BuildingCensus
A

Harvest Park

Multifamily Housing in California, CA · 75 Harvest Park Court, Chico · 95926

At a glance

Harvest Park is a 93,794-square-foot multifamily housing building at 75 Harvest Park Court, Chico in Chico, California, built in 2014. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 100 out of 100 (grade A), a site energy-use intensity of 25.7 kBtu/ft² and 134 tCO₂e of greenhouse-gas emissions. That score is higher than 76% of the 9,612 scored multifamily housing buildings in California.

ENERGY STAR score
100
band A · 2024
Site EUI
25.7
kBtu/ft²
GHG emissions
134
tCO₂e
GHG intensity
1.4
kgCO₂e/ft²
Floor area
93,794
sq ft
Year built
2014
vintage
◆ Loading map…
85–10070–8455–691–54
Location

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score100 (band A)
Site EUI25.7 kBtu/ft²
Source EUI—
GHG emissions134 tCO₂e
GHG intensity1.4 kgCO₂e/ft²
Electricity167,540 kWh
Natural gas18,134 therms
Gross floor area93,794 sq ft
Source recordcalifornia:12421441:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest100+3425.7 kBtu/ft²134 tCO₂e
202366-637.5 kBtu/ft²254 tCO₂e
202272-535.5 kBtu/ft²238 tCO₂e
202177-333.7 kBtu/ft²201 tCO₂e
202080-932.6 kBtu/ft²217 tCO₂e
20198940.8 kBtu/ft²228 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
75 Harvest Park Court, Chico
State
California
ZIP
95926
Coordinates
39.75301, -121.86703

Within ~1 km

Nearby benchmarked buildings

No other benchmarked buildings within ~1 km.

See also: most efficient in California · biggest emitters

How does Harvest Park compare with other multifamily housing buildings in California?

The latest disclosures cover 10,630 multifamily housing buildings in California, out of 40,029 buildings citywide. Harvest Park's ENERGY STAR score of 100 compares with an average of 82 across the 9,612 that report a score; it scores higher than 76% of them. Its site EUI of 25.7 kBtu/ft² is about 25% below the average of 34.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.4 kgCO₂e/ft² is about 32% below the group average of 2.1 kgCO₂e/ft².

At 93,794 sq ft, it is about 38% below the average floor area of 150,919 sq ft for those buildings. It was built in 2014, 26 years later than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².

How has Harvest Park's energy performance changed over time?

BuildingCensus holds 6 California disclosures for Harvest Park, covering report years 2019–2024. Its ENERGY STAR score went from 89 in 2019 to 100 in 2024 (+11 points). Site EUI moved from 40.8 kBtu/ft² (2019) to 25.7 kBtu/ft² (2024), a 37% decrease. Reported emissions went from 228 tCO₂e to 134 tCO₂e over the same span (down 41%).

What does an ENERGY STAR score of 100 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: 100 is the top of the scale. BuildingCensus bands the score into report-card grades; 100 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Harvest Park's 25.7 kBtu/ft² across 93,794 sq ft works out to about 2.4 billion Btu (706 MWh-equivalent) in 2024. The disclosure also reports 167,540 kWh of electricity and 18,134 therms of natural gas for the year.

Which law requires Harvest Park to report its energy use?

Harvest Park reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:12421441:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More multifamily housing buildings in California

Frequently asked questions

What is Harvest Park's energy grade?

Harvest Park scores 100 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Harvest Park use?

Its 2024 site energy-use intensity was 25.7 kBtu/ft² across 93,794 sq ft, including 167,540 kWh of electricity and 18,134 therms of natural gas.

What are Harvest Park's carbon emissions?

Harvest Park reported 134 tCO₂e of greenhouse-gas emissions (1.4 kgCO₂e/ft²) for 2024.

Where is Harvest Park?

Harvest Park is at 75 Harvest Park Court, Chico, in Chico, California 95926. Its coordinates are 39.75301, -121.86703 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Harvest Park and when was it built?

Harvest Park has 93,794 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2014 as its year built. It is classed as multifamily housing.

Is Harvest Park covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Harvest Park, Chico, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/harvest-park-c875886d (data as of July 9, 2026).