BuildingCensus
–

Hollis Street Project

Other in California, CA · 5900 Hollis Street, Emeryville · 94608

At a glance

Hollis Street Project is a 137,566-square-foot other building at 5900 Hollis Street, Emeryville in Emeryville, California, built in 1933. In its 2023 California benchmarking disclosure it reported a site energy-use intensity of 2.2 kBtu/ft² and 20 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2023
Site EUI
2.2
kBtu/ft²
GHG emissions
20
tCO₂e
GHG intensity
0.1
kgCO₂e/ft²
Floor area
137,566
sq ft
Year built
1933
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI2.2 kBtu/ft²
Source EUI—
GHG emissions20 tCO₂e
GHG intensity0.1 kgCO₂e/ft²
Electricity89,843 kWh
Gross floor area137,566 sq ft
Source recordcalifornia:34560363:2023

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
5900 Hollis Street, Emeryville
State
California
ZIP
94608
Coordinates
37.84200, -122.28940

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Hollis Street Project compare with other other buildings in California?

The latest disclosures cover 773 other buildings in California, out of 40,029 buildings citywide. Its site EUI of 2.2 kBtu/ft² is about 96% below the average of 58.3 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.1 kgCO₂e/ft² is about 96% below the group average of 3.5 kgCO₂e/ft².

At 137,566 sq ft, it is about 73% below the average floor area of 511,890 sq ft for those buildings. It was built in 1933, 40 years earlier than the group's average year built (1973). Across all 24 jurisdictions BuildingCensus covers, the 1,327 other buildings average an ENERGY STAR score of 60 and a site EUI of 63.3 kBtu/ft².

What does a site EUI of 2.2 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Hollis Street Project's 2.2 kBtu/ft² across 137,566 sq ft works out to about 0.3 billion Btu (89 MWh-equivalent) in 2023. The disclosure also reports 89,843 kWh of electricity for the year.

Which law requires Hollis Street Project to report its energy use?

Hollis Street Project reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record california:34560363:2023). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More other buildings in California

Frequently asked questions

What is Hollis Street Project's energy grade?

Hollis Street Project did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 2.2 kBtu/ft².

How much energy does Hollis Street Project use?

Its 2023 site energy-use intensity was 2.2 kBtu/ft² across 137,566 sq ft, including 89,843 kWh of electricity.

What are Hollis Street Project's carbon emissions?

Hollis Street Project reported 20 tCO₂e of greenhouse-gas emissions (0.1 kgCO₂e/ft²) for 2023.

Where is Hollis Street Project?

Hollis Street Project is at 5900 Hollis Street, Emeryville, in Emeryville, California 94608. Its coordinates are 37.84200, -122.28940 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Hollis Street Project and when was it built?

Hollis Street Project has 137,566 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1933 as its year built. It is classed as other.

Is Hollis Street Project covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2023 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Hollis Street Project, Emeryville, California — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/california/hollis-street-project-a89b5360 (data as of July 9, 2026).