Fresno Yosemite International Airport
Transportation Terminal/Station in California, CA · 5175 East Clinton Way, Fresno · 93727
At a glance
Fresno Yosemite International Airport is a 164,367-square-foot transportation terminal/station at 5175 East Clinton Way, Fresno in Fresno, California, built in 1942. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 181.8 kBtu/ft² and 1,942 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 181.8 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 1,942 tCO₂e |
| GHG intensity | 11.8 kgCO₂e/ft² |
| Electricity | 7,470,376 kWh |
| Natural gas | 47,108 therms |
| Gross floor area | 164,367 sq ft |
| Source record | california:7542762:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 181.8 kBtu/ft² | 1,942 tCO₂e | |
| 2023 | — | 209.3 kBtu/ft² | 2,304 tCO₂e | |
| 2022 | — | 227.2 kBtu/ft² | 2,430 tCO₂e | |
| 2021 | — | 221.0 kBtu/ft² | 2,080 tCO₂e | |
| 2020 | — | 179.2 kBtu/ft² | 1,811 tCO₂e | |
| 2019 | — | 186.0 kBtu/ft² | 1,869 tCO₂e | |
| 2018 | — | 194.9 kBtu/ft² | 2,012 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 5175 East Clinton Way, Fresno
- City
- California
- State
- California
- ZIP
- 93727
- Coordinates
- 36.77001, -119.71989
Within ~1 km
Nearby benchmarked buildings
Manufacturing/Industrial Plant · 120,210 sq ft
- 1550 N Peach Llcscore 86
Distribution Center · 115,620 sq ft
Hotel · 103,511 sq ft
- Hampton Inn Fresno Airportscore 90
Hotel · 59,073 sq ft
- 1535 North Peach Avescore 75
Hotel · 54,936 sq ft
- 1551 N Peach Avescore 55
Hotel · 53,574 sq ft
See also: most efficient in California · biggest emitters
How does Fresno Yosemite International Airport compare with other transportation terminal/station buildings in California?
The latest disclosures cover 42 transportation terminal/station buildings in California, out of 40,029 buildings citywide. Its site EUI of 181.8 kBtu/ft² is about twice the average of 89.6 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 11.8 kgCO₂e/ft² is about 123% above the group average of 5.3 kgCO₂e/ft².
At 164,367 sq ft, it is about half of the average floor area of 346,524 sq ft for those buildings. It was built in 1942, 33 years earlier than the group's average year built (1975). Across all 24 jurisdictions BuildingCensus covers, the 103 transportation terminal/station buildings average an ENERGY STAR score of 4 and a site EUI of 105.1 kBtu/ft².
How has Fresno Yosemite International Airport's energy performance changed over time?
BuildingCensus holds 7 California disclosures for Fresno Yosemite International Airport, covering report years 2018–2024. Site EUI moved from 194.9 kBtu/ft² (2018) to 181.8 kBtu/ft² (2024), a 7% decrease. Reported emissions went from 2,012 tCO₂e to 1,942 tCO₂e over the same span (down 3%).
What does a site EUI of 181.8 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Fresno Yosemite International Airport's 181.8 kBtu/ft² across 164,367 sq ft works out to about 29.9 billion Btu (8,758 MWh-equivalent) in 2024. The disclosure also reports 7,470,376 kWh of electricity and 47,108 therms of natural gas for the year.
Which law requires Fresno Yosemite International Airport to report its energy use?
Fresno Yosemite International Airport reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:7542762:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More transportation terminal/station buildings in California
- Terminal 8· 150,581 sq ft · EUI 106.8 kBtu/ft²
- 4501 E Washington Blvd, Commerce, Ca 90040· 150,480 sq ft · EUI 9.6 kBtu/ft²
- B. St. Cruise Ship Terminal· 147,171 sq ft · EUI 9.9 kBtu/ft²
- Los Angeles Fga/Ghl Maintenance (892001)· 130,038 sq ft · EUI 44.6 kBtu/ft²
- La Metro - Mrl - Universal City Station· 120,000 sq ft
- Mather Aviation - Hangar· 116,800 sq ft · EUI 12.2 kBtu/ft²
- Transportation Terminal/Station buildings in California· 42 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Fresno Yosemite International Airport's energy grade?
Fresno Yosemite International Airport did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 181.8 kBtu/ft².
How much energy does Fresno Yosemite International Airport use?
Its 2024 site energy-use intensity was 181.8 kBtu/ft² across 164,367 sq ft, including 7,470,376 kWh of electricity and 47,108 therms of natural gas.
What are Fresno Yosemite International Airport's carbon emissions?
Fresno Yosemite International Airport reported 1,942 tCO₂e of greenhouse-gas emissions (11.8 kgCO₂e/ft²) for 2024.
Where is Fresno Yosemite International Airport?
Fresno Yosemite International Airport is at 5175 East Clinton Way, Fresno, in Fresno, California 93727. Its coordinates are 36.77001, -119.71989 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Fresno Yosemite International Airport and when was it built?
Fresno Yosemite International Airport has 164,367 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1942 as its year built. It is classed as transportation terminal/station.
Is Fresno Yosemite International Airport covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Fresno Yosemite International Airport, Fresno, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/fresno-yosemite-international-airport-0f70cfe1 (data as of July 9, 2026).