BuildingCensus
B

0353 Hall Of Justice

Courthouse in California, CA · 330 W Broadway, San Diego · 92101

At a glance

0353 Hall Of Justice is a 379,054-square-foot courthouse building at 330 W Broadway, San Diego in San Diego, California, built in 1996. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 75 out of 100 (grade B), a site energy-use intensity of 43.1 kBtu/ft² and 1,074 tCO₂e of greenhouse-gas emissions. That score is higher than 70% of the 93 scored courthouse buildings in California.

ENERGY STAR score
75
band B · 2024
Site EUI
43.1
kBtu/ft²
GHG emissions
1,074
tCO₂e
GHG intensity
2.8
kgCO₂e/ft²
Floor area
379,054
sq ft
Year built
1996
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score75 (band B)
Site EUI43.1 kBtu/ft²
Source EUI—
GHG emissions1,074 tCO₂e
GHG intensity2.8 kgCO₂e/ft²
Electricity4,603,887 kWh
Natural gas5,905 therms
Gross floor area379,054 sq ft
Source recordcalifornia:3680820:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest7543.1 kBtu/ft²1,074 tCO₂e
2023—41.0 kBtu/ft²—
202276-1244.8 kBtu/ft²1,131 tCO₂e
20218834.9 kBtu/ft²814 tCO₂e
2020———
20196854.0 kBtu/ft²1,357 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
330 W Broadway, San Diego
State
California
ZIP
92101
Coordinates
32.71634, -117.16601

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does 0353 Hall Of Justice compare with other courthouse buildings in California?

The latest disclosures cover 114 courthouse buildings in California, out of 40,029 buildings citywide. 0353 Hall Of Justice's ENERGY STAR score of 75 compares with an average of 61 across the 93 that report a score; it scores higher than 70% of them and lower than 27%. Its site EUI of 43.1 kBtu/ft² is about 44% below the average of 76.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 2.8 kgCO₂e/ft² is about 40% below the group average of 4.7 kgCO₂e/ft².

At 379,054 sq ft, it is about twice the average floor area of 184,912 sq ft for those buildings. It was built in 1996, 14 years later than the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 178 courthouse buildings average an ENERGY STAR score of 62 and a site EUI of 76.2 kBtu/ft².

How has 0353 Hall Of Justice's energy performance changed over time?

BuildingCensus holds 6 California disclosures for 0353 Hall Of Justice, covering report years 2019–2024. Its ENERGY STAR score went from 68 in 2019 to 75 in 2024 (+7 points); its best year on file was 2021, at 88. Site EUI moved from 54.0 kBtu/ft² (2019) to 43.1 kBtu/ft² (2024), a 20% decrease. Reported emissions went from 1,357 tCO₂e to 1,074 tCO₂e over the same span (down 21%).

What does an ENERGY STAR score of 75 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 75 means the building performs better than about 75% of its national peers. BuildingCensus bands the score into report-card grades; 75 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 0353 Hall Of Justice's 43.1 kBtu/ft² across 379,054 sq ft works out to about 16.3 billion Btu (4,788 MWh-equivalent) in 2024. The disclosure also reports 4,603,887 kWh of electricity and 5,905 therms of natural gas for the year.

Which law requires 0353 Hall Of Justice to report its energy use?

0353 Hall Of Justice reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:3680820:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More courthouse buildings in California

Frequently asked questions

What is 0353 Hall Of Justice's energy grade?

0353 Hall Of Justice scores 75 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 0353 Hall Of Justice use?

Its 2024 site energy-use intensity was 43.1 kBtu/ft² across 379,054 sq ft, including 4,603,887 kWh of electricity and 5,905 therms of natural gas.

What are 0353 Hall Of Justice's carbon emissions?

0353 Hall Of Justice reported 1,074 tCO₂e of greenhouse-gas emissions (2.8 kgCO₂e/ft²) for 2024.

Where is 0353 Hall Of Justice?

0353 Hall Of Justice is at 330 W Broadway, San Diego, in San Diego, California 92101. Its coordinates are 32.71634, -117.16601 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is 0353 Hall Of Justice and when was it built?

0353 Hall Of Justice has 379,054 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1996 as its year built. It is classed as courthouse.

Is 0353 Hall Of Justice covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “0353 Hall Of Justice, San Diego, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/0353-hall-of-justice-d1880481 (data as of July 9, 2026).