City Yard
Non-Refrigerated Warehouse in California, CA · 15670 Perris Blvd, Moreno Valley · 92551
At a glance
City Yard is a 57,878-square-foot non-refrigerated warehouse at 15670 Perris Blvd, Moreno Valley in Moreno Valley, California, built in 1964. In its 2022 California benchmarking disclosure it reported an ENERGY STAR score of 72 out of 100 (grade B), a site energy-use intensity of 13.7 kBtu/ft² and 56 tCO₂e of greenhouse-gas emissions. That score is higher than 41% of the 2,227 scored non-refrigerated warehouse buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2022
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 72 (band B) |
| Site EUI | 13.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 56 tCO₂e |
| GHG intensity | 1.0 kgCO₂e/ft² |
| Electricity | 239,709 kWh |
| Gross floor area | 57,878 sq ft |
| Source record | california:2607395:2022 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 15670 Perris Blvd, Moreno Valley
- City
- California
- State
- California
- ZIP
- 92551
- Coordinates
- 33.89269, -117.22522
Within ~1 km
Nearby benchmarked buildings
- Oakwoodscore 98
Multifamily Housing · 253,156 sq ft
- 1087 - Moreno Valley Iiscore 17
Retail Store · 102,513 sq ft
See also: most efficient in California · biggest emitters
How does City Yard compare with other non-refrigerated warehouse buildings in California?
The latest disclosures cover 2,867 non-refrigerated warehouse buildings in California, out of 40,029 buildings citywide. City Yard's ENERGY STAR score of 72 compares with an average of 68 across the 2,227 that report a score; it scores higher than 41% of them and lower than 58%. Its site EUI of 13.7 kBtu/ft² is about 37% below the average of 21.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.0 kgCO₂e/ft² is about 29% below the group average of 1.4 kgCO₂e/ft².
At 57,878 sq ft, it is about 67% below the average floor area of 173,929 sq ft for those buildings. It was built in 1964, 24 years earlier than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 4,723 non-refrigerated warehouse buildings average an ENERGY STAR score of 66 and a site EUI of 26.0 kBtu/ft².
What does an ENERGY STAR score of 72 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 72 means the building performs better than about 72% of its national peers. BuildingCensus bands the score into report-card grades; 72 falls in band B — above median (70–84). It sits 3 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. City Yard's 13.7 kBtu/ft² across 57,878 sq ft works out to about 0.8 billion Btu (232 MWh-equivalent) in 2022. The disclosure also reports 239,709 kWh of electricity for the year.
Which law requires City Yard to report its energy use?
City Yard reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:2607395:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More non-refrigerated warehouse buildings in California
- Los Alamitos Apg - Bldg N· 57,863 sq ft · score 62 (C)
- Orsklb - 5951 Skylab Road· 57,800 sq ft
- Lax00211 - North Oc Ind Ctr. 4· 57,705 sq ft · score 96 (A)
- 4308 W. Shaw Ave. (Kirk Daoudian)· 57,694 sq ft · score 13 (D)
- 2307 East 49Th Street· 57,651 sq ft · score 1 (D)
- Kb Westchester Building, Llc (320C) 2307 E 49· 57,651 sq ft
- Non-Refrigerated Warehouse buildings in California· 2,867 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is City Yard's energy grade?
City Yard scores 72 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2022 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does City Yard use?
Its 2022 site energy-use intensity was 13.7 kBtu/ft² across 57,878 sq ft, including 239,709 kWh of electricity.
What are City Yard's carbon emissions?
City Yard reported 56 tCO₂e of greenhouse-gas emissions (1.0 kgCO₂e/ft²) for 2022.
Where is City Yard?
City Yard is at 15670 Perris Blvd, Moreno Valley, in Moreno Valley, California 92551. Its coordinates are 33.89269, -117.22522 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is City Yard and when was it built?
City Yard has 57,878 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 1964 as its year built. It is classed as non-refrigerated warehouse.
Is City Yard covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “City Yard, Moreno Valley, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/city-yard-45e36498 (data as of July 9, 2026).