932 Parker
Other - Services in California, CA · 932 Parker Street, Berkeley · 94710
At a glance
932 Parker is a 65,764-square-foot other - services building at 932 Parker Street, Berkeley in Berkeley, California, built in 1950. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 24.6 kBtu/ft².
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 24.6 kBtu/ft² |
| Source EUI | — |
| GHG emissions | — |
| GHG intensity | 1.6 kgCO₂e/ft² |
| Electricity | 293,310 kWh |
| Gross floor area | 65,764 sq ft |
| Source record | california:6384130:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 24.6 kBtu/ft² | — | |
| 2023 | — | 25.4 kBtu/ft² | — | |
| 2021 | — | 19.7 kBtu/ft² | 74 tCO₂e | |
| 2018 | — | 14.9 kBtu/ft² | 65 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 932 Parker Street, Berkeley
- City
- California
- State
- California
- ZIP
- 94710
- Coordinates
- 37.85843, -122.29202
Within ~1 km
Nearby benchmarked buildings
Other · 263,943 sq ft
- 2600 Tenth (Zmc)score 47
Office · 121,172 sq ft
- Berkeley Bowl Westscore 92
Supermarket/Grocery Store · 100,965 sq ft
- The Higby (Hg064)score 69
Multifamily Housing · 82,921 sq ft
- 700 Heinz Ave.score —
Office · 82,400 sq ft
- 2560 Ninth Streetscore 97
Office · 74,062 sq ft
See also: most efficient in California · biggest emitters
How does 932 Parker compare with other other - services buildings in California?
The latest disclosures cover 39 other - services buildings in California, out of 40,029 buildings citywide. Its site EUI of 24.6 kBtu/ft² is about 60% below the average of 61.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.6 kgCO₂e/ft² is about 59% below the group average of 3.9 kgCO₂e/ft².
At 65,764 sq ft, it is about half of the average floor area of 128,926 sq ft for those buildings. It was built in 1950, 31 years earlier than the group's average year built (1981).
How has 932 Parker's energy performance changed over time?
BuildingCensus holds 4 California disclosures for 932 Parker, covering report years 2018, 2021, 2023, 2024. Site EUI moved from 14.9 kBtu/ft² (2018) to 24.6 kBtu/ft² (2024), an 65% increase. Reported emissions went from 65 tCO₂e to 74 tCO₂e over the same span (up 13%).
What does a site EUI of 24.6 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 932 Parker's 24.6 kBtu/ft² across 65,764 sq ft works out to about 1.6 billion Btu (474 MWh-equivalent) in 2024. The disclosure also reports 293,310 kWh of electricity for the year.
Which law requires 932 Parker to report its energy use?
932 Parker reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:6384130:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More other - services buildings in California
- Santa Clarita Corporate Yard· 64,122 sq ft · EUI 26.3 kBtu/ft²
- Sce - Wildomar Sc - Admin Bldg· 62,823 sq ft · EUI 72.7 kBtu/ft²
- In-Shape: Victorville North· 60,954 sq ft · EUI 99.7 kBtu/ft²
- Valley Vista Services· 60,648 sq ft · EUI 11.4 kBtu/ft²
- Emerald Textiles Colton· 59,863 sq ft · EUI 1342.1 kBtu/ft²
- Technovix, Inc· 58,598 sq ft
- Other - Services buildings in California· 39 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is 932 Parker's energy grade?
932 Parker did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 24.6 kBtu/ft².
How much energy does 932 Parker use?
Its 2024 site energy-use intensity was 24.6 kBtu/ft² across 65,764 sq ft, including 293,310 kWh of electricity.
What are 932 Parker's carbon emissions?
No greenhouse-gas emissions figure was reported for 2024.
Where is 932 Parker?
932 Parker is at 932 Parker Street, Berkeley, in Berkeley, California 94710. Its coordinates are 37.85843, -122.29202 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is 932 Parker and when was it built?
932 Parker has 65,764 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1950 as its year built. It is classed as other - services.
Is 932 Parker covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “932 Parker, Berkeley, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/932-parker-35d7d08c (data as of July 9, 2026).