BuildingCensus
A

Seattle Children's Hospital Research Building #2

Office in Seattle, WA · 1915 TERRY AVE · 98101

At a glance

Seattle Children's Hospital Research Building #2 is a 274,362-square-foot office building at 1915 TERRY AVE in Seattle, Washington, built in 1953. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 95 out of 100 (grade A), a site energy-use intensity of 31.2 kBtu/ft² and 89 tCO₂e of greenhouse-gas emissions. That score is higher than 84% of the 378 scored office buildings in Seattle.

ENERGY STAR score
95
band A · 2025
Site EUI
31.2
kBtu/ft²
GHG emissions
89
tCO₂e
GHG intensity
0.3
kgCO₂e/ft²
Floor area
274,362
sq ft
Year built
1953
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score95 (band A)
Site EUI31.2 kBtu/ft²
Source EUI81.9 kBtu/ft²
GHG emissions89 tCO₂e
GHG intensity0.3 kgCO₂e/ft²
Electricity2,260,825 kWh
Natural gas8,392 therms
Gross floor area274,362 sq ft
Source recordseattle:750:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest95-131.2 kBtu/ft²89 tCO₂e
202496+230.0 kBtu/ft²80 tCO₂e
202394+232.3 kBtu/ft²79 tCO₂e
202292+231.4 kBtu/ft²71 tCO₂e
202190±031.4 kBtu/ft²67 tCO₂e
202090-432.1 kBtu/ft²69 tCO₂e
201994±034.4 kBtu/ft²90 tCO₂e
201894+1234.6 kBtu/ft²105 tCO₂e
201782±061.3 kBtu/ft²136 tCO₂e
20168260.3 kBtu/ft²129 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1915 TERRY AVE
State
Washington
ZIP
98101
Coordinates
47.61628, -122.33391

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Seattle Children's Hospital Research Building #2 compare with other office buildings in Seattle?

The latest disclosures cover 497 office buildings in Seattle, out of 3,871 buildings citywide. Seattle Children's Hospital Research Building #2's ENERGY STAR score of 95 compares with an average of 76 across the 378 that report a score; it scores higher than 84% of them and lower than 12%. Its site EUI of 31.2 kBtu/ft² is about 30% below the average of 44.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.3 kgCO₂e/ft² is about half of the group average of 0.7 kgCO₂e/ft².

At 274,362 sq ft, it is about 40% above the average floor area of 196,452 sq ft for those buildings. It was built in 1953, 12 years earlier than the group's average year built (1965). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².

How has Seattle Children's Hospital Research Building #2's energy performance changed over time?

BuildingCensus holds 10 Seattle disclosures for Seattle Children's Hospital Research Building #2, covering report years 2016–2025. Its ENERGY STAR score went from 82 in 2016 to 95 in 2025 (+13 points); its best year on file was 2024, at 96. Site EUI moved from 60.3 kBtu/ft² (2016) to 31.2 kBtu/ft² (2025), a 48% decrease. Reported emissions went from 129 tCO₂e to 89 tCO₂e over the same span (down 31%).

What does an ENERGY STAR score of 95 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 95 means the building performs better than about 95% of its national peers. BuildingCensus bands the score into report-card grades; 95 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Seattle Children's Hospital Research Building #2's 31.2 kBtu/ft² across 274,362 sq ft works out to about 8.6 billion Btu (2,509 MWh-equivalent) in 2025. Its source EUI of 81.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 2,260,825 kWh of electricity and 8,392 therms of natural gas for the year.

Which law requires Seattle Children's Hospital Research Building #2 to report its energy use?

Seattle Children's Hospital Research Building #2 reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:750:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More office buildings in Seattle

Frequently asked questions

What is Seattle Children's Hospital Research Building #2's energy grade?

Seattle Children's Hospital Research Building #2 scores 95 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Seattle Children's Hospital Research Building #2 use?

Its 2025 site energy-use intensity was 31.2 kBtu/ft² (81.9 kBtu/ft² source) across 274,362 sq ft, including 2,260,825 kWh of electricity and 8,392 therms of natural gas.

What are Seattle Children's Hospital Research Building #2's carbon emissions?

Seattle Children's Hospital Research Building #2 reported 89 tCO₂e of greenhouse-gas emissions (0.3 kgCO₂e/ft²) for 2025.

Where is Seattle Children's Hospital Research Building #2?

Seattle Children's Hospital Research Building #2 is at 1915 TERRY AVE, in Seattle, Washington 98101. Its coordinates are 47.61628, -122.33391 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Seattle Children's Hospital Research Building #2 and when was it built?

Seattle Children's Hospital Research Building #2 has 274,362 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1953 as its year built. It is classed as office.

Is Seattle Children's Hospital Research Building #2 covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Seattle Children's Hospital Research Building #2, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/seattle-children-s-hospital-research-building-2-a2d3194f (data as of October 2, 2026).