BuildingCensus
B

Blaine K-8 School & Magnolia Community Center (Sps-District)

K-12 School in Seattle, WA · 2550 34TH AVE W · 98199

At a glance

Blaine K-8 School & Magnolia Community Center (Sps-District) is a 116,101-square-foot K-12 school at 2550 34TH AVE W in Seattle, Washington, built in 1952. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 75 out of 100 (grade B), a site energy-use intensity of 45.6 kBtu/ft² and 218 tCO₂e of greenhouse-gas emissions. That score is higher than 45% of the 152 scored K-12 school buildings in Seattle.

ENERGY STAR score
75
band B · 2025
Site EUI
45.6
kBtu/ft²
GHG emissions
218
tCO₂e
GHG intensity
1.9
kgCO₂e/ft²
Floor area
116,101
sq ft
Year built
1952
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score75 (band B)
Site EUI45.6 kBtu/ft²
Source EUI61.5 kBtu/ft²
GHG emissions218 tCO₂e
GHG intensity1.9 kgCO₂e/ft²
Electricity268,382 kWh
Natural gas43,485 therms
Gross floor area116,101 sq ft
Source recordseattle:49703:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest75+945.6 kBtu/ft²218 tCO₂e
202466+3350.9 kBtu/ft²264 tCO₂e
202333-1577.5 kBtu/ft²425 tCO₂e
202248-967.0 kBtu/ft²361 tCO₂e
202157-2060.9 kBtu/ft²330 tCO₂e
202077+442.5 kBtu/ft²224 tCO₂e
201973+845.7 kBtu/ft²243 tCO₂e
201865-946.3 kBtu/ft²234 tCO₂e
20177452.9 kBtu/ft²266 tCO₂e
2016——234 tCO₂e
2015——268 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
2550 34TH AVE W
State
Washington
ZIP
98199
Coordinates
47.64267, -122.40025

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Blaine K-8 School & Magnolia Community Center (Sps-District) compare with other K-12 school buildings in Seattle?

The latest disclosures cover 153 K-12 school buildings in Seattle, out of 3,871 buildings citywide. Blaine K-8 School & Magnolia Community Center (Sps-District)'s ENERGY STAR score of 75 compares with an average of 71 across the 152 that report a score; it scores higher than 45% of them and lower than 53%. Its site EUI of 45.6 kBtu/ft² is about 19% above the average of 38.3 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 1.9 kgCO₂e/ft² is about 72% above the group average of 1.1 kgCO₂e/ft².

At 116,101 sq ft, it is about 46% above the average floor area of 79,329 sq ft for those buildings. It was built in 1952, 18 years earlier than the group's average year built (1970). Across all 24 jurisdictions BuildingCensus covers, the 6,548 K-12 school buildings average an ENERGY STAR score of 64 and a site EUI of 52.7 kBtu/ft².

How has Blaine K-8 School & Magnolia Community Center (Sps-District)'s energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Blaine K-8 School & Magnolia Community Center (Sps-District), covering report years 2015–2025. Its ENERGY STAR score went from 74 in 2017 to 75 in 2025 (+1 points); its best year on file was 2020, at 77. Site EUI moved from 52.9 kBtu/ft² (2017) to 45.6 kBtu/ft² (2025), a 14% decrease. Reported emissions went from 268 tCO₂e to 218 tCO₂e over the same span (down 18%).

What does an ENERGY STAR score of 75 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 75 means the building performs better than about 75% of its national peers. BuildingCensus bands the score into report-card grades; 75 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Blaine K-8 School & Magnolia Community Center (Sps-District)'s 45.6 kBtu/ft² across 116,101 sq ft works out to about 5.3 billion Btu (1,552 MWh-equivalent) in 2025. Its source EUI of 61.5 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 268,382 kWh of electricity and 43,485 therms of natural gas for the year.

Which law requires Blaine K-8 School & Magnolia Community Center (Sps-District) to report its energy use?

Blaine K-8 School & Magnolia Community Center (Sps-District) reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:49703:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More K-12 school buildings in Seattle

Frequently asked questions

What is Blaine K-8 School & Magnolia Community Center (Sps-District)'s energy grade?

Blaine K-8 School & Magnolia Community Center (Sps-District) scores 75 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Blaine K-8 School & Magnolia Community Center (Sps-District) use?

Its 2025 site energy-use intensity was 45.6 kBtu/ft² (61.5 kBtu/ft² source) across 116,101 sq ft, including 268,382 kWh of electricity and 43,485 therms of natural gas.

What are Blaine K-8 School & Magnolia Community Center (Sps-District)'s carbon emissions?

Blaine K-8 School & Magnolia Community Center (Sps-District) reported 218 tCO₂e of greenhouse-gas emissions (1.9 kgCO₂e/ft²) for 2025.

Where is Blaine K-8 School & Magnolia Community Center (Sps-District)?

Blaine K-8 School & Magnolia Community Center (Sps-District) is at 2550 34TH AVE W, in Seattle, Washington 98199. Its coordinates are 47.64267, -122.40025 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Blaine K-8 School & Magnolia Community Center (Sps-District) and when was it built?

Blaine K-8 School & Magnolia Community Center (Sps-District) has 116,101 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1952 as its year built. It is classed as K-12 school.

Is Blaine K-8 School & Magnolia Community Center (Sps-District) covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Blaine K-8 School & Magnolia Community Center (Sps-District), Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/blaine-k-8-school-magnolia-community-center-sps-district-7c9cbb7e (data as of October 2, 2026).