIP
95110

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in San José · biggest emitters

Frequently asked questions

What is 101 Metro Dr's energy grade?

101 Metro Dr scores 88 out of 100 on ENERGY STAR — band A (High performer (85–100)) — in its 2024 San José disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 101 Metro Dr use?

Its 2024 site energy-use intensity was 43.9 kBtu/ft² (91.2 kBtu/ft² source) across 482,215 sq ft, including 3,900,287 kWh of electricity and 78,400 therms of natural gas.

What are 101 Metro Dr's carbon emissions?

101 Metro Dr reported 1,300 tCO₂e of greenhouse-gas emissions for 2024. San José's BPO requires buildings over 20,000 sq ft to benchmark annually and complete beyond-benchmarking performance improvements on a rolling schedule.

Dataset updated . Source: Energy and Water Building Performance Ordinance disclosure, record san_jose:0314-0-00:2024.