3201 Camino Del Sol - Ab802
Manufacturing/Industrial Plant in California, CA · 3201 Camino Del Sol, Oxnard · 93030
At a glance
3201 Camino Del Sol - Ab802 is a 60,889-square-foot manufacturing/industrial plant at 3201 Camino Del Sol, Oxnard in Oxnard, California, built in 2004. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 155.5 kBtu/ft² and 582 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 155.5 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 582 tCO₂e |
| GHG intensity | 9.6 kgCO₂e/ft² |
| Electricity | 1,750,448 kWh |
| Natural gas | 34,978 therms |
| Gross floor area | 60,889 sq ft |
| Source record | california:34547325:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 155.5 kBtu/ft² | 582 tCO₂e | |
| 2023 | — | 144.7 kBtu/ft² | 561 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 3201 Camino Del Sol, Oxnard
- City
- California
- State
- California
- ZIP
- 93030
- Coordinates
- 34.20546, -119.13052
Within ~1 km
Nearby benchmarked buildings
- Sysco Venturascore 74
Distribution Center · 275,549 sq ft
- Cdsscore 53
Refrigerated Warehouse · 220,000 sq ft
Non-Refrigerated Warehouse · 125,514 sq ft
- Volkswagen Group Of Americascore —
Laboratory · 89,811 sq ft
- Leeds Mosherscore —
Manufacturing/Industrial Plant · 87,000 sq ft
Non-Refrigerated Warehouse · 68,650 sq ft
See also: most efficient in California · biggest emitters
How does 3201 Camino Del Sol - Ab802 compare with other manufacturing/industrial plant buildings in California?
The latest disclosures cover 982 manufacturing/industrial plant buildings in California, out of 40,029 buildings citywide. Its site EUI of 155.5 kBtu/ft² is about 22% above the average of 127.7 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 9.6 kgCO₂e/ft² is about 29% above the group average of 7.4 kgCO₂e/ft².
At 60,889 sq ft, it is about 55% below the average floor area of 135,409 sq ft for those buildings. It was built in 2004, 22 years later than the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².
How has 3201 Camino Del Sol - Ab802's energy performance changed over time?
BuildingCensus holds 2 California disclosures for 3201 Camino Del Sol - Ab802, covering report years 2023–2024. Site EUI moved from 144.7 kBtu/ft² (2023) to 155.5 kBtu/ft² (2024), an 7% increase. Reported emissions went from 561 tCO₂e to 582 tCO₂e over the same span (up 4%).
What does a site EUI of 155.5 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 3201 Camino Del Sol - Ab802's 155.5 kBtu/ft² across 60,889 sq ft works out to about 9.5 billion Btu (2,775 MWh-equivalent) in 2024. The disclosure also reports 1,750,448 kWh of electricity and 34,978 therms of natural gas for the year.
Which law requires 3201 Camino Del Sol - Ab802 to report its energy use?
3201 Camino Del Sol - Ab802 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:34547325:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More manufacturing/industrial plant buildings in California
- 9701 Canoga Avenue· 60,856 sq ft · EUI 3.4 kBtu/ft²
- Blreh9 (R5Reh9) - Rehco Road 9125· 60,786 sq ft · EUI 18.9 kBtu/ft²
- Br40115-Gpt Fulton Dr - 5160 Fulton Dr, Fairfield, Ca· 60,694 sq ft · EUI 4.3 kBtu/ft²
- Guzik Technical Enterprises· 60,618 sq ft · EUI 54.9 kBtu/ft²
- 2440 Crystal St· 60,423 sq ft · EUI 12.2 kBtu/ft²
- 4631 Beloit Dr, Sacramento, Ca 95838, Usa· 60,380 sq ft · EUI 8.4 kBtu/ft²
- Manufacturing/Industrial Plant buildings in California· 982 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is 3201 Camino Del Sol - Ab802's energy grade?
3201 Camino Del Sol - Ab802 did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 155.5 kBtu/ft².
How much energy does 3201 Camino Del Sol - Ab802 use?
Its 2024 site energy-use intensity was 155.5 kBtu/ft² across 60,889 sq ft, including 1,750,448 kWh of electricity and 34,978 therms of natural gas.
What are 3201 Camino Del Sol - Ab802's carbon emissions?
3201 Camino Del Sol - Ab802 reported 582 tCO₂e of greenhouse-gas emissions (9.6 kgCO₂e/ft²) for 2024.
Where is 3201 Camino Del Sol - Ab802?
3201 Camino Del Sol - Ab802 is at 3201 Camino Del Sol, Oxnard, in Oxnard, California 93030. Its coordinates are 34.20546, -119.13052 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is 3201 Camino Del Sol - Ab802 and when was it built?
3201 Camino Del Sol - Ab802 has 60,889 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2004 as its year built. It is classed as manufacturing/industrial plant.
Is 3201 Camino Del Sol - Ab802 covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “3201 Camino Del Sol - Ab802, Oxnard, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/3201-camino-del-sol-ab802-4b78e1dd (data as of July 9, 2026).