BuildingCensus
–

Allen Institute For Brain Science (Aibs)

Laboratory in Seattle, WA · 601 WESTLAKE AVE N · 98109

At a glance

Allen Institute For Brain Science (Aibs) is a 345,290-square-foot laboratory building at 601 WESTLAKE AVE N in Seattle, Washington, built in 2015. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 145.8 kBtu/ft² and 769 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2025
Site EUI
145.8
kBtu/ft²
GHG emissions
769
tCO₂e
GHG intensity
2.6
kgCO₂e/ft²
Floor area
345,290
sq ft
Year built
2015
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI145.8 kBtu/ft²
Source EUI334.4 kBtu/ft²
GHG emissions769 tCO₂e
GHG intensity2.6 kgCO₂e/ft²
Electricity8,965,317 kWh
Natural gas124,411 therms
Gross floor area345,290 sq ft
Source recordseattle:50094:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest—145.8 kBtu/ft²769 tCO₂e
2024—141.7 kBtu/ft²813 tCO₂e
2023—149.0 kBtu/ft²925 tCO₂e
2022—156.4 kBtu/ft²1,088 tCO₂e
2021—142.1 kBtu/ft²898 tCO₂e
2020—153.8 kBtu/ft²902 tCO₂e
2019—147.6 kBtu/ft²836 tCO₂e
2018—149.5 kBtu/ft²902 tCO₂e
2017—148.6 kBtu/ft²946 tCO₂e
2016—144.5 kBtu/ft²971 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
601 WESTLAKE AVE N
State
Washington
ZIP
98109
Coordinates
47.62497, -122.33883

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Allen Institute For Brain Science (Aibs) compare with other laboratory buildings in Seattle?

The latest disclosures cover 32 laboratory buildings in Seattle, out of 3,871 buildings citywide. Its site EUI of 145.8 kBtu/ft² is about 18% below the average of 178.6 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 2.6 kgCO₂e/ft² is about 43% below the group average of 4.6 kgCO₂e/ft².

At 345,290 sq ft, it is about 70% above the average floor area of 202,547 sq ft for those buildings. It was built in 2015, 29 years later than the group's average year built (1986). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².

How has Allen Institute For Brain Science (Aibs)'s energy performance changed over time?

BuildingCensus holds 10 Seattle disclosures for Allen Institute For Brain Science (Aibs), covering report years 2016–2025. Site EUI moved from 144.5 kBtu/ft² (2016) to 145.8 kBtu/ft² (2025), an 1% increase. Reported emissions went from 971 tCO₂e to 769 tCO₂e over the same span (down 21%).

What does a site EUI of 145.8 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Allen Institute For Brain Science (Aibs)'s 145.8 kBtu/ft² across 345,290 sq ft works out to about 50.3 billion Btu (14,754 MWh-equivalent) in 2025. Its source EUI of 334.4 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 8,965,317 kWh of electricity and 124,411 therms of natural gas for the year.

Which law requires Allen Institute For Brain Science (Aibs) to report its energy use?

Allen Institute For Brain Science (Aibs) reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:50094:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More laboratory buildings in Seattle

Frequently asked questions

What is Allen Institute For Brain Science (Aibs)'s energy grade?

Allen Institute For Brain Science (Aibs) did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 145.8 kBtu/ft².

How much energy does Allen Institute For Brain Science (Aibs) use?

Its 2025 site energy-use intensity was 145.8 kBtu/ft² (334.4 kBtu/ft² source) across 345,290 sq ft, including 8,965,317 kWh of electricity and 124,411 therms of natural gas.

What are Allen Institute For Brain Science (Aibs)'s carbon emissions?

Allen Institute For Brain Science (Aibs) reported 769 tCO₂e of greenhouse-gas emissions (2.6 kgCO₂e/ft²) for 2025.

Where is Allen Institute For Brain Science (Aibs)?

Allen Institute For Brain Science (Aibs) is at 601 WESTLAKE AVE N, in Seattle, Washington 98109. Its coordinates are 47.62497, -122.33883 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Allen Institute For Brain Science (Aibs) and when was it built?

Allen Institute For Brain Science (Aibs) has 345,290 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 2015 as its year built. It is classed as laboratory.

Is Allen Institute For Brain Science (Aibs) covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Allen Institute For Brain Science (Aibs), Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/allen-institute-for-brain-science-aibs-ce76431c (data as of October 2, 2026).