BuildingCensus
–

Bmr-3260 Bayshore

Laboratory in California, CA · 3260 Bayshore Boulevard, Brisbane · 94005

At a glance

Bmr-3260 Bayshore is a 61,444-square-foot laboratory building at 3260 Bayshore Boulevard, Brisbane in Brisbane, California, built in 2000. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 235.4 kBtu/ft² and 862 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
235.4
kBtu/ft²
GHG emissions
862
tCO₂e
GHG intensity
14.0
kgCO₂e/ft²
Floor area
61,444
sq ft
Year built
2000
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI235.4 kBtu/ft²
Source EUI—
GHG emissions862 tCO₂e
GHG intensity14.0 kgCO₂e/ft²
Electricity2,264,776 kWh
Natural gas65,739 therms
Gross floor area61,444 sq ft
Source recordcalifornia:3374296:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—235.4 kBtu/ft²862 tCO₂e
2023—224.9 kBtu/ft²865 tCO₂e
2022—259.6 kBtu/ft²973 tCO₂e
2021—217.8 kBtu/ft²765 tCO₂e
2019—218.7 kBtu/ft²836 tCO₂e
2018—241.7 kBtu/ft²906 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
3260 Bayshore Boulevard, Brisbane
State
California
ZIP
94005
Coordinates
37.69368, -122.40632

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Bmr-3260 Bayshore compare with other laboratory buildings in California?

The latest disclosures cover 308 laboratory buildings in California, out of 40,029 buildings citywide. Its site EUI of 235.4 kBtu/ft² is about 29% above the average of 181.8 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 14.0 kgCO₂e/ft² is about 26% above the group average of 11.1 kgCO₂e/ft².

At 61,444 sq ft, it is about half of the average floor area of 121,485 sq ft for those buildings. It was built in 2000, 8 years later than the group's average year built (1992). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².

How has Bmr-3260 Bayshore's energy performance changed over time?

BuildingCensus holds 6 California disclosures for Bmr-3260 Bayshore, covering report years 2018, 2019, 2021, 2022, 2023, 2024. Site EUI moved from 241.7 kBtu/ft² (2018) to 235.4 kBtu/ft² (2024), a 3% decrease. Reported emissions went from 906 tCO₂e to 862 tCO₂e over the same span (down 5%).

What does a site EUI of 235.4 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Bmr-3260 Bayshore's 235.4 kBtu/ft² across 61,444 sq ft works out to about 14.5 billion Btu (4,239 MWh-equivalent) in 2024. The disclosure also reports 2,264,776 kWh of electricity and 65,739 therms of natural gas for the year.

Which law requires Bmr-3260 Bayshore to report its energy use?

Bmr-3260 Bayshore reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:3374296:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More laboratory buildings in California

Frequently asked questions

What is Bmr-3260 Bayshore's energy grade?

Bmr-3260 Bayshore did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 235.4 kBtu/ft².

How much energy does Bmr-3260 Bayshore use?

Its 2024 site energy-use intensity was 235.4 kBtu/ft² across 61,444 sq ft, including 2,264,776 kWh of electricity and 65,739 therms of natural gas.

What are Bmr-3260 Bayshore's carbon emissions?

Bmr-3260 Bayshore reported 862 tCO₂e of greenhouse-gas emissions (14.0 kgCO₂e/ft²) for 2024.

Where is Bmr-3260 Bayshore?

Bmr-3260 Bayshore is at 3260 Bayshore Boulevard, Brisbane, in Brisbane, California 94005. Its coordinates are 37.69368, -122.40632 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Bmr-3260 Bayshore and when was it built?

Bmr-3260 Bayshore has 61,444 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2000 as its year built. It is classed as laboratory.

Is Bmr-3260 Bayshore covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Bmr-3260 Bayshore, Brisbane, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/bmr-3260-bayshore-db728b79 (data as of July 9, 2026).