The Wesley At Cremona
College/University in Seattle, WA · 13 W CREMONA ST · 98119
At a glance
The Wesley At Cremona is a 24,501-square-foot college/university building at 13 W CREMONA ST in Seattle, Washington, built in 2004. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 35.7 kBtu/ft² and 16 tCO₂e of greenhouse-gas emissions.
Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 35.7 kBtu/ft² |
| Source EUI | 77.6 kBtu/ft² |
| GHG emissions | 16 tCO₂e |
| GHG intensity | 0.8 kgCO₂e/ft² |
| Electricity | 139,555 kWh |
| Natural gas | 2,643 therms |
| Gross floor area | 24,501 sq ft |
| Source record | seattle:21149:2025 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2025latest | — | 35.7 kBtu/ft² | 16 tCO₂e | |
| 2024 | 95 | -1 | 36.7 kBtu/ft² | 18 tCO₂e |
| 2023 | 96 | +11 | 42.6 kBtu/ft² | 24 tCO₂e |
| 2022 | 85 | -5 | 54.2 kBtu/ft² | 33 tCO₂e |
| 2021 | 90 | -5 | 48.7 kBtu/ft² | 27 tCO₂e |
| 2020 | 95 | +1 | 41.1 kBtu/ft² | 27 tCO₂e |
| 2019 | 94 | -1 | 43.6 kBtu/ft² | 30 tCO₂e |
| 2018 | 95 | +3 | 40.2 kBtu/ft² | 25 tCO₂e |
| 2017 | 92 | +1 | 44.7 kBtu/ft² | 29 tCO₂e |
| 2016 | 91 | -3 | 42.4 kBtu/ft² | 27 tCO₂e |
| 2015 | 94 | 41.1 kBtu/ft² | 27 tCO₂e |
Compliance context
Seattle Energy Benchmarking Ordinance (SMC 22.920)
Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 13 W CREMONA ST
- City
- Seattle
- State
- Washington
- ZIP
- 98119
- Coordinates
- 47.64931, -122.35854
Within ~1 km
Nearby benchmarked buildings
College/University · 529,663 sq ft
- Queen Anne At Rodgers Parkscore 97
Senior Living Community · 139,061 sq ft
College/University · 135,520 sq ft
- The Burke Bldgscore —
Office · 124,071 sq ft
- Henry Apartmentsscore 100
Multifamily Housing · 108,857 sq ft
- The Evanston Buildingscore 54
Office · 90,000 sq ft
See also: most efficient in Seattle · biggest emitters
How does The Wesley At Cremona compare with other college/university buildings in Seattle?
The latest disclosures cover 26 college/university buildings in Seattle, out of 3,871 buildings citywide. Its site EUI of 35.7 kBtu/ft² is about 38% below the average of 57.5 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.8 kgCO₂e/ft² is about 44% below the group average of 1.4 kgCO₂e/ft².
At 24,501 sq ft, it is about 97% below the average floor area of 803,209 sq ft for those buildings. It was built in 2004, 36 years later than the group's average year built (1968). Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².
How has The Wesley At Cremona's energy performance changed over time?
BuildingCensus holds 11 Seattle disclosures for The Wesley At Cremona, covering report years 2015–2025. Its ENERGY STAR score went from 94 in 2015 to 95 in 2024 (+1 points); its best year on file was 2023, at 96. Site EUI moved from 41.1 kBtu/ft² (2015) to 35.7 kBtu/ft² (2025), a 13% decrease. Reported emissions went from 27 tCO₂e to 16 tCO₂e over the same span (down 39%).
What does a site EUI of 35.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. The Wesley At Cremona's 35.7 kBtu/ft² across 24,501 sq ft works out to about 0.9 billion Btu (256 MWh-equivalent) in 2025. Its source EUI of 77.6 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 139,555 kWh of electricity and 2,643 therms of natural gas for the year.
Which law requires The Wesley At Cremona to report its energy use?
The Wesley At Cremona reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:21149:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.
More college/university buildings in Seattle
- Cornish (Notions)· 21,600 sq ft
- Uw Waterfront Activities Center· 20,904 sq ft · EUI 1.5 kBtu/ft²
- Seattle Pacific University: Student Union Building· 20,289 sq ft · EUI 98.6 kBtu/ft²
- College/University buildings in Seattle· 26 benchmarked
- All Seattle benchmarked buildings· Seattle Energy Benchmarking Ordinance (SMC 22.920)
- Most efficient large buildings in Seattle
- Least efficient large buildings in Seattle
- Biggest emitters in Seattle
Frequently asked questions
What is The Wesley At Cremona's energy grade?
The Wesley At Cremona did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 35.7 kBtu/ft².
How much energy does The Wesley At Cremona use?
Its 2025 site energy-use intensity was 35.7 kBtu/ft² (77.6 kBtu/ft² source) across 24,501 sq ft, including 139,555 kWh of electricity and 2,643 therms of natural gas.
What are The Wesley At Cremona's carbon emissions?
The Wesley At Cremona reported 16 tCO₂e of greenhouse-gas emissions (0.8 kgCO₂e/ft²) for 2025.
Where is The Wesley At Cremona?
The Wesley At Cremona is at 13 W CREMONA ST, in Seattle, Washington 98119. Its coordinates are 47.64931, -122.35854 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is The Wesley At Cremona and when was it built?
The Wesley At Cremona has 24,501 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 2004 as its year built. It is classed as college/university.
Is The Wesley At Cremona covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?
Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).
Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “The Wesley At Cremona, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/the-wesley-at-cremona-6cb634b9 (data as of October 2, 2026).