BuildingCensus
–

Cortec Precision Sheetmetal

Manufacturing/Industrial Plant in California, CA · 2231 Will Wool Drive, San Jose · 95112

At a glance

Cortec Precision Sheetmetal is a 77,288-square-foot manufacturing/industrial plant at 2231 Will Wool Drive, San Jose in San Jose, California, built in 1996. In its 2023 California benchmarking disclosure it reported a site energy-use intensity of 38.9 kBtu/ft² and 213 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2023
Site EUI
38.9
kBtu/ft²
GHG emissions
213
tCO₂e
GHG intensity
2.8
kgCO₂e/ft²
Floor area
77,288
sq ft
Year built
1996
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI38.9 kBtu/ft²
Source EUI—
GHG emissions213 tCO₂e
GHG intensity2.8 kgCO₂e/ft²
Electricity873,184 kWh
Natural gas298 therms
Gross floor area77,288 sq ft
Source recordcalifornia:6810567:2023

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
2231 Will Wool Drive, San Jose
State
California
ZIP
95112
Coordinates
37.31198, -121.84897

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Cortec Precision Sheetmetal compare with other manufacturing/industrial plant buildings in California?

The latest disclosures cover 982 manufacturing/industrial plant buildings in California, out of 40,029 buildings citywide. Its site EUI of 38.9 kBtu/ft² is about 70% below the average of 127.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 2.8 kgCO₂e/ft² is about 62% below the group average of 7.4 kgCO₂e/ft².

At 77,288 sq ft, it is about 43% below the average floor area of 135,409 sq ft for those buildings. It was built in 1996, 14 years later than the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².

What does a site EUI of 38.9 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Cortec Precision Sheetmetal's 38.9 kBtu/ft² across 77,288 sq ft works out to about 3 billion Btu (881 MWh-equivalent) in 2023. The disclosure also reports 873,184 kWh of electricity and 298 therms of natural gas for the year.

Which law requires Cortec Precision Sheetmetal to report its energy use?

Cortec Precision Sheetmetal reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record california:6810567:2023). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More manufacturing/industrial plant buildings in California

Frequently asked questions

What is Cortec Precision Sheetmetal's energy grade?

Cortec Precision Sheetmetal did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 38.9 kBtu/ft².

How much energy does Cortec Precision Sheetmetal use?

Its 2023 site energy-use intensity was 38.9 kBtu/ft² across 77,288 sq ft, including 873,184 kWh of electricity and 298 therms of natural gas.

What are Cortec Precision Sheetmetal's carbon emissions?

Cortec Precision Sheetmetal reported 213 tCO₂e of greenhouse-gas emissions (2.8 kgCO₂e/ft²) for 2023.

Where is Cortec Precision Sheetmetal?

Cortec Precision Sheetmetal is at 2231 Will Wool Drive, San Jose, in San Jose, California 95112. Its coordinates are 37.31198, -121.84897 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Cortec Precision Sheetmetal and when was it built?

Cortec Precision Sheetmetal has 77,288 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1996 as its year built. It is classed as manufacturing/industrial plant.

Is Cortec Precision Sheetmetal covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2023 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Cortec Precision Sheetmetal, San Jose, California — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/california/cortec-precision-sheetmetal-10e0514f (data as of July 9, 2026).