BuildingCensus
–

Villa Anita Apts

Multifamily Housing in Seattle, WA · 2231 FRANKLIN AVE E · 98102

At a glance

Villa Anita Apts is a 20,383-square-foot multifamily housing building at 2231 FRANKLIN AVE E in Seattle, Washington, built in 1977. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 22.3 kBtu/ft² and 3 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2025
Site EUI
22.3
kBtu/ft²
GHG emissions
3
tCO₂e
GHG intensity
0.1
kgCO₂e/ft²
Floor area
20,383
sq ft
Year built
1977
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI22.3 kBtu/ft²
Source EUI62.5 kBtu/ft²
GHG emissions3 tCO₂e
GHG intensity0.1 kgCO₂e/ft²
Electricity133,376 kWh
Gross floor area20,383 sq ft
Source recordseattle:22983:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest—22.3 kBtu/ft²3 tCO₂e
2024—22.1 kBtu/ft²3 tCO₂e
2023—23.2 kBtu/ft²3 tCO₂e
2022—23.5 kBtu/ft²3 tCO₂e
2021—20.8 kBtu/ft²3 tCO₂e
2020—20.7 kBtu/ft²2 tCO₂e
2019—20.3 kBtu/ft²2 tCO₂e
2018—20.0 kBtu/ft²2 tCO₂e
2017—22.6 kBtu/ft²3 tCO₂e
2016—21.2 kBtu/ft²3 tCO₂e
20159320.8 kBtu/ft²3 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
2231 FRANKLIN AVE E
State
Washington
ZIP
98102
Coordinates
47.63935, -122.32497

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Villa Anita Apts compare with other multifamily housing buildings in Seattle?

The latest disclosures cover 1,971 multifamily housing buildings in Seattle, out of 3,871 buildings citywide. Its site EUI of 22.3 kBtu/ft² is about 36% below the average of 34.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.1 kgCO₂e/ft² is about 81% below the group average of 0.7 kgCO₂e/ft².

At 20,383 sq ft, it is about 76% below the average floor area of 86,468 sq ft for those buildings. It was built in 1977, 6 years earlier than the group's average year built (1983). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².

How has Villa Anita Apts's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Villa Anita Apts, covering report years 2015–2025. Site EUI moved from 20.8 kBtu/ft² (2015) to 22.3 kBtu/ft² (2025), an 7% increase. Reported emissions went from 3 tCO₂e to 3 tCO₂e over the same span (up 5%).

What does a site EUI of 22.3 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Villa Anita Apts's 22.3 kBtu/ft² across 20,383 sq ft works out to about 0.5 billion Btu (133 MWh-equivalent) in 2025. Its source EUI of 62.5 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 133,376 kWh of electricity for the year.

Which law requires Villa Anita Apts to report its energy use?

Villa Anita Apts reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:22983:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More multifamily housing buildings in Seattle

Frequently asked questions

What is Villa Anita Apts's energy grade?

Villa Anita Apts did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 22.3 kBtu/ft².

How much energy does Villa Anita Apts use?

Its 2025 site energy-use intensity was 22.3 kBtu/ft² (62.5 kBtu/ft² source) across 20,383 sq ft, including 133,376 kWh of electricity.

What are Villa Anita Apts's carbon emissions?

Villa Anita Apts reported 3 tCO₂e of greenhouse-gas emissions (0.1 kgCO₂e/ft²) for 2025.

Where is Villa Anita Apts?

Villa Anita Apts is at 2231 FRANKLIN AVE E, in Seattle, Washington 98102. Its coordinates are 47.63935, -122.32497 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Villa Anita Apts and when was it built?

Villa Anita Apts has 20,383 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1977 as its year built. It is classed as multifamily housing.

Is Villa Anita Apts covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Villa Anita Apts, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/villa-anita-apts-b1b625d3 (data as of October 2, 2026).