BuildingCensus
–

Bayshore Tech Park - 3200 Bridge Parkway

Laboratory in California, CA · 3200 Bridge Parkway, Redwood City · 94065

At a glance

Bayshore Tech Park - 3200 Bridge Parkway is a 51,828-square-foot laboratory building at 3200 Bridge Parkway, Redwood City in Redwood City, California, built in 2001. In its 2023 California benchmarking disclosure it reported a site energy-use intensity of 97.8 kBtu/ft² and 299 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2023
Site EUI
97.8
kBtu/ft²
GHG emissions
299
tCO₂e
GHG intensity
5.8
kgCO₂e/ft²
Floor area
51,828
sq ft
Year built
2001
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI97.8 kBtu/ft²
Source EUI—
GHG emissions299 tCO₂e
GHG intensity5.8 kgCO₂e/ft²
Electricity482,883 kWh
Natural gas34,234 therms
Gross floor area51,828 sq ft
Source recordcalifornia:1923156:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest—97.8 kBtu/ft²299 tCO₂e
2021—50.3 kBtu/ft²145 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
3200 Bridge Parkway, Redwood City
State
California
ZIP
94065
Coordinates
37.53848, -122.25506

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Bayshore Tech Park - 3200 Bridge Parkway compare with other laboratory buildings in California?

The latest disclosures cover 308 laboratory buildings in California, out of 40,029 buildings citywide. Its site EUI of 97.8 kBtu/ft² is about half of the average of 181.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 5.8 kgCO₂e/ft² is about half of the group average of 11.1 kgCO₂e/ft².

At 51,828 sq ft, it is about 57% below the average floor area of 121,485 sq ft for those buildings. It was built in 2001, 9 years later than the group's average year built (1992). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².

How has Bayshore Tech Park - 3200 Bridge Parkway's energy performance changed over time?

BuildingCensus holds 2 California disclosures for Bayshore Tech Park - 3200 Bridge Parkway, covering report years 2021, 2023. Site EUI moved from 50.3 kBtu/ft² (2021) to 97.8 kBtu/ft² (2023), an 94% increase. Reported emissions went from 145 tCO₂e to 299 tCO₂e over the same span (up 106%).

What does a site EUI of 97.8 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Bayshore Tech Park - 3200 Bridge Parkway's 97.8 kBtu/ft² across 51,828 sq ft works out to about 5.1 billion Btu (1,486 MWh-equivalent) in 2023. The disclosure also reports 482,883 kWh of electricity and 34,234 therms of natural gas for the year.

Which law requires Bayshore Tech Park - 3200 Bridge Parkway to report its energy use?

Bayshore Tech Park - 3200 Bridge Parkway reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record california:1923156:2023). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More laboratory buildings in California

Frequently asked questions

What is Bayshore Tech Park - 3200 Bridge Parkway's energy grade?

Bayshore Tech Park - 3200 Bridge Parkway did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 97.8 kBtu/ft².

How much energy does Bayshore Tech Park - 3200 Bridge Parkway use?

Its 2023 site energy-use intensity was 97.8 kBtu/ft² across 51,828 sq ft, including 482,883 kWh of electricity and 34,234 therms of natural gas.

What are Bayshore Tech Park - 3200 Bridge Parkway's carbon emissions?

Bayshore Tech Park - 3200 Bridge Parkway reported 299 tCO₂e of greenhouse-gas emissions (5.8 kgCO₂e/ft²) for 2023.

Where is Bayshore Tech Park - 3200 Bridge Parkway?

Bayshore Tech Park - 3200 Bridge Parkway is at 3200 Bridge Parkway, Redwood City, in Redwood City, California 94065. Its coordinates are 37.53848, -122.25506 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Bayshore Tech Park - 3200 Bridge Parkway and when was it built?

Bayshore Tech Park - 3200 Bridge Parkway has 51,828 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 2001 as its year built. It is classed as laboratory.

Is Bayshore Tech Park - 3200 Bridge Parkway covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2023 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Bayshore Tech Park - 3200 Bridge Parkway, Redwood City, California — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/california/bayshore-tech-park-3200-bridge-parkway-d8eb08d4 (data as of July 9, 2026).