Bulletin/Mission Building
Office in California, CA · 814 Mission Street, San Francisco · 94103
At a glance
Bulletin/Mission Building is a 115,249-square-foot office building at 814 Mission Street, San Francisco in San Francisco, California, built in 1925. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 100 out of 100 (grade A), a site energy-use intensity of 13.9 kBtu/ft² and 103 tCO₂e of greenhouse-gas emissions. That score is higher than 91% of the 4,912 scored office buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 100 (band A) |
| Site EUI | 13.9 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 103 tCO₂e |
| GHG intensity | 0.9 kgCO₂e/ft² |
| Electricity | 363,440 kWh |
| Natural gas | 3,848 therms |
| Gross floor area | 115,249 sq ft |
| Source record | california:6630777:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 100 | +1 | 13.9 kBtu/ft² | 103 tCO₂e |
| 2023 | 99 | +2 | 35.7 kBtu/ft² | 258 tCO₂e |
| 2022 | 97 | -1 | 42.1 kBtu/ft² | 299 tCO₂e |
| 2021 | 98 | +1 | 38.1 kBtu/ft² | 254 tCO₂e |
| 2020 | 97 | +6 | 37.6 kBtu/ft² | 270 tCO₂e |
| 2019 | 91 | +5 | 59.3 kBtu/ft² | 437 tCO₂e |
| 2018 | 86 | 69.5 kBtu/ft² | 507 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 814 Mission Street, San Francisco
- City
- California
- State
- California
- ZIP
- 94103
- Coordinates
- 37.78441, -122.40492
Within ~1 km
Nearby benchmarked buildings
- 555 Californiascore 75
Commercial · 1,968,807 sq ft
Hotel · 1,964,250 sq ft
Commercial · 1,964,250 sq ft
Hotel · 1,964,250 sq ft
- 555 California Streetscore 76
Office · 1,810,397 sq ft
Commercial · 1,684,713 sq ft
See also: most efficient in California · biggest emitters
How does Bulletin/Mission Building compare with other office buildings in California?
The latest disclosures cover 6,214 office buildings in California, out of 40,029 buildings citywide. Bulletin/Mission Building's ENERGY STAR score of 100 compares with an average of 75 across the 4,912 that report a score; it scores higher than 91% of them. Its site EUI of 13.9 kBtu/ft² is about 75% below the average of 56.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.9 kgCO₂e/ft² is about 75% below the group average of 3.6 kgCO₂e/ft².
At 115,249 sq ft, it is about 24% below the average floor area of 151,937 sq ft for those buildings. It was built in 1925, 60 years earlier than the group's average year built (1985). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².
How has Bulletin/Mission Building's energy performance changed over time?
BuildingCensus holds 7 California disclosures for Bulletin/Mission Building, covering report years 2018–2024. Its ENERGY STAR score went from 86 in 2018 to 100 in 2024 (+14 points). Site EUI moved from 69.5 kBtu/ft² (2018) to 13.9 kBtu/ft² (2024), a 80% decrease. Reported emissions went from 507 tCO₂e to 103 tCO₂e over the same span (down 80%).
What does an ENERGY STAR score of 100 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: 100 is the top of the scale. BuildingCensus bands the score into report-card grades; 100 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Bulletin/Mission Building's 13.9 kBtu/ft² across 115,249 sq ft works out to about 1.6 billion Btu (469 MWh-equivalent) in 2024. The disclosure also reports 363,440 kWh of electricity and 3,848 therms of natural gas for the year.
Which law requires Bulletin/Mission Building to report its energy use?
Bulletin/Mission Building reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:6630777:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More office buildings in California
- Dpss - Metro Special District Office (Ab 802)· 115,242 sq ft · score 70 (B)
- Rtr 5· 115,239 sq ft · score 35 (D)
- 1703-1735 Stewart St· 115,232 sq ft · score 97 (A)
- 00001 - Old Administration Building· 115,200 sq ft · score 79 (B)
- 00001-Old Administration Bldg.· 115,200 sq ft
- 4000 North First Street· 115,174 sq ft
- Office buildings in California· 6,214 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Bulletin/Mission Building's energy grade?
Bulletin/Mission Building scores 100 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Bulletin/Mission Building use?
Its 2024 site energy-use intensity was 13.9 kBtu/ft² across 115,249 sq ft, including 363,440 kWh of electricity and 3,848 therms of natural gas.
What are Bulletin/Mission Building's carbon emissions?
Bulletin/Mission Building reported 103 tCO₂e of greenhouse-gas emissions (0.9 kgCO₂e/ft²) for 2024.
Where is Bulletin/Mission Building?
Bulletin/Mission Building is at 814 Mission Street, San Francisco, in San Francisco, California 94103. Its coordinates are 37.78441, -122.40492 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Bulletin/Mission Building and when was it built?
Bulletin/Mission Building has 115,249 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1925 as its year built. It is classed as office.
Is Bulletin/Mission Building covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Bulletin/Mission Building, San Francisco, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/bulletin-mission-building-c145f5ba (data as of July 9, 2026).