At a glance

617 Eastlake - Yale Campus is a 144,573-square-foot office building at 617 EASTLAKE AVE E in Seattle, Washington, built in 1990. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 92 out of 100 (grade A), a site energy-use intensity of 34.3 kBtu/ft² and 16 tCO₂e of greenhouse-gas emissions. That score is higher than 76% of the 378 scored office buildings in Seattle.

ENERGY STAR score
92
band A · 2025
Site EUI
34.3
kBtu/ft²
GHG emissions
16
tCO₂e
GHG intensity
0.2
kgCO₂e/ft²
Floor area
144,573
sq ft
Year built
1990
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score92 (band A)
Site EUI34.3 kBtu/ft²
Source EUI96.0 kBtu/ft²
GHG emissions16 tCO₂e
GHG intensity0.2 kgCO₂e/ft²
Electricity783,165 kWh
Gross floor area144,573 sq ft
Source recordseattle:573:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest92+634.3 kBtu/ft²16 tCO₂e
202486+1338.3 kBtu/ft²17 tCO₂e
202373+447.9 kBtu/ft²22 tCO₂e
202269-451.1 kBtu/ft²23 tCO₂e
202173-949.0 kBtu/ft²22 tCO₂e
202082+1243.9 kBtu/ft²20 tCO₂e
201970+352.5 kBtu/ft²24 tCO₂e
201867+2254.6 kBtu/ft²25 tCO₂e
201745-1765.2 kBtu/ft²30 tCO₂e
201662+665.4 kBtu/ft²30 tCO₂e
20155669.1 kBtu/ft²32 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
617 EASTLAKE AVE E
State
Washington
ZIP
98109
Coordinates
47.62488, -122.33007

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does 617 Eastlake - Yale Campus compare with other office buildings in Seattle?

The latest disclosures cover 497 office buildings in Seattle, out of 3,871 buildings citywide. 617 Eastlake - Yale Campus's ENERGY STAR score of 92 compares with an average of 76 across the 378 that report a score; it scores higher than 76% of them and lower than 21%. Its site EUI of 34.3 kBtu/ft² is about 23% below the average of 44.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.2 kgCO₂e/ft² is about 70% below the group average of 0.7 kgCO₂e/ft².

At 144,573 sq ft, it is about 26% below the average floor area of 196,452 sq ft for those buildings. It was built in 1990, 25 years later than the group's average year built (1965). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².

How has 617 Eastlake - Yale Campus's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for 617 Eastlake - Yale Campus, covering report years 2015–2025. Its ENERGY STAR score went from 56 in 2015 to 92 in 2025 (+36 points). Site EUI moved from 69.1 kBtu/ft² (2015) to 34.3 kBtu/ft² (2025), a 50% decrease. Reported emissions went from 32 tCO₂e to 16 tCO₂e over the same span (down 49%).

What does an ENERGY STAR score of 92 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 92 means the building performs better than about 92% of its national peers. BuildingCensus bands the score into report-card grades; 92 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 617 Eastlake - Yale Campus's 34.3 kBtu/ft² across 144,573 sq ft works out to about 5 billion Btu (1,453 MWh-equivalent) in 2025. Its source EUI of 96.0 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 783,165 kWh of electricity for the year.

Which law requires 617 Eastlake - Yale Campus to report its energy use?

617 Eastlake - Yale Campus reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:573:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More office buildings in Seattle

Frequently asked questions

What is 617 Eastlake - Yale Campus's energy grade?

617 Eastlake - Yale Campus scores 92 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 617 Eastlake - Yale Campus use?

Its 2025 site energy-use intensity was 34.3 kBtu/ft² (96.0 kBtu/ft² source) across 144,573 sq ft, including 783,165 kWh of electricity.

What are 617 Eastlake - Yale Campus's carbon emissions?

617 Eastlake - Yale Campus reported 16 tCO₂e of greenhouse-gas emissions (0.2 kgCO₂e/ft²) for 2025.

Where is 617 Eastlake - Yale Campus?

617 Eastlake - Yale Campus is at 617 EASTLAKE AVE E, in Seattle, Washington 98109. Its coordinates are 47.62488, -122.33007 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is 617 Eastlake - Yale Campus and when was it built?

617 Eastlake - Yale Campus has 144,573 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1990 as its year built. It is classed as office.

Is 617 Eastlake - Yale Campus covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “617 Eastlake - Yale Campus, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/617-eastlake-yale-campus-0e234d94 (data as of October 2, 2026).