Butte-Glenn Ccd Main Campus
College/University in California, CA · 3536 Butte Campus Drive, Oroville · 95965
At a glance
Butte-Glenn Ccd Main Campus is a 768,409-square-foot college/university building at 3536 Butte Campus Drive, Oroville in Oroville, California, built in 1974. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 57.0 kBtu/ft² and 1,352 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 57.0 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 1,352 tCO₂e |
| GHG intensity | 1.8 kgCO₂e/ft² |
| Electricity | 2,203,235 kWh |
| Natural gas | 160,561 therms |
| Gross floor area | 768,409 sq ft |
| Source record | california:4347181:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 57.0 kBtu/ft² | 1,352 tCO₂e | |
| 2023 | — | 53.3 kBtu/ft² | 1,194 tCO₂e | |
| 2022 | — | 52.2 kBtu/ft² | 1,162 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 3536 Butte Campus Drive, Oroville
- City
- California
- State
- California
- ZIP
- 95965
- Coordinates
- 39.64750, -121.64506
Within ~1 km
Nearby benchmarked buildings
No other benchmarked buildings within ~1 km.
See also: most efficient in California · biggest emitters
How does Butte-Glenn Ccd Main Campus compare with other college/university buildings in California?
The latest disclosures cover 497 college/university buildings in California, out of 40,029 buildings citywide. Its site EUI of 57.0 kBtu/ft² is about 28% below the average of 79.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.8 kgCO₂e/ft² is about 63% below the group average of 4.8 kgCO₂e/ft².
At 768,409 sq ft, it is about 35% above the average floor area of 569,516 sq ft for those buildings. It was built in 1974, 6 years later than the group's average year built (1969). Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².
How has Butte-Glenn Ccd Main Campus's energy performance changed over time?
BuildingCensus holds 3 California disclosures for Butte-Glenn Ccd Main Campus, covering report years 2022–2024. Site EUI moved from 52.2 kBtu/ft² (2022) to 57.0 kBtu/ft² (2024), an 9% increase. Reported emissions went from 1,162 tCO₂e to 1,352 tCO₂e over the same span (up 16%).
What does a site EUI of 57.0 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Butte-Glenn Ccd Main Campus's 57.0 kBtu/ft² across 768,409 sq ft works out to about 43.8 billion Btu (12,836 MWh-equivalent) in 2024. The disclosure also reports 2,203,235 kWh of electricity and 160,561 therms of natural gas for the year.
Which law requires Butte-Glenn Ccd Main Campus to report its energy use?
Butte-Glenn Ccd Main Campus reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:4347181:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More college/university buildings in California
- Citrus College· 767,230 sq ft · EUI 56.5 kBtu/ft²
- San Jose City College· 765,221 sq ft · EUI 48.3 kBtu/ft²
- Cal Maritime· 763,445 sq ft · EUI 55.3 kBtu/ft²
- Genentech Hall & Campus· 758,500 sq ft · EUI 177.5 kBtu/ft²
- Long Beach Community College Lac· 748,719 sq ft · EUI 161.9 kBtu/ft²
- Rio Hondo College· 746,495 sq ft · EUI 41.1 kBtu/ft²
- College/University buildings in California· 497 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Butte-Glenn Ccd Main Campus's energy grade?
Butte-Glenn Ccd Main Campus did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 57.0 kBtu/ft².
How much energy does Butte-Glenn Ccd Main Campus use?
Its 2024 site energy-use intensity was 57.0 kBtu/ft² across 768,409 sq ft, including 2,203,235 kWh of electricity and 160,561 therms of natural gas.
What are Butte-Glenn Ccd Main Campus's carbon emissions?
Butte-Glenn Ccd Main Campus reported 1,352 tCO₂e of greenhouse-gas emissions (1.8 kgCO₂e/ft²) for 2024.
Where is Butte-Glenn Ccd Main Campus?
Butte-Glenn Ccd Main Campus is at 3536 Butte Campus Drive, Oroville, in Oroville, California 95965. Its coordinates are 39.64750, -121.64506 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Butte-Glenn Ccd Main Campus and when was it built?
Butte-Glenn Ccd Main Campus has 768,409 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1974 as its year built. It is classed as college/university.
Is Butte-Glenn Ccd Main Campus covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Butte-Glenn Ccd Main Campus, Oroville, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/butte-glenn-ccd-main-campus-8bd016b9 (data as of July 9, 2026).