1025-1059 East Capitol Expressway
Strip Mall in California, CA · 1025-1059 East Capitol Expressway, San Jose · 95121
At a glance
1025-1059 East Capitol Expressway is a 89,995-square-foot strip mall building at 1025-1059 East Capitol Expressway, San Jose in San Jose, California, built in 1978. In its 2019 California benchmarking disclosure it reported a site energy-use intensity of 112.7 kBtu/ft² and 639 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2019
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 112.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 639 tCO₂e |
| GHG intensity | 7.1 kgCO₂e/ft² |
| Electricity | 1,744,457 kWh |
| Natural gas | 41,355 therms |
| Gross floor area | 89,995 sq ft |
| Source record | california:11662908:2019 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1025-1059 East Capitol Expressway, San Jose
- City
- California
- State
- California
- ZIP
- 95121
- Coordinates
- 37.29965, -121.82232
Within ~1 km
Nearby benchmarked buildings
- Gould Centerscore —
Strip Mall · 214,570 sq ft
- Gould Plazascore —
Other - Mall · 74,734 sq ft
See also: most efficient in California · biggest emitters
How does 1025-1059 East Capitol Expressway compare with other strip mall buildings in California?
The latest disclosures cover 937 strip mall buildings in California, out of 40,029 buildings citywide. Its site EUI of 112.7 kBtu/ft² is about 50% above the average of 75.2 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 7.1 kgCO₂e/ft² is about 51% above the group average of 4.7 kgCO₂e/ft².
At 89,995 sq ft, it is about 28% below the average floor area of 125,816 sq ft for those buildings. It was built in 1978, 7 years earlier than the group's average year built (1985). Across all 24 jurisdictions BuildingCensus covers, the 1,607 strip mall buildings average an ENERGY STAR score of 68 and a site EUI of 83.1 kBtu/ft².
What does a site EUI of 112.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 1025-1059 East Capitol Expressway's 112.7 kBtu/ft² across 89,995 sq ft works out to about 10.1 billion Btu (2,972 MWh-equivalent) in 2019. The disclosure also reports 1,744,457 kWh of electricity and 41,355 therms of natural gas for the year.
Which law requires 1025-1059 East Capitol Expressway to report its energy use?
1025-1059 East Capitol Expressway reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2019 disclosure (source record california:11662908:2019). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More strip mall buildings in California
- 4754 Old Redwood Hwy· 89,736 sq ft · EUI 23.7 kBtu/ft²
- 2040 El Camino Real· 89,617 sq ft · EUI 62.9 kBtu/ft²
- 1950 N. Imperial Ave - Equimax· 89,600 sq ft · EUI 28.7 kBtu/ft²
- Pico Rivera Marketplace· 89,489 sq ft · EUI 28.7 kBtu/ft²
- Mowry East· 89,477 sq ft · EUI 48.6 kBtu/ft²
- Laguna Station Llc (Lg73)· 89,188 sq ft · EUI 286.6 kBtu/ft²
- Strip Mall buildings in California· 937 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is 1025-1059 East Capitol Expressway's energy grade?
1025-1059 East Capitol Expressway did not report an ENERGY STAR score in its 2019 disclosure, but its site energy-use intensity was 112.7 kBtu/ft².
How much energy does 1025-1059 East Capitol Expressway use?
Its 2019 site energy-use intensity was 112.7 kBtu/ft² across 89,995 sq ft, including 1,744,457 kWh of electricity and 41,355 therms of natural gas.
What are 1025-1059 East Capitol Expressway's carbon emissions?
1025-1059 East Capitol Expressway reported 639 tCO₂e of greenhouse-gas emissions (7.1 kgCO₂e/ft²) for 2019.
Where is 1025-1059 East Capitol Expressway?
1025-1059 East Capitol Expressway is at 1025-1059 East Capitol Expressway, San Jose, in San Jose, California 95121. Its coordinates are 37.29965, -121.82232 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is 1025-1059 East Capitol Expressway and when was it built?
1025-1059 East Capitol Expressway has 89,995 sq ft of gross floor area, as reported in its 2019 disclosure. The disclosure lists 1978 as its year built. It is classed as strip mall.
Is 1025-1059 East Capitol Expressway covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2019 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “1025-1059 East Capitol Expressway, San Jose, California — 2019 benchmarking disclosure”, https://buildingcensus.com/buildings/california/1025-1059-east-capitol-expressway-31bdd6cc (data as of July 9, 2026).