BuildingCensus
–

Harris And Morlan Consolidated Meter

College/University in California, CA · 595 N Center St, Orange · 92867

At a glance

Harris And Morlan Consolidated Meter is a 69,724-square-foot college/university building at 595 N Center St, Orange in Orange, California, built in 1963. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 25.3 kBtu/ft² and 111 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
25.3
kBtu/ft²
GHG emissions
111
tCO₂e
GHG intensity
1.6
kgCO₂e/ft²
Floor area
69,724
sq ft
Year built
1963
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI25.3 kBtu/ft²
Source EUI—
GHG emissions111 tCO₂e
GHG intensity1.6 kgCO₂e/ft²
Electricity489,423 kWh
Gross floor area69,724 sq ft
Source recordcalifornia:58027392:2024

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
595 N Center St, Orange
State
California
ZIP
92867
Coordinates
33.79774, -117.84970

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Harris And Morlan Consolidated Meter compare with other college/university buildings in California?

The latest disclosures cover 497 college/university buildings in California, out of 40,029 buildings citywide. Its site EUI of 25.3 kBtu/ft² is about 68% below the average of 79.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.6 kgCO₂e/ft² is about 67% below the group average of 4.8 kgCO₂e/ft².

At 69,724 sq ft, it is about 88% below the average floor area of 569,516 sq ft for those buildings. It was built in 1963, 5 years earlier than the group's average year built (1969). Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².

What does a site EUI of 25.3 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Harris And Morlan Consolidated Meter's 25.3 kBtu/ft² across 69,724 sq ft works out to about 1.8 billion Btu (517 MWh-equivalent) in 2024. The disclosure also reports 489,423 kWh of electricity for the year.

Which law requires Harris And Morlan Consolidated Meter to report its energy use?

Harris And Morlan Consolidated Meter reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:58027392:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More college/university buildings in California

Frequently asked questions

What is Harris And Morlan Consolidated Meter's energy grade?

Harris And Morlan Consolidated Meter did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 25.3 kBtu/ft².

How much energy does Harris And Morlan Consolidated Meter use?

Its 2024 site energy-use intensity was 25.3 kBtu/ft² across 69,724 sq ft, including 489,423 kWh of electricity.

What are Harris And Morlan Consolidated Meter's carbon emissions?

Harris And Morlan Consolidated Meter reported 111 tCO₂e of greenhouse-gas emissions (1.6 kgCO₂e/ft²) for 2024.

Where is Harris And Morlan Consolidated Meter?

Harris And Morlan Consolidated Meter is at 595 N Center St, Orange, in Orange, California 92867. Its coordinates are 33.79774, -117.84970 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Harris And Morlan Consolidated Meter and when was it built?

Harris And Morlan Consolidated Meter has 69,724 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1963 as its year built. It is classed as college/university.

Is Harris And Morlan Consolidated Meter covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Harris And Morlan Consolidated Meter, Orange, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/harris-and-morlan-consolidated-meter-8842f60c (data as of July 9, 2026).