Galt Campus Building 3
Distribution Center in California, CA · 104 Industrial Court, Galt · 95632
At a glance
Galt Campus Building 3 is a 71,594-square-foot distribution center at 104 Industrial Court, Galt in Galt, California, built in 1990. In its 2023 California benchmarking disclosure it reported a site energy-use intensity of 10.4 kBtu/ft² and 49 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2023
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 10.4 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 49 tCO₂e |
| GHG intensity | 0.7 kgCO₂e/ft² |
| Electricity | 215,491 kWh |
| Gross floor area | 71,594 sq ft |
| Source record | california:34611143:2023 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 104 Industrial Court, Galt
- City
- California
- State
- California
- ZIP
- 95632
- Coordinates
- 38.26581, -121.30725
Within ~1 km
Nearby benchmarked buildings
- Cal-Waste Galtscore —
Other · 96,700 sq ft
- City Of Galtscore 83
Non-Refrigerated Warehouse · 50,400 sq ft
See also: most efficient in California · biggest emitters
How does Galt Campus Building 3 compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Its site EUI of 10.4 kBtu/ft² is about half of the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.7 kgCO₂e/ft² is about half of the group average of 1.3 kgCO₂e/ft².
At 71,594 sq ft, it is about 70% below the average floor area of 238,298 sq ft for those buildings. It was built in 1990, 4 years earlier than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
What does a site EUI of 10.4 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Galt Campus Building 3's 10.4 kBtu/ft² across 71,594 sq ft works out to about 0.7 billion Btu (218 MWh-equivalent) in 2023. The disclosure also reports 215,491 kWh of electricity for the year.
Which law requires Galt Campus Building 3 to report its energy use?
Galt Campus Building 3 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record california:34611143:2023). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- Building 727, 18780 South Central Ave, Carson· 71,542 sq ft
- 8585 White Oak Ave· 71,525 sq ft · score 66 (C)
- Rrw· 71,486 sq ft · score 86 (A)
- 14352 Franklin Avenue - Ab802· 71,483 sq ft · score 56 (C)
- Paxton Bradley Industrial Park· 71,424 sq ft · score 100 (A)
- Pico Building #2· 71,396 sq ft · score 93 (A)
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Galt Campus Building 3's energy grade?
Galt Campus Building 3 did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 10.4 kBtu/ft².
How much energy does Galt Campus Building 3 use?
Its 2023 site energy-use intensity was 10.4 kBtu/ft² across 71,594 sq ft, including 215,491 kWh of electricity.
What are Galt Campus Building 3's carbon emissions?
Galt Campus Building 3 reported 49 tCO₂e of greenhouse-gas emissions (0.7 kgCO₂e/ft²) for 2023.
Where is Galt Campus Building 3?
Galt Campus Building 3 is at 104 Industrial Court, Galt, in Galt, California 95632. Its coordinates are 38.26581, -121.30725 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Galt Campus Building 3 and when was it built?
Galt Campus Building 3 has 71,594 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1990 as its year built. It is classed as distribution center.
Is Galt Campus Building 3 covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2023 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Galt Campus Building 3, Galt, California — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/california/galt-campus-building-3-96422045 (data as of July 9, 2026).