Gateway Towne Center Phase Ii
Strip Mall in California, CA · 1771 South Alameda Street East, Compton · 90221
At a glance
Gateway Towne Center Phase Ii is a 85,306-square-foot strip mall building at 1771 South Alameda Street East, Compton in Compton, California, built in 2013. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 79.5 kBtu/ft² and 427 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 79.5 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 427 tCO₂e |
| GHG intensity | 5.0 kgCO₂e/ft² |
| Electricity | 1,742,769 kWh |
| Natural gas | 6,162 therms |
| Gross floor area | 85,306 sq ft |
| Source record | california:4128612:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 79.5 kBtu/ft² | 427 tCO₂e | |
| 2023 | — | 76.6 kBtu/ft² | 462 tCO₂e | |
| 2022 | — | 3.1 kBtu/ft² | 18 tCO₂e | |
| 2021 | — | 3.1 kBtu/ft² | 19 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1771 South Alameda Street East, Compton
- City
- California
- State
- California
- ZIP
- 90221
- Coordinates
- 33.87653, -118.21793
Within ~1 km
Nearby benchmarked buildings
Lifestyle Center · 278,771 sq ft
- Lax01005 - South Bay Ind Ctr 34score 90
Distribution Center · 206,483 sq ft
Non-Refrigerated Warehouse · 176,656 sq ft
Non-Refrigerated Warehouse · 150,055 sq ft
- 123 E Artesia Blvdscore 94
Hotel · 142,080 sq ft
Distribution Center · 138,649 sq ft
See also: most efficient in California · biggest emitters
How does Gateway Towne Center Phase Ii compare with other strip mall buildings in California?
The latest disclosures cover 937 strip mall buildings in California, out of 40,029 buildings citywide. Its site EUI of 79.5 kBtu/ft² is roughly in line with the average of 75.2 kBtu/ft². Its emissions intensity of 5.0 kgCO₂e/ft² is roughly in line with the group average of 4.7 kgCO₂e/ft².
At 85,306 sq ft, it is about 32% below the average floor area of 125,816 sq ft for those buildings. It was built in 2013, 28 years later than the group's average year built (1985). Across all 24 jurisdictions BuildingCensus covers, the 1,607 strip mall buildings average an ENERGY STAR score of 68 and a site EUI of 83.1 kBtu/ft².
How has Gateway Towne Center Phase Ii's energy performance changed over time?
BuildingCensus holds 4 California disclosures for Gateway Towne Center Phase Ii, covering report years 2021–2024. Site EUI moved from 3.1 kBtu/ft² (2021) to 79.5 kBtu/ft² (2024), an 2465% increase. Reported emissions went from 19 tCO₂e to 427 tCO₂e over the same span (up 2185%).
What does a site EUI of 79.5 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Gateway Towne Center Phase Ii's 79.5 kBtu/ft² across 85,306 sq ft works out to about 6.8 billion Btu (1,988 MWh-equivalent) in 2024. The disclosure also reports 1,742,769 kWh of electricity and 6,162 therms of natural gas for the year.
Which law requires Gateway Towne Center Phase Ii to report its energy use?
Gateway Towne Center Phase Ii reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:4128612:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More strip mall buildings in California
- Lone Tree Plaza (5421 - 5461)· 85,289 sq ft · EUI 79.0 kBtu/ft²
- 1535 Landess Avenue· 85,277 sq ft · EUI 94.8 kBtu/ft²
- 6701-6799 Carnelian St· 85,235 sq ft · EUI 36.3 kBtu/ft²
- 6411-6543 E Spring St· 85,053 sq ft · EUI 78.2 kBtu/ft²
- Silverado Plaza/ 90015· 84,916 sq ft · EUI 86.6 kBtu/ft²
- 1090 3Rd Ave· 84,856 sq ft · EUI 184.5 kBtu/ft²
- Strip Mall buildings in California· 937 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Gateway Towne Center Phase Ii's energy grade?
Gateway Towne Center Phase Ii did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 79.5 kBtu/ft².
How much energy does Gateway Towne Center Phase Ii use?
Its 2024 site energy-use intensity was 79.5 kBtu/ft² across 85,306 sq ft, including 1,742,769 kWh of electricity and 6,162 therms of natural gas.
What are Gateway Towne Center Phase Ii's carbon emissions?
Gateway Towne Center Phase Ii reported 427 tCO₂e of greenhouse-gas emissions (5.0 kgCO₂e/ft²) for 2024.
Where is Gateway Towne Center Phase Ii?
Gateway Towne Center Phase Ii is at 1771 South Alameda Street East, Compton, in Compton, California 90221. Its coordinates are 33.87653, -118.21793 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Gateway Towne Center Phase Ii and when was it built?
Gateway Towne Center Phase Ii has 85,306 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2013 as its year built. It is classed as strip mall.
Is Gateway Towne Center Phase Ii covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Gateway Towne Center Phase Ii, Compton, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/gateway-towne-center-phase-ii-1d860eef (data as of July 9, 2026).