Hebrew Union College
College/University in California, CA · 3077 University Ave, Los Angeles · 90007
At a glance
Hebrew Union College is a 57,000-square-foot college/university building at 3077 University Ave, Los Angeles in Los Angeles, California, built in 1971. In its 2021 California benchmarking disclosure it reported a site energy-use intensity of 20.3 kBtu/ft² and 79 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2021
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 20.3 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 79 tCO₂e |
| GHG intensity | 1.4 kgCO₂e/ft² |
| Electricity | 338,976 kWh |
| Gross floor area | 57,000 sq ft |
| Source record | california:6673765:2021 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2021latest | — | 20.3 kBtu/ft² | 79 tCO₂e | |
| 2020 | — | 15.8 kBtu/ft² | 55 tCO₂e | |
| 2019 | — | 31.1 kBtu/ft² | 107 tCO₂e | |
| 2018 | — | 42.7 kBtu/ft² | 149 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 3077 University Ave, Los Angeles
- City
- California
- State
- California
- ZIP
- 90007
- Coordinates
- 34.02609, -118.28214
Within ~1 km
Nearby benchmarked buildings
- University Park Campus (Upc)score —
College/University · 8,763,109 sq ft
- University Village (Uvi)score —
Residence Hall/Dormitory · 1,207,266 sq ft
Parking · 1,073,224 sq ft
- University Gatewayscore 89
Multifamily Housing · 820,242 sq ft
Residence Hall/Dormitory · 492,541 sq ft
- Parking Structure D (Psd)score —
Parking · 406,254 sq ft
See also: most efficient in California · biggest emitters
How does Hebrew Union College compare with other college/university buildings in California?
The latest disclosures cover 497 college/university buildings in California, out of 40,029 buildings citywide. Its site EUI of 20.3 kBtu/ft² is about 75% below the average of 79.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.4 kgCO₂e/ft² is about 71% below the group average of 4.8 kgCO₂e/ft².
At 57,000 sq ft, it is about 90% below the average floor area of 569,516 sq ft for those buildings. Its 1971 construction date is close to the group's average year built (1969). Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².
How has Hebrew Union College's energy performance changed over time?
BuildingCensus holds 4 California disclosures for Hebrew Union College, covering report years 2018–2021. Site EUI moved from 42.7 kBtu/ft² (2018) to 20.3 kBtu/ft² (2021), a 52% decrease. Reported emissions went from 149 tCO₂e to 79 tCO₂e over the same span (down 47%).
What does a site EUI of 20.3 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Hebrew Union College's 20.3 kBtu/ft² across 57,000 sq ft works out to about 1.2 billion Btu (339 MWh-equivalent) in 2021. The disclosure also reports 338,976 kWh of electricity for the year.
Which law requires Hebrew Union College to report its energy use?
Hebrew Union College reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2021 disclosure (source record california:6673765:2021). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More college/university buildings in California
- Aux Auxiliary Sites Campus View-Fm· 56,780 sq ft · EUI 62.0 kBtu/ft²
- Morgan Hall· 56,637 sq ft
- California Hall· 56,343 sq ft · EUI 15.5 kBtu/ft²
- University Of California, Riverside· 56,326 sq ft · EUI 11547.6 kBtu/ft²
- District Office, 40 South Market Street, San Jose· 55,667 sq ft · EUI 47.3 kBtu/ft²
- Som Bldgs 1-4 + Som Trailers· 55,560 sq ft · EUI 64.4 kBtu/ft²
- College/University buildings in California· 497 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Hebrew Union College's energy grade?
Hebrew Union College did not report an ENERGY STAR score in its 2021 disclosure, but its site energy-use intensity was 20.3 kBtu/ft².
How much energy does Hebrew Union College use?
Its 2021 site energy-use intensity was 20.3 kBtu/ft² across 57,000 sq ft, including 338,976 kWh of electricity.
What are Hebrew Union College's carbon emissions?
Hebrew Union College reported 79 tCO₂e of greenhouse-gas emissions (1.4 kgCO₂e/ft²) for 2021.
Where is Hebrew Union College?
Hebrew Union College is at 3077 University Ave, Los Angeles, in Los Angeles, California 90007. Its coordinates are 34.02609, -118.28214 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Hebrew Union College and when was it built?
Hebrew Union College has 57,000 sq ft of gross floor area, as reported in its 2021 disclosure. The disclosure lists 1971 as its year built. It is classed as college/university.
Is Hebrew Union College covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2021 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Hebrew Union College, Los Angeles, California — 2021 benchmarking disclosure”, https://buildingcensus.com/buildings/california/hebrew-union-college-41802055 (data as of July 9, 2026).