BuildingCensus
B

07-E3 Richard E. Arnason Justice Center

Courthouse in California, CA · 1000 Center Drive, Pittsburg · 94565

At a glance

07-E3 Richard E. Arnason Justice Center is a 73,454-square-foot courthouse building at 1000 Center Drive, Pittsburg in Pittsburg, California, built in 2010. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 75 out of 100 (grade B), a site energy-use intensity of 49.0 kBtu/ft² and 226 tCO₂e of greenhouse-gas emissions. That score is higher than 70% of the 93 scored courthouse buildings in California.

ENERGY STAR score
75
band B · 2024
Site EUI
49.0
kBtu/ft²
GHG emissions
226
tCO₂e
GHG intensity
3.1
kgCO₂e/ft²
Floor area
73,454
sq ft
Year built
2010
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 4 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score75 (band B)
Site EUI49.0 kBtu/ft²
Source EUI—
GHG emissions226 tCO₂e
GHG intensity3.1 kgCO₂e/ft²
Electricity785,341 kWh
Natural gas9,005 therms
Gross floor area73,454 sq ft
Source recordcalifornia:7815739:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest75+749.0 kBtu/ft²226 tCO₂e
202368+1858.8 kBtu/ft²278 tCO₂e
202250+590.2 kBtu/ft²399 tCO₂e
202145-11100.2 kBtu/ft²414 tCO₂e
202056-1774.5 kBtu/ft²333 tCO₂e
201973+250.5 kBtu/ft²248 tCO₂e
20187151.4 kBtu/ft²251 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1000 Center Drive, Pittsburg
State
California
ZIP
94565
Coordinates
38.01933, -121.88979

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does 07-E3 Richard E. Arnason Justice Center compare with other courthouse buildings in California?

The latest disclosures cover 114 courthouse buildings in California, out of 40,029 buildings citywide. 07-E3 Richard E. Arnason Justice Center's ENERGY STAR score of 75 compares with an average of 61 across the 93 that report a score; it scores higher than 70% of them and lower than 27%. Its site EUI of 49.0 kBtu/ft² is about 36% below the average of 76.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 3.1 kgCO₂e/ft² is about 35% below the group average of 4.7 kgCO₂e/ft².

At 73,454 sq ft, it is about 60% below the average floor area of 184,912 sq ft for those buildings. It was built in 2010, 28 years later than the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 178 courthouse buildings average an ENERGY STAR score of 62 and a site EUI of 76.2 kBtu/ft².

How has 07-E3 Richard E. Arnason Justice Center's energy performance changed over time?

BuildingCensus holds 7 California disclosures for 07-E3 Richard E. Arnason Justice Center, covering report years 2018–2024. Its ENERGY STAR score went from 71 in 2018 to 75 in 2024 (+4 points). Site EUI moved from 51.4 kBtu/ft² (2018) to 49.0 kBtu/ft² (2024), a 5% decrease. Reported emissions went from 251 tCO₂e to 226 tCO₂e over the same span (down 10%).

What does an ENERGY STAR score of 75 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 75 means the building performs better than about 75% of its national peers. BuildingCensus bands the score into report-card grades; 75 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 07-E3 Richard E. Arnason Justice Center's 49.0 kBtu/ft² across 73,454 sq ft works out to about 3.6 billion Btu (1,055 MWh-equivalent) in 2024. The disclosure also reports 785,341 kWh of electricity and 9,005 therms of natural gas for the year.

Which law requires 07-E3 Richard E. Arnason Justice Center to report its energy use?

07-E3 Richard E. Arnason Justice Center reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:7815739:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More courthouse buildings in California

Frequently asked questions

What is 07-E3 Richard E. Arnason Justice Center's energy grade?

07-E3 Richard E. Arnason Justice Center scores 75 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 07-E3 Richard E. Arnason Justice Center use?

Its 2024 site energy-use intensity was 49.0 kBtu/ft² across 73,454 sq ft, including 785,341 kWh of electricity and 9,005 therms of natural gas.

What are 07-E3 Richard E. Arnason Justice Center's carbon emissions?

07-E3 Richard E. Arnason Justice Center reported 226 tCO₂e of greenhouse-gas emissions (3.1 kgCO₂e/ft²) for 2024.

Where is 07-E3 Richard E. Arnason Justice Center?

07-E3 Richard E. Arnason Justice Center is at 1000 Center Drive, Pittsburg, in Pittsburg, California 94565. Its coordinates are 38.01933, -121.88979 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is 07-E3 Richard E. Arnason Justice Center and when was it built?

07-E3 Richard E. Arnason Justice Center has 73,454 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2010 as its year built. It is classed as courthouse.

Is 07-E3 Richard E. Arnason Justice Center covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “07-E3 Richard E. Arnason Justice Center, Pittsburg, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/07-e3-richard-e-arnason-justice-center-7a160316 (data as of July 9, 2026).