Harbor Police Headquarters
Police Station in San Diego, CA · 3380 N Harbor Dr
At a glance
Harbor Police Headquarters is a 22,800-square-foot police station at 3380 N Harbor Dr in San Diego, California, built in 1946. In its 2022 San Diego benchmarking disclosure it reported a site energy-use intensity of 77.7 kBtu/ft².
Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12) · reporting year 2022
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 77.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | — |
| GHG intensity | — |
| Gross floor area | 22,800 sq ft |
| Source record | san_diego:102410:2022 |
Compliance context
Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12)
San Diego's ordinance requires annual benchmarking for commercial buildings over 50,000 sq ft, with civil penalties for buildings that fail to report.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 3380 N Harbor Dr
- City
- San Diego
- State
- California
Within ~1 km
Nearby benchmarked buildings
This source publishes no coordinates, so nearby buildings can't be resolved yet.
See also: most efficient in San Diego · biggest emitters
How does Harbor Police Headquarters compare with other buildings in San Diego?
The latest disclosures cover 2,567 benchmarked buildings in San Diego. Its site EUI of 77.7 kBtu/ft² is about 30% above the average of 59.8 kBtu/ft² — it uses more energy per square foot than the typical building in that group.
At 22,800 sq ft, it is about 86% below the average floor area of 168,156 sq ft for those buildings. It was built in 1946, 45 years earlier than the group's average year built (1991).
What does a site EUI of 77.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Harbor Police Headquarters's 77.7 kBtu/ft² across 22,800 sq ft works out to about 1.8 billion Btu (519 MWh-equivalent) in 2022.
Which law requires Harbor Police Headquarters to report its energy use?
Harbor Police Headquarters reports under the Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12), the legal basis of San Diego's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record san_diego:102410:2022). San Diego's ordinance requires annual benchmarking for commercial buildings over 50,000 sq ft, with civil penalties for buildings that fail to report.
More police station buildings in San Diego
Frequently asked questions
What is Harbor Police Headquarters's energy grade?
Harbor Police Headquarters did not report an ENERGY STAR score in its 2022 disclosure, but its site energy-use intensity was 77.7 kBtu/ft².
How much energy does Harbor Police Headquarters use?
Its 2022 site energy-use intensity was 77.7 kBtu/ft² across 22,800 sq ft.
What are Harbor Police Headquarters's carbon emissions?
No greenhouse-gas emissions figure was reported for 2022.
Where is Harbor Police Headquarters?
Harbor Police Headquarters is at 3380 N Harbor Dr, in San Diego, California.
How big is Harbor Police Headquarters and when was it built?
Harbor Police Headquarters has 22,800 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 1946 as its year built. It is classed as police station.
Is Harbor Police Headquarters covered by the Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12)?
Yes — it appears in the 2022 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12).
Working with San Diego building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Harbor Police Headquarters, San Diego, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/san-diego/harbor-police-headquarters-093c56fa (data as of July 9, 2026).