BuildingCensus
–

MIRA MESA STADIUM 18

Movie Theater in San Diego, CA · 10733 WESTVIEW PKWY

At a glance

MIRA MESA STADIUM 18 is a 94,041-square-foot movie theater building at 10733 WESTVIEW PKWY in San Diego, California, built in 2000. In its 2022 San Diego benchmarking disclosure it reported a site energy-use intensity of 59.0 kBtu/ft².

ENERGY STAR score
—
not reported · 2022
Site EUI
59.0
kBtu/ft²
GHG emissions
—
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
94,041
sq ft
Year built
2000
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12) · reporting year 2022

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI59.0 kBtu/ft²
Source EUI—
GHG emissions—
GHG intensity—
Gross floor area94,041 sq ft
Source recordsan_diego:100455:2022

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2022latest—59.0 kBtu/ft²—
2021—43.4 kBtu/ft²—

Compliance context

Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12)

San Diego's ordinance requires annual benchmarking for commercial buildings over 50,000 sq ft, with civil penalties for buildings that fail to report.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
10733 WESTVIEW PKWY
State
California
Coordinates
32.91521, -117.11758

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in San Diego · biggest emitters

How does MIRA MESA STADIUM 18 compare with other movie theater buildings in San Diego?

The latest disclosures cover 6 movie theater buildings in San Diego, out of 2,567 buildings citywide. Its site EUI of 59.0 kBtu/ft² is about 16% below the average of 69.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 94,041 sq ft, it is about 28% above the average floor area of 73,447 sq ft for those buildings. Its 2000 construction date is close to the group's average year built (2000). Across all 24 jurisdictions BuildingCensus covers, the 245 movie theater buildings average an ENERGY STAR score of 92 and a site EUI of 73.0 kBtu/ft².

How has MIRA MESA STADIUM 18's energy performance changed over time?

BuildingCensus holds 2 San Diego disclosures for MIRA MESA STADIUM 18, covering report years 2021–2022. Site EUI moved from 43.4 kBtu/ft² (2021) to 59.0 kBtu/ft² (2022), an 36% increase.

What does a site EUI of 59.0 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. MIRA MESA STADIUM 18's 59.0 kBtu/ft² across 94,041 sq ft works out to about 5.5 billion Btu (1,626 MWh-equivalent) in 2022.

Which law requires MIRA MESA STADIUM 18 to report its energy use?

MIRA MESA STADIUM 18 reports under the Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12), the legal basis of San Diego's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record san_diego:100455:2022). San Diego's ordinance requires annual benchmarking for commercial buildings over 50,000 sq ft, with civil penalties for buildings that fail to report.

More movie theater buildings in San Diego

Frequently asked questions

What is MIRA MESA STADIUM 18's energy grade?

MIRA MESA STADIUM 18 did not report an ENERGY STAR score in its 2022 disclosure, but its site energy-use intensity was 59.0 kBtu/ft².

How much energy does MIRA MESA STADIUM 18 use?

Its 2022 site energy-use intensity was 59.0 kBtu/ft² across 94,041 sq ft.

What are MIRA MESA STADIUM 18's carbon emissions?

No greenhouse-gas emissions figure was reported for 2022.

Where is MIRA MESA STADIUM 18?

MIRA MESA STADIUM 18 is at 10733 WESTVIEW PKWY, in San Diego, California. Its coordinates are 32.91521, -117.11758 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is MIRA MESA STADIUM 18 and when was it built?

MIRA MESA STADIUM 18 has 94,041 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 2000 as its year built. It is classed as movie theater.

Is MIRA MESA STADIUM 18 covered by the Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12)?

Yes — it appears in the 2022 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12).

Working with San Diego building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Building Energy Benchmarking Ordinance (SDMC Ch. 14 Art. 12)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “MIRA MESA STADIUM 18, San Diego, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/san-diego/mira-mesa-stadium-18-bd090c39 (data as of July 9, 2026).