Campus Center At Mccarthy 115
Office in California, CA · 115 North Mccarthy Blvd, Milpitas · 95035
At a glance
Campus Center At Mccarthy 115 is a 117,832-square-foot office building at 115 North Mccarthy Blvd, Milpitas in Milpitas, California, built in 2000. In its 2018 California benchmarking disclosure it reported a site energy-use intensity of 26.2 kBtu/ft² and 194 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2018
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 26.2 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 194 tCO₂e |
| GHG intensity | 1.6 kgCO₂e/ft² |
| Electricity | 510,700 kWh |
| Natural gas | 13,462 therms |
| Gross floor area | 117,832 sq ft |
| Source record | california:1497208:2018 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 115 North Mccarthy Blvd, Milpitas
- City
- California
- State
- California
- ZIP
- 95035
- Coordinates
- 37.42942, -121.92452
Within ~1 km
Nearby benchmarked buildings
- Bridge Point Silicon Valleyscore —
Distribution Center · 388,240 sq ft
- 135 - Bldg. 2score 95
Office · 176,876 sq ft
- 155 - Bldg. 3score —
Office · 176,875 sq ft
Office · 176,874 sq ft
Office · 176,874 sq ft
- Campus 237 Owner Llcscore —
Office · 176,748 sq ft
See also: most efficient in California · biggest emitters
How does Campus Center At Mccarthy 115 compare with other office buildings in California?
The latest disclosures cover 6,214 office buildings in California, out of 40,029 buildings citywide. Its site EUI of 26.2 kBtu/ft² is about half of the average of 56.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.6 kgCO₂e/ft² is about half of the group average of 3.6 kgCO₂e/ft².
At 117,832 sq ft, it is about 22% below the average floor area of 151,937 sq ft for those buildings. It was built in 2000, 15 years later than the group's average year built (1985). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².
What does a site EUI of 26.2 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Campus Center At Mccarthy 115's 26.2 kBtu/ft² across 117,832 sq ft works out to about 3.1 billion Btu (905 MWh-equivalent) in 2018. The disclosure also reports 510,700 kWh of electricity and 13,462 therms of natural gas for the year.
Which law requires Campus Center At Mccarthy 115 to report its energy use?
Campus Center At Mccarthy 115 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2018 disclosure (source record california:1497208:2018). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More office buildings in California
- Ted Williams· 117,805 sq ft · score 87 (A)
- Los Angeles Community College District Office· 117,798 sq ft · score 62 (C)
- 3721 Valley Centre - Kcdm· 117,777 sq ft · score 72 (B)
- 087 Office Of Emergency Services Building (Rancho· 117,704 sq ft · EUI 152.2 kBtu/ft²
- 250 Montgomery St. San Francisco Ca· 117,568 sq ft · score 79 (B)
- Ca9921 - Green Street/Ids· 117,538 sq ft · score 65 (C)
- Office buildings in California· 6,214 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Campus Center At Mccarthy 115's energy grade?
Campus Center At Mccarthy 115 did not report an ENERGY STAR score in its 2018 disclosure, but its site energy-use intensity was 26.2 kBtu/ft².
How much energy does Campus Center At Mccarthy 115 use?
Its 2018 site energy-use intensity was 26.2 kBtu/ft² across 117,832 sq ft, including 510,700 kWh of electricity and 13,462 therms of natural gas.
What are Campus Center At Mccarthy 115's carbon emissions?
Campus Center At Mccarthy 115 reported 194 tCO₂e of greenhouse-gas emissions (1.6 kgCO₂e/ft²) for 2018.
Where is Campus Center At Mccarthy 115?
Campus Center At Mccarthy 115 is at 115 North Mccarthy Blvd, Milpitas, in Milpitas, California 95035. Its coordinates are 37.42942, -121.92452 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Campus Center At Mccarthy 115 and when was it built?
Campus Center At Mccarthy 115 has 117,832 sq ft of gross floor area, as reported in its 2018 disclosure. The disclosure lists 2000 as its year built. It is classed as office.
Is Campus Center At Mccarthy 115 covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2018 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Campus Center At Mccarthy 115, Milpitas, California — 2018 benchmarking disclosure”, https://buildingcensus.com/buildings/california/campus-center-at-mccarthy-115-284b9f3d (data as of July 9, 2026).