Bldg 6 - Ccc East (Phase Ii)
Distribution Center in California, CA · 5050 South Archibald Avenue, Ontario · 91762
At a glance
Bldg 6 - Ccc East (Phase Ii) is a 109,598-square-foot distribution center at 5050 South Archibald Avenue, Ontario in Ontario, California, built in 2021. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 82 out of 100 (grade B), a site energy-use intensity of 5.1 kBtu/ft² and 37 tCO₂e of greenhouse-gas emissions. That score is higher than 54% of the 2,485 scored distribution center buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 82 (band B) |
| Site EUI | 5.1 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 37 tCO₂e |
| GHG intensity | 0.3 kgCO₂e/ft² |
| Electricity | 164,680 kWh |
| Gross floor area | 109,598 sq ft |
| Source record | california:17727212:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 82 | -6 | 5.1 kBtu/ft² | 37 tCO₂e |
| 2023 | 88 | ±0 | 4.1 kBtu/ft² | 32 tCO₂e |
| 2022 | 88 | -10 | 4.2 kBtu/ft² | 32 tCO₂e |
| 2021 | 98 | 2.7 kBtu/ft² | 18 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 5050 South Archibald Avenue, Ontario
- City
- California
- State
- California
- ZIP
- 91762
- Coordinates
- 33.98105, -117.59422
Within ~1 km
Nearby benchmarked buildings
- Bldg 9 - Ccc East (Phase Ii)score 86
Distribution Center · 1,000,930 sq ft
- 7020-Ontario, Cascore 83
Distribution Center · 1,000,000 sq ft
Distribution Center · 501,649 sq ft
Non-Refrigerated Warehouse · 161,120 sq ft
- Bldg 8 - Ccc East (Phase Ii)score 95
Distribution Center · 141,940 sq ft
- Bldg 7 - Ccc East (Phase Ii)score 41
Distribution Center · 133,220 sq ft
See also: most efficient in California · biggest emitters
How does Bldg 6 - Ccc East (Phase Ii) compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Bldg 6 - Ccc East (Phase Ii)'s ENERGY STAR score of 82 compares with an average of 67 across the 2,485 that report a score; it scores higher than 54% of them and lower than 45%. Its site EUI of 5.1 kBtu/ft² is about 74% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.3 kgCO₂e/ft² is about 74% below the group average of 1.3 kgCO₂e/ft².
At 109,598 sq ft, it is about half of the average floor area of 238,298 sq ft for those buildings. It was built in 2021, 27 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
How has Bldg 6 - Ccc East (Phase Ii)'s energy performance changed over time?
BuildingCensus holds 4 California disclosures for Bldg 6 - Ccc East (Phase Ii), covering report years 2021–2024. Its ENERGY STAR score went from 98 in 2021 to 82 in 2024 (-16 points); its best year on file was 2021, at 98. Site EUI moved from 2.7 kBtu/ft² (2021) to 5.1 kBtu/ft² (2024), an 89% increase. Reported emissions went from 18 tCO₂e to 37 tCO₂e over the same span (up 106%).
What does an ENERGY STAR score of 82 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 82 means the building performs better than about 82% of its national peers. BuildingCensus bands the score into report-card grades; 82 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Bldg 6 - Ccc East (Phase Ii)'s 5.1 kBtu/ft² across 109,598 sq ft works out to about 0.6 billion Btu (164 MWh-equivalent) in 2024. The disclosure also reports 164,680 kWh of electricity for the year.
Which law requires Bldg 6 - Ccc East (Phase Ii) to report its energy use?
Bldg 6 - Ccc East (Phase Ii) reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:17727212:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- Eba05507 - Richmond 4· 109,594 sq ft
- 225, 21906 Arnold Center Road, Carson· 109,593 sq ft
- Lax09501 - South Bay Dis Ctr 15· 109,591 sq ft · score 68 (C)
- Slover Logistic Center· 109,506 sq ft · score 95 (A)
- Lax01510 - Industry Dis Ctr 10· 109,448 sq ft · score 87 (A)
- L&U Granite And Cabinet· 109,200 sq ft
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Bldg 6 - Ccc East (Phase Ii)'s energy grade?
Bldg 6 - Ccc East (Phase Ii) scores 82 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Bldg 6 - Ccc East (Phase Ii) use?
Its 2024 site energy-use intensity was 5.1 kBtu/ft² across 109,598 sq ft, including 164,680 kWh of electricity.
What are Bldg 6 - Ccc East (Phase Ii)'s carbon emissions?
Bldg 6 - Ccc East (Phase Ii) reported 37 tCO₂e of greenhouse-gas emissions (0.3 kgCO₂e/ft²) for 2024.
Where is Bldg 6 - Ccc East (Phase Ii)?
Bldg 6 - Ccc East (Phase Ii) is at 5050 South Archibald Avenue, Ontario, in Ontario, California 91762. Its coordinates are 33.98105, -117.59422 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Bldg 6 - Ccc East (Phase Ii) and when was it built?
Bldg 6 - Ccc East (Phase Ii) has 109,598 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2021 as its year built. It is classed as distribution center.
Is Bldg 6 - Ccc East (Phase Ii) covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Bldg 6 - Ccc East (Phase Ii), Ontario, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/bldg-6-ccc-east-phase-ii-f5fb908d (data as of July 9, 2026).