Fedex Processing Center
Distribution Center in California, CA · 1875 Marin Street, San Francisco · 94124
At a glance
Fedex Processing Center is a 108,481-square-foot distribution center at 1875 Marin Street, San Francisco in San Francisco, California, built in 2003. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 85 out of 100 (grade A), a site energy-use intensity of 18.7 kBtu/ft² and 131 tCO₂e of greenhouse-gas emissions. That score is higher than 57% of the 2,485 scored distribution center buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 85 (band A) |
| Site EUI | 18.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 131 tCO₂e |
| GHG intensity | 1.2 kgCO₂e/ft² |
| Electricity | 482,650 kWh |
| Natural gas | 4,050 therms |
| Gross floor area | 108,481 sq ft |
| Source record | california:3979764:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 85 | 18.7 kBtu/ft² | 131 tCO₂e | |
| 2023 | — | — | 133 tCO₂e | |
| 2022 | 84 | ±0 | 19.7 kBtu/ft² | 140 tCO₂e |
| 2021 | 84 | +2 | 18.6 kBtu/ft² | 121 tCO₂e |
| 2020 | 82 | -1 | 18.9 kBtu/ft² | 134 tCO₂e |
| 2019 | 83 | +1 | 18.4 kBtu/ft² | 138 tCO₂e |
| 2018 | 82 | 17.6 kBtu/ft² | 136 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1875 Marin Street, San Francisco
- City
- California
- State
- California
- ZIP
- 94124
- Coordinates
- 37.74773, -122.39452
Within ~1 km
Nearby benchmarked buildings
Wastewater Treatment Plant · 524,593 sq ft
- San Francisco Gateway (Sfg)score —
Distribution Center · 448,000 sq ft
Non-Refrigerated Warehouse · 304,267 sq ft
- 180 Napoleon Stscore —
Commercial · 304,267 sq ft
- La Salle Industrial Parkscore —
Commercial · 224,000 sq ft
- Sba01203 - San Francisco Ip 2score 36
Distribution Center · 224,000 sq ft
See also: most efficient in California · biggest emitters
How does Fedex Processing Center compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Fedex Processing Center's ENERGY STAR score of 85 compares with an average of 67 across the 2,485 that report a score; it scores higher than 57% of them and lower than 41%. Its site EUI of 18.7 kBtu/ft² is roughly in line with the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.2 kgCO₂e/ft² is roughly in line with the group average of 1.3 kgCO₂e/ft².
At 108,481 sq ft, it is about half of the average floor area of 238,298 sq ft for those buildings. It was built in 2003, 9 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
How has Fedex Processing Center's energy performance changed over time?
BuildingCensus holds 7 California disclosures for Fedex Processing Center, covering report years 2018–2024. Its ENERGY STAR score went from 82 in 2018 to 85 in 2024 (+3 points). Site EUI moved from 17.6 kBtu/ft² (2018) to 18.7 kBtu/ft² (2024), an 6% increase. Reported emissions went from 136 tCO₂e to 131 tCO₂e over the same span (down 4%).
What does an ENERGY STAR score of 85 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 85 means the building performs better than about 85% of its national peers. BuildingCensus bands the score into report-card grades; 85 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Fedex Processing Center's 18.7 kBtu/ft² across 108,481 sq ft works out to about 2 billion Btu (595 MWh-equivalent) in 2024. The disclosure also reports 482,650 kWh of electricity and 4,050 therms of natural gas for the year.
Which law requires Fedex Processing Center to report its energy use?
Fedex Processing Center reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:3979764:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- Lpf - Lpfl0607 - 600 East Live Oak, Irwindale, California· 108,450 sq ft · score 37 (D)
- 128, 22707 S. Wilmington Ave., Carson· 108,400 sq ft · score 100 (A)
- Dominguez #6· 108,387 sq ft · score 85 (A)
- Bedrosians· 108,362 sq ft · score 96 (A)
- Granite Francisco· 108,336 sq ft · score 100 (A)
- Rancho Bernardo-11045 Tech. Pl· 108,319 sq ft · score 34 (D)
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Fedex Processing Center's energy grade?
Fedex Processing Center scores 85 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Fedex Processing Center use?
Its 2024 site energy-use intensity was 18.7 kBtu/ft² across 108,481 sq ft, including 482,650 kWh of electricity and 4,050 therms of natural gas.
What are Fedex Processing Center's carbon emissions?
Fedex Processing Center reported 131 tCO₂e of greenhouse-gas emissions (1.2 kgCO₂e/ft²) for 2024.
Where is Fedex Processing Center?
Fedex Processing Center is at 1875 Marin Street, San Francisco, in San Francisco, California 94124. Its coordinates are 37.74773, -122.39452 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Fedex Processing Center and when was it built?
Fedex Processing Center has 108,481 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2003 as its year built. It is classed as distribution center.
Is Fedex Processing Center covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Fedex Processing Center, San Francisco, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/fedex-processing-center-fc66c48e (data as of July 9, 2026).