30-E1 Harbor Justice Center - Newport Beach Facility
Courthouse in California, CA · 4601 Jamboree Road, Newport Beach · 92660
At a glance
30-E1 Harbor Justice Center - Newport Beach Facility is a 110,855-square-foot courthouse building at 4601 Jamboree Road, Newport Beach in Newport Beach, California, built in 1975. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 60 out of 100 (grade C), a site energy-use intensity of 67.2 kBtu/ft² and 462 tCO₂e of greenhouse-gas emissions. That score is higher than 44% of the 93 scored courthouse buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 60 (band C) |
| Site EUI | 67.2 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 462 tCO₂e |
| GHG intensity | 4.2 kgCO₂e/ft² |
| Electricity | 1,431,297 kWh |
| Natural gas | 25,981 therms |
| Gross floor area | 110,855 sq ft |
| Source record | california:4404963:2024 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 4601 Jamboree Road, Newport Beach
- City
- California
- State
- California
- ZIP
- 92660
- Coordinates
- 33.66527, -117.85596
Within ~1 km
Nearby benchmarked buildings
- One Uptown (Np002)score 96
Multifamily Housing · 862,992 sq ft
- Elements 1B (Lm025)score 98
Multifamily Housing · 640,879 sq ft
- Boardwalk Office Associatesscore 92
Mixed Use Property · 555,601 sq ft
- Toscana - 29174score —
Parking · 510,699 sq ft
- 4000 Macarthurscore 68
Office · 376,780 sq ft
- Newport Beach Ca Renscore 67
Hotel · 347,106 sq ft
See also: most efficient in California · biggest emitters
How does 30-E1 Harbor Justice Center - Newport Beach Facility compare with other courthouse buildings in California?
The latest disclosures cover 114 courthouse buildings in California, out of 40,029 buildings citywide. 30-E1 Harbor Justice Center - Newport Beach Facility's ENERGY STAR score of 60 compares with an average of 61 across the 93 that report a score; it scores higher than 44% of them and lower than 54%. Its site EUI of 67.2 kBtu/ft² is about 12% below the average of 76.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 4.2 kgCO₂e/ft² is about 11% below the group average of 4.7 kgCO₂e/ft².
At 110,855 sq ft, it is about 40% below the average floor area of 184,912 sq ft for those buildings. It was built in 1975, 7 years earlier than the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 178 courthouse buildings average an ENERGY STAR score of 62 and a site EUI of 76.2 kBtu/ft².
What does an ENERGY STAR score of 60 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 60 means the building performs better than about 60% of its national peers. BuildingCensus bands the score into report-card grades; 60 falls in band C — below median (55–69). It sits 15 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 30-E1 Harbor Justice Center - Newport Beach Facility's 67.2 kBtu/ft² across 110,855 sq ft works out to about 7.4 billion Btu (2,183 MWh-equivalent) in 2024. The disclosure also reports 1,431,297 kWh of electricity and 25,981 therms of natural gas for the year.
Which law requires 30-E1 Harbor Justice Center - Newport Beach Facility to report its energy use?
30-E1 Harbor Justice Center - Newport Beach Facility reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:4404963:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More courthouse buildings in California
- 31-H1 Hon. Howard G. Gibson Courthouse· 110,700 sq ft · score 62 (C)
- 37-F2 North County Regional Center - North· 110,296 sq ft
- 34-D1 Carol Miller Justice Center Court Facility· 108,342 sq ft · score 83 (B)
- 19-V1 East Los Angeles Courthouse· 105,627 sq ft · score 43 (D)
- 34-C2 Juvenile Courthouse· 101,815 sq ft · score 61 (C)
- 07-A2 Wakefield Taylor Courthouse· 100,687 sq ft · score 80 (B)
- Courthouse buildings in California· 114 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is 30-E1 Harbor Justice Center - Newport Beach Facility's energy grade?
30-E1 Harbor Justice Center - Newport Beach Facility scores 60 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does 30-E1 Harbor Justice Center - Newport Beach Facility use?
Its 2024 site energy-use intensity was 67.2 kBtu/ft² across 110,855 sq ft, including 1,431,297 kWh of electricity and 25,981 therms of natural gas.
What are 30-E1 Harbor Justice Center - Newport Beach Facility's carbon emissions?
30-E1 Harbor Justice Center - Newport Beach Facility reported 462 tCO₂e of greenhouse-gas emissions (4.2 kgCO₂e/ft²) for 2024.
Where is 30-E1 Harbor Justice Center - Newport Beach Facility?
30-E1 Harbor Justice Center - Newport Beach Facility is at 4601 Jamboree Road, Newport Beach, in Newport Beach, California 92660. Its coordinates are 33.66527, -117.85596 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is 30-E1 Harbor Justice Center - Newport Beach Facility and when was it built?
30-E1 Harbor Justice Center - Newport Beach Facility has 110,855 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1975 as its year built. It is classed as courthouse.
Is 30-E1 Harbor Justice Center - Newport Beach Facility covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “30-E1 Harbor Justice Center - Newport Beach Facility, Newport Beach, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/30-e1-harbor-justice-center-newport-beach-facility-46ea6fa7 (data as of July 9, 2026).