2190 Eastridge Loop
Enclosed Mall in San José, CA · 95122
San José Municipal Code Ch. 17.87 (BPO) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 53.8 kBtu/ft² |
| Source EUI | 126.2 kBtu/ft² |
| GHG emissions | 2,968 tCO₂e |
| GHG intensity | — |
| Electricity | 10,229,570 kWh |
| Natural gas | 122,744 therms |
| Water use | 29,606 kgal |
| Gross floor area | 876,321 sq ft |
| Source record | san_jose:1814-0-00:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 53.8 kBtu/ft² | 2,968 tCO₂e | |
| 2023 | — | 59.3 kBtu/ft² | 3,462 tCO₂e | |
| 2022 | — | 59.7 kBtu/ft² | 3,396 tCO₂e | |
| 2021 | — | 49.6 kBtu/ft² | — | |
| 2020 | — | 31.0 kBtu/ft² | — | |
| 2019 | — | 55.5 kBtu/ft² | — | |
| 2018 | — | 58.0 kBtu/ft² | — |
Compliance context
San José Municipal Code Ch. 17.87 (BPO)
San José's BPO requires buildings over 20,000 sq ft to benchmark annually and complete beyond-benchmarking performance improvements on a rolling schedule.
Ownership
No owner listed in the disclosure.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 2190 Eastridge Loop
- City
- San José
- State
- California
- ZIP
- 95122
Within ~1 km
Nearby benchmarked buildings
This source publishes no coordinates, so nearby buildings can't be resolved yet.
See also: most efficient in San José · biggest emitters
Frequently asked questions
What is 2190 Eastridge Loop's energy grade?
2190 Eastridge Loop did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 53.8 kBtu/ft².
How much energy does 2190 Eastridge Loop use?
Its 2024 site energy-use intensity was 53.8 kBtu/ft² (126.2 kBtu/ft² source) across 876,321 sq ft, including 10,229,570 kWh of electricity and 122,744 therms of natural gas.
What are 2190 Eastridge Loop's carbon emissions?
2190 Eastridge Loop reported 2,968 tCO₂e of greenhouse-gas emissions for 2024. San José's BPO requires buildings over 20,000 sq ft to benchmark annually and complete beyond-benchmarking performance improvements on a rolling schedule.
Dataset updated . Source: Energy and Water Building Performance Ordinance disclosure, record san_jose:1814-0-00:2024.