At a glance
Sct Technical Pavilion - Seattle Center is a 29,000-square-foot other building at 201 THOMAS ST in Seattle, Washington, built in 1962. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 104.1 kBtu/ft² and 63 tCO₂e of greenhouse-gas emissions.
Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 104.1 kBtu/ft² |
| Source EUI | 229.4 kBtu/ft² |
| GHG emissions | 63 tCO₂e |
| GHG intensity | 2.2 kgCO₂e/ft² |
| Electricity | 585,826 kWh |
| Natural gas | 10,312 therms |
| Gross floor area | 29,000 sq ft |
| Source record | seattle:49862:2025 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2025latest | — | 104.1 kBtu/ft² | 63 tCO₂e | |
| 2024 | — | 95.0 kBtu/ft² | 58 tCO₂e | |
| 2023 | — | 102.8 kBtu/ft² | 73 tCO₂e | |
| 2022 | — | 124.9 kBtu/ft² | 102 tCO₂e | |
| 2021 | — | 94.0 kBtu/ft² | 88 tCO₂e | |
| 2020 | — | 54.9 kBtu/ft² | 46 tCO₂e | |
| 2019 | — | 68.4 kBtu/ft² | 42 tCO₂e | |
| 2018 | — | 82.4 kBtu/ft² | 51 tCO₂e | |
| 2017 | — | 94.7 kBtu/ft² | 67 tCO₂e | |
| 2016 | — | 83.4 kBtu/ft² | 53 tCO₂e | |
| 2015 | — | 93.9 kBtu/ft² | 47 tCO₂e |
Compliance context
Seattle Energy Benchmarking Ordinance (SMC 22.920)
Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 201 THOMAS ST
- City
- Seattle
- State
- Washington
- ZIP
- 98109
- Coordinates
- 47.62074, -122.35218
Within ~1 km
Nearby benchmarked buildings
- Climate Pledge Arenascore —
Indoor Arena · 932,000 sq ft
- Bill & Melinda Gates Foundationscore 73
Office · 920,598 sq ft
- Olympus Aptsscore 97
Multifamily Housing · 590,869 sq ft
Mixed Use Property · 524,610 sq ft
- Spire Condosscore 87
Multifamily Housing · 400,000 sq ft
- Avalon Belltown Towersscore 72
Multifamily Housing · 397,034 sq ft
See also: most efficient in Seattle · biggest emitters
How does Sct Technical Pavilion - Seattle Center compare with other other buildings in Seattle?
The latest disclosures cover 45 other buildings in Seattle, out of 3,871 buildings citywide. Its site EUI of 104.1 kBtu/ft² is about 75% above the average of 59.4 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 2.2 kgCO₂e/ft² is about twice the group average of 1.1 kgCO₂e/ft².
At 29,000 sq ft, it is about half of the average floor area of 55,708 sq ft for those buildings. It was built in 1962, 10 years later than the group's average year built (1952). Across all 24 jurisdictions BuildingCensus covers, the 1,327 other buildings average an ENERGY STAR score of 60 and a site EUI of 63.3 kBtu/ft².
How has Sct Technical Pavilion - Seattle Center's energy performance changed over time?
BuildingCensus holds 11 Seattle disclosures for Sct Technical Pavilion - Seattle Center, covering report years 2015–2025. Site EUI moved from 93.9 kBtu/ft² (2015) to 104.1 kBtu/ft² (2025), an 11% increase. Reported emissions went from 47 tCO₂e to 63 tCO₂e over the same span (up 34%).
What does a site EUI of 104.1 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Sct Technical Pavilion - Seattle Center's 104.1 kBtu/ft² across 29,000 sq ft works out to about 3 billion Btu (885 MWh-equivalent) in 2025. Its source EUI of 229.4 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 585,826 kWh of electricity and 10,312 therms of natural gas for the year.
Which law requires Sct Technical Pavilion - Seattle Center to report its energy use?
Sct Technical Pavilion - Seattle Center reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:49862:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.
More other buildings in Seattle
- Fraser Boiler Service· 28,109 sq ft · EUI 288.6 kBtu/ft²
- Northwest Rooms - Seattle Center· 26,000 sq ft · EUI 93.9 kBtu/ft²
- Victory Studios· 25,946 sq ft · EUI 4474.8 kBtu/ft²
- CENTURYLINK: COIN OFFICE· 25,460 sq ft · EUI 50.2 kBtu/ft²
- J & M Hotel Building· 25,450 sq ft
- Salvation Army White Center Community Center· 24,224 sq ft · EUI 25.1 kBtu/ft²
- Other buildings in Seattle· 45 benchmarked
- All Seattle benchmarked buildings· Seattle Energy Benchmarking Ordinance (SMC 22.920)
- Most efficient large buildings in Seattle
- Least efficient large buildings in Seattle
- Biggest emitters in Seattle
Frequently asked questions
What is Sct Technical Pavilion - Seattle Center's energy grade?
Sct Technical Pavilion - Seattle Center did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 104.1 kBtu/ft².
How much energy does Sct Technical Pavilion - Seattle Center use?
Its 2025 site energy-use intensity was 104.1 kBtu/ft² (229.4 kBtu/ft² source) across 29,000 sq ft, including 585,826 kWh of electricity and 10,312 therms of natural gas.
What are Sct Technical Pavilion - Seattle Center's carbon emissions?
Sct Technical Pavilion - Seattle Center reported 63 tCO₂e of greenhouse-gas emissions (2.2 kgCO₂e/ft²) for 2025.
Where is Sct Technical Pavilion - Seattle Center?
Sct Technical Pavilion - Seattle Center is at 201 THOMAS ST, in Seattle, Washington 98109. Its coordinates are 47.62074, -122.35218 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is Sct Technical Pavilion - Seattle Center and when was it built?
Sct Technical Pavilion - Seattle Center has 29,000 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1962 as its year built. It is classed as other.
Is Sct Technical Pavilion - Seattle Center covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?
Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).
Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Sct Technical Pavilion - Seattle Center, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/sct-technical-pavilion-seattle-center-683c94d0 (data as of October 2, 2026).