High Desert Detention - Ade001
Prison/Incarceration in California, CA · 9330 Commerce Way, Adelanto · 92301
At a glance
High Desert Detention - Ade001 is a 499,686-square-foot prison/incarceration building at 9330 Commerce Way, Adelanto in Adelanto, California, built in 1989. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 73.9 kBtu/ft² and 2,397 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 73.9 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 2,397 tCO₂e |
| GHG intensity | 4.8 kgCO₂e/ft² |
| Electricity | 8,597,693 kWh |
| Natural gas | 84,675 therms |
| Gross floor area | 499,686 sq ft |
| Source record | california:6366773:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 73.9 kBtu/ft² | 2,397 tCO₂e | |
| 2023 | — | 77.9 kBtu/ft² | 2,590 tCO₂e | |
| 2022 | — | 80.4 kBtu/ft² | 2,690 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 9330 Commerce Way, Adelanto
- City
- California
- State
- California
- ZIP
- 92301
- Coordinates
- 34.54790, -117.45757
Within ~1 km
Nearby benchmarked buildings
- 9400 Holly Roadscore —
Manufacturing/Industrial Plant · 68,163 sq ft
- International Carbonic Inc.score —
Manufacturing/Industrial Plant · 56,000 sq ft
See also: most efficient in California · biggest emitters
How does High Desert Detention - Ade001 compare with other prison/incarceration buildings in California?
The latest disclosures cover 117 prison/incarceration buildings in California, out of 40,029 buildings citywide. Its site EUI of 73.9 kBtu/ft² is about 20% below the average of 92.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 4.8 kgCO₂e/ft² is roughly in line with the group average of 5.3 kgCO₂e/ft².
At 499,686 sq ft, it is about 21% below the average floor area of 632,966 sq ft for those buildings. It was built in 1989, 7 years later than the group's average year built (1982).
How has High Desert Detention - Ade001's energy performance changed over time?
BuildingCensus holds 3 California disclosures for High Desert Detention - Ade001, covering report years 2022–2024. Site EUI moved from 80.4 kBtu/ft² (2022) to 73.9 kBtu/ft² (2024), a 8% decrease. Reported emissions went from 2,690 tCO₂e to 2,397 tCO₂e over the same span (down 11%).
What does a site EUI of 73.9 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. High Desert Detention - Ade001's 73.9 kBtu/ft² across 499,686 sq ft works out to about 36.9 billion Btu (10,822 MWh-equivalent) in 2024. The disclosure also reports 8,597,693 kWh of electricity and 84,675 therms of natural gas for the year.
Which law requires High Desert Detention - Ade001 to report its energy use?
High Desert Detention - Ade001 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:6366773:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More prison/incarceration buildings in California
- 00505 Mj - Lorenzo E. Patino Hall Of Justice (Benchmarking Ref. No.: Ca042522)· 494,180 sq ft · EUI 82.0 kBtu/ft²
- 00505 - Main Jail/Patino Hall Of Justice· 494,180 sq ft · EUI 91.0 kBtu/ft²
- High Desert Medical Center & Mira Loma Prison (Ab 802)· 484,755 sq ft · EUI 10.9 kBtu/ft²
- 0172 Las Colinas Detention Facility· 482,993 sq ft · EUI 1927.2 kBtu/ft²
- Sheriff - Lerdo Facility Complex· 481,802 sq ft · EUI 75.0 kBtu/ft²
- 17215 - Juvenile Justice Center· 455,059 sq ft · EUI 30.0 kBtu/ft²
- Prison/Incarceration buildings in California· 117 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is High Desert Detention - Ade001's energy grade?
High Desert Detention - Ade001 did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 73.9 kBtu/ft².
How much energy does High Desert Detention - Ade001 use?
Its 2024 site energy-use intensity was 73.9 kBtu/ft² across 499,686 sq ft, including 8,597,693 kWh of electricity and 84,675 therms of natural gas.
What are High Desert Detention - Ade001's carbon emissions?
High Desert Detention - Ade001 reported 2,397 tCO₂e of greenhouse-gas emissions (4.8 kgCO₂e/ft²) for 2024.
Where is High Desert Detention - Ade001?
High Desert Detention - Ade001 is at 9330 Commerce Way, Adelanto, in Adelanto, California 92301. Its coordinates are 34.54790, -117.45757 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is High Desert Detention - Ade001 and when was it built?
High Desert Detention - Ade001 has 499,686 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1989 as its year built. It is classed as prison/incarceration.
Is High Desert Detention - Ade001 covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “High Desert Detention - Ade001, Adelanto, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/high-desert-detention-ade001-ab089301 (data as of July 9, 2026).