BuildingCensus
–

Centurylink: East Co

Data Center in Seattle, WA · 1708 E PIKE ST · 98122

At a glance

Centurylink: East Co is a 80,004-square-foot data center at 1708 E PIKE ST in Seattle, Washington, built in 1926. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 117.1 kBtu/ft² and 53 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2025
Site EUI
117.1
kBtu/ft²
GHG emissions
53
tCO₂e
GHG intensity
0.7
kgCO₂e/ft²
Floor area
80,004
sq ft
Year built
1926
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI117.1 kBtu/ft²
Source EUI327.7 kBtu/ft²
GHG emissions53 tCO₂e
GHG intensity0.7 kgCO₂e/ft²
Electricity2,650,568 kWh
Gross floor area80,004 sq ft
Source recordseattle:566:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest—117.1 kBtu/ft²53 tCO₂e
2024—124.6 kBtu/ft²54 tCO₂e
2023—122.7 kBtu/ft²53 tCO₂e
2022—113.5 kBtu/ft²49 tCO₂e
2021—110.8 kBtu/ft²48 tCO₂e
2020—136.2 kBtu/ft²59 tCO₂e
2019—119.4 kBtu/ft²52 tCO₂e
2018—144.4 kBtu/ft²63 tCO₂e
2017—161.2 kBtu/ft²70 tCO₂e
2016—163.4 kBtu/ft²71 tCO₂e
2015—190.6 kBtu/ft²83 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1708 E PIKE ST
State
Washington
ZIP
98122
Coordinates
47.61440, -122.30982

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Centurylink: East Co compare with other data center buildings in Seattle?

The latest disclosures cover 13 data center buildings in Seattle, out of 3,871 buildings citywide. Its site EUI of 117.1 kBtu/ft² is about 66% below the average of 348.3 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.7 kgCO₂e/ft² is about 69% below the group average of 2.2 kgCO₂e/ft².

At 80,004 sq ft, it is about 20% below the average floor area of 99,697 sq ft for those buildings. It was built in 1926, 29 years earlier than the group's average year built (1955). Across all 24 jurisdictions BuildingCensus covers, the 267 data center buildings average an ENERGY STAR score of 68 and a site EUI of 504.4 kBtu/ft².

How has Centurylink: East Co's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Centurylink: East Co, covering report years 2015–2025. Site EUI moved from 190.6 kBtu/ft² (2015) to 117.1 kBtu/ft² (2025), a 39% decrease. Reported emissions went from 83 tCO₂e to 53 tCO₂e over the same span (down 36%).

What does a site EUI of 117.1 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Centurylink: East Co's 117.1 kBtu/ft² across 80,004 sq ft works out to about 9.4 billion Btu (2,746 MWh-equivalent) in 2025. Its source EUI of 327.7 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 2,650,568 kWh of electricity for the year.

Which law requires Centurylink: East Co to report its energy use?

Centurylink: East Co reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:566:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More data center buildings in Seattle

Frequently asked questions

What is Centurylink: East Co's energy grade?

Centurylink: East Co did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 117.1 kBtu/ft².

How much energy does Centurylink: East Co use?

Its 2025 site energy-use intensity was 117.1 kBtu/ft² (327.7 kBtu/ft² source) across 80,004 sq ft, including 2,650,568 kWh of electricity.

What are Centurylink: East Co's carbon emissions?

Centurylink: East Co reported 53 tCO₂e of greenhouse-gas emissions (0.7 kgCO₂e/ft²) for 2025.

Where is Centurylink: East Co?

Centurylink: East Co is at 1708 E PIKE ST, in Seattle, Washington 98122. Its coordinates are 47.61440, -122.30982 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Centurylink: East Co and when was it built?

Centurylink: East Co has 80,004 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1926 as its year built. It is classed as data center.

Is Centurylink: East Co covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Centurylink: East Co, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/centurylink-east-co-ca61446c (data as of October 2, 2026).