Bldg 2 - Ccc East (Phase Ii)
Distribution Center in California, CA · 2550 Merrill Avenue, Ontario · 91762
At a glance
Bldg 2 - Ccc East (Phase Ii) is a 50,151-square-foot distribution center at 2550 Merrill Avenue, Ontario in Ontario, California, built in 2021. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 100 out of 100 (grade A), a site energy-use intensity of 1.2 kBtu/ft² and 4 tCO₂e of greenhouse-gas emissions. That score is higher than 93% of the 2,485 scored distribution center buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 100 (band A) |
| Site EUI | 1.2 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 4 tCO₂e |
| GHG intensity | 0.1 kgCO₂e/ft² |
| Electricity | 17,815 kWh |
| Gross floor area | 50,151 sq ft |
| Source record | california:17726918:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 100 | ±0 | 1.2 kBtu/ft² | 4 tCO₂e |
| 2023 | 100 | ±0 | 1.4 kBtu/ft² | 5 tCO₂e |
| 2022 | 100 | ±0 | 1.3 kBtu/ft² | 5 tCO₂e |
| 2021 | 100 | 1.4 kBtu/ft² | 4 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 2550 Merrill Avenue, Ontario
- City
- California
- State
- California
- ZIP
- 91762
- Coordinates
- 33.98242, -117.59647
Within ~1 km
Nearby benchmarked buildings
Distribution Center · 1,197,820 sq ft
- Bldg 9 - Ccc East (Phase Ii)score 86
Distribution Center · 1,000,930 sq ft
- 7020-Ontario, Cascore 83
Distribution Center · 1,000,000 sq ft
- Bldg B - Ccc West (Phase I)score 82
Distribution Center · 700,280 sq ft
- Bldg 8 - Ccc East (Phase Ii)score 95
Distribution Center · 141,940 sq ft
- Bldg 7 - Ccc East (Phase Ii)score 41
Distribution Center · 133,220 sq ft
See also: most efficient in California · biggest emitters
How does Bldg 2 - Ccc East (Phase Ii) compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Bldg 2 - Ccc East (Phase Ii)'s ENERGY STAR score of 100 compares with an average of 67 across the 2,485 that report a score; it scores higher than 93% of them. Its site EUI of 1.2 kBtu/ft² is about 94% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.1 kgCO₂e/ft² is about 94% below the group average of 1.3 kgCO₂e/ft².
At 50,151 sq ft, it is about 79% below the average floor area of 238,298 sq ft for those buildings. It was built in 2021, 27 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
How has Bldg 2 - Ccc East (Phase Ii)'s energy performance changed over time?
BuildingCensus holds 4 California disclosures for Bldg 2 - Ccc East (Phase Ii), covering report years 2021–2024. Its ENERGY STAR score was 100 in both 2021 and 2024. Site EUI moved from 1.4 kBtu/ft² (2021) to 1.2 kBtu/ft² (2024), a 14% decrease. Reported emissions went from 4 tCO₂e to 4 tCO₂e over the same span (down 4%).
What does an ENERGY STAR score of 100 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: 100 is the top of the scale. BuildingCensus bands the score into report-card grades; 100 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Bldg 2 - Ccc East (Phase Ii)'s 1.2 kBtu/ft² across 50,151 sq ft works out to about 0.1 billion Btu (18 MWh-equivalent) in 2024. The disclosure also reports 17,815 kWh of electricity for the year.
Which law requires Bldg 2 - Ccc East (Phase Ii) to report its energy use?
Bldg 2 - Ccc East (Phase Ii) reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:17726918:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- Brep 16306-16326 Bloomfield Ave Llc· 50,096 sq ft · score 98 (A)
- 84, 3625 Old 44 Drive, Redding· 50,080 sq ft · score 44 (D)
- Dominguez #3· 50,003 sq ft
- 500 Valley· 50,000 sq ft · score 13 (D)
- G. Pucci & Sons· 50,000 sq ft · score 85 (A)
- Bmr-900 Gateway· 50,000 sq ft · score 91 (A)
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Bldg 2 - Ccc East (Phase Ii)'s energy grade?
Bldg 2 - Ccc East (Phase Ii) scores 100 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Bldg 2 - Ccc East (Phase Ii) use?
Its 2024 site energy-use intensity was 1.2 kBtu/ft² across 50,151 sq ft, including 17,815 kWh of electricity.
What are Bldg 2 - Ccc East (Phase Ii)'s carbon emissions?
Bldg 2 - Ccc East (Phase Ii) reported 4 tCO₂e of greenhouse-gas emissions (0.1 kgCO₂e/ft²) for 2024.
Where is Bldg 2 - Ccc East (Phase Ii)?
Bldg 2 - Ccc East (Phase Ii) is at 2550 Merrill Avenue, Ontario, in Ontario, California 91762. Its coordinates are 33.98242, -117.59647 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Bldg 2 - Ccc East (Phase Ii) and when was it built?
Bldg 2 - Ccc East (Phase Ii) has 50,151 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2021 as its year built. It is classed as distribution center.
Is Bldg 2 - Ccc East (Phase Ii) covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Bldg 2 - Ccc East (Phase Ii), Ontario, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/bldg-2-ccc-east-phase-ii-85cf3af7 (data as of July 9, 2026).