Ca1561 - Redlands Medical Offices
Medical Office in California, CA · 1301 California Street, Redlands · 92374
At a glance
Ca1561 - Redlands Medical Offices is a 120,835-square-foot medical office at 1301 California Street, Redlands in Redlands, California, built in 2008. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 73 out of 100 (grade B), a site energy-use intensity of 72.8 kBtu/ft² and 555 tCO₂e of greenhouse-gas emissions. That score is higher than 51% of the 546 scored medical office buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 73 (band B) |
| Site EUI | 72.8 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 555 tCO₂e |
| GHG intensity | 4.6 kgCO₂e/ft² |
| Electricity | 1,840,844 kWh |
| Natural gas | 26,073 therms |
| Gross floor area | 120,835 sq ft |
| Source record | california:2551339:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 73 | ±0 | 72.8 kBtu/ft² | 555 tCO₂e |
| 2023 | 73 | +1 | 71.1 kBtu/ft² | 560 tCO₂e |
| 2022 | 72 | -3 | 74.4 kBtu/ft² | 581 tCO₂e |
| 2021 | 75 | +19 | 68.6 kBtu/ft² | 493 tCO₂e |
| 2020 | 56 | +1 | 75.5 kBtu/ft² | 568 tCO₂e |
| 2018 | 55 | 72.3 kBtu/ft² | 574 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1301 California Street, Redlands
- City
- California
- State
- California
- ZIP
- 92374
- Coordinates
- 34.07157, -117.22765
Within ~1 km
Nearby benchmarked buildings
- Ashley Furniture Industries, Llcscore 93
Distribution Center · 1,013,331 sq ft
- Bci Redlands Dcscore 78
Distribution Center · 771,839 sq ft
- Redlands Business Centerscore 23
Distribution Center · 704,115 sq ft
Distribution Center · 616,542 sq ft
- 2255 W. Lugoniascore —
Distribution Center · 606,133 sq ft
Non-Refrigerated Warehouse · 601,952 sq ft
See also: most efficient in California · biggest emitters
How does Ca1561 - Redlands Medical Offices compare with other medical office buildings in California?
The latest disclosures cover 602 medical office buildings in California, out of 40,029 buildings citywide. Ca1561 - Redlands Medical Offices's ENERGY STAR score of 73 compares with an average of 63 across the 546 that report a score; it scores higher than 51% of them and lower than 49%. Its site EUI of 72.8 kBtu/ft² is about 23% below the average of 94.3 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 4.6 kgCO₂e/ft² is about 18% below the group average of 5.6 kgCO₂e/ft².
At 120,835 sq ft, it is about 20% above the average floor area of 100,847 sq ft for those buildings. It was built in 2008, 17 years later than the group's average year built (1991). Across all 24 jurisdictions BuildingCensus covers, the 1,266 medical office buildings average an ENERGY STAR score of 64 and a site EUI of 92.2 kBtu/ft².
How has Ca1561 - Redlands Medical Offices's energy performance changed over time?
BuildingCensus holds 6 California disclosures for Ca1561 - Redlands Medical Offices, covering report years 2018, 2020, 2021, 2022, 2023, 2024. Its ENERGY STAR score went from 55 in 2018 to 73 in 2024 (+18 points); its best year on file was 2021, at 75. Site EUI moved from 72.3 kBtu/ft² (2018) to 72.8 kBtu/ft² (2024), an 1% increase. Reported emissions went from 574 tCO₂e to 555 tCO₂e over the same span (down 3%).
What does an ENERGY STAR score of 73 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 73 means the building performs better than about 73% of its national peers. BuildingCensus bands the score into report-card grades; 73 falls in band B — above median (70–84). It sits 2 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Ca1561 - Redlands Medical Offices's 72.8 kBtu/ft² across 120,835 sq ft works out to about 8.8 billion Btu (2,578 MWh-equivalent) in 2024. The disclosure also reports 1,840,844 kWh of electricity and 26,073 therms of natural gas for the year.
Which law requires Ca1561 - Redlands Medical Offices to report its energy use?
Ca1561 - Redlands Medical Offices reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:2551339:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More medical office buildings in California
- St. Jude Medical Center - Medical Plaza Ii· 120,380 sq ft · score 100 (A)
- 275 Beck Ave· 120,180 sq ft · score 100 (A)
- Pamf - Sunnyvale Center - 301· 120,000 sq ft · score 19 (D)
- Santa Monica Medical Plaza· 119,917 sq ft · score 38 (D)
- 151204-Hta-Mission Mob Tower, Llc· 119,595 sq ft · score 85 (A)
- Corona Mob Campus· 118,797 sq ft · score 46 (D)
- Medical Office buildings in California· 602 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Ca1561 - Redlands Medical Offices's energy grade?
Ca1561 - Redlands Medical Offices scores 73 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Ca1561 - Redlands Medical Offices use?
Its 2024 site energy-use intensity was 72.8 kBtu/ft² across 120,835 sq ft, including 1,840,844 kWh of electricity and 26,073 therms of natural gas.
What are Ca1561 - Redlands Medical Offices's carbon emissions?
Ca1561 - Redlands Medical Offices reported 555 tCO₂e of greenhouse-gas emissions (4.6 kgCO₂e/ft²) for 2024.
Where is Ca1561 - Redlands Medical Offices?
Ca1561 - Redlands Medical Offices is at 1301 California Street, Redlands, in Redlands, California 92374. Its coordinates are 34.07157, -117.22765 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Ca1561 - Redlands Medical Offices and when was it built?
Ca1561 - Redlands Medical Offices has 120,835 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2008 as its year built. It is classed as medical office.
Is Ca1561 - Redlands Medical Offices covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Ca1561 - Redlands Medical Offices, Redlands, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/ca1561-redlands-medical-offices-45d800d7 (data as of July 9, 2026).