BuildingCensus
A

Ine00903 - Moreno Valley Eucalyptus #3

Distribution Center in California, CA · 28015 Eucalyptus Avenue, Moreno Valley · 92555

At a glance

Ine00903 - Moreno Valley Eucalyptus #3 is a 163,156-square-foot distribution center at 28015 Eucalyptus Avenue, Moreno Valley in Moreno Valley, California, built in 2018. In its 2023 California benchmarking disclosure it reported an ENERGY STAR score of 99 out of 100 (grade A), a site energy-use intensity of 2.4 kBtu/ft² and 28 tCO₂e of greenhouse-gas emissions. That score is higher than 89% of the 2,485 scored distribution center buildings in California.

ENERGY STAR score
99
band A · 2023
Site EUI
2.4
kBtu/ft²
GHG emissions
28
tCO₂e
GHG intensity
0.2
kgCO₂e/ft²
Floor area
163,156
sq ft
Year built
2018
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score99 (band A)
Site EUI2.4 kBtu/ft²
Source EUI—
GHG emissions28 tCO₂e
GHG intensity0.2 kgCO₂e/ft²
Electricity114,706 kWh
Gross floor area163,156 sq ft
Source recordcalifornia:14745011:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest99+972.4 kBtu/ft²28 tCO₂e
20222-1743.5 kBtu/ft²487 tCO₂e
202119-123.5 kBtu/ft²263 tCO₂e
202020—227 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
28015 Eucalyptus Avenue, Moreno Valley
State
California
ZIP
92555
Coordinates
33.93691, -117.17355

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Ine00903 - Moreno Valley Eucalyptus #3 compare with other distribution center buildings in California?

The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Ine00903 - Moreno Valley Eucalyptus #3's ENERGY STAR score of 99 compares with an average of 67 across the 2,485 that report a score; it scores higher than 89% of them and lower than 7%. Its site EUI of 2.4 kBtu/ft² is about 88% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.2 kgCO₂e/ft² is about 85% below the group average of 1.3 kgCO₂e/ft².

At 163,156 sq ft, it is about 32% below the average floor area of 238,298 sq ft for those buildings. It was built in 2018, 24 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².

How has Ine00903 - Moreno Valley Eucalyptus #3's energy performance changed over time?

BuildingCensus holds 4 California disclosures for Ine00903 - Moreno Valley Eucalyptus #3, covering report years 2020–2023. Its ENERGY STAR score went from 20 in 2020 to 99 in 2023 (+79 points). Site EUI moved from 23.5 kBtu/ft² (2021) to 2.4 kBtu/ft² (2023), a 90% decrease. Reported emissions went from 227 tCO₂e to 28 tCO₂e over the same span (down 88%).

What does an ENERGY STAR score of 99 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 99 means the building performs better than about 99% of its national peers. BuildingCensus bands the score into report-card grades; 99 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Ine00903 - Moreno Valley Eucalyptus #3's 2.4 kBtu/ft² across 163,156 sq ft works out to about 0.4 billion Btu (115 MWh-equivalent) in 2023. The disclosure also reports 114,706 kWh of electricity for the year.

Which law requires Ine00903 - Moreno Valley Eucalyptus #3 to report its energy use?

Ine00903 - Moreno Valley Eucalyptus #3 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record california:14745011:2023). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More distribution center buildings in California

Frequently asked questions

What is Ine00903 - Moreno Valley Eucalyptus #3's energy grade?

Ine00903 - Moreno Valley Eucalyptus #3 scores 99 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2023 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Ine00903 - Moreno Valley Eucalyptus #3 use?

Its 2023 site energy-use intensity was 2.4 kBtu/ft² across 163,156 sq ft, including 114,706 kWh of electricity.

What are Ine00903 - Moreno Valley Eucalyptus #3's carbon emissions?

Ine00903 - Moreno Valley Eucalyptus #3 reported 28 tCO₂e of greenhouse-gas emissions (0.2 kgCO₂e/ft²) for 2023.

Where is Ine00903 - Moreno Valley Eucalyptus #3?

Ine00903 - Moreno Valley Eucalyptus #3 is at 28015 Eucalyptus Avenue, Moreno Valley, in Moreno Valley, California 92555. Its coordinates are 33.93691, -117.17355 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Ine00903 - Moreno Valley Eucalyptus #3 and when was it built?

Ine00903 - Moreno Valley Eucalyptus #3 has 163,156 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 2018 as its year built. It is classed as distribution center.

Is Ine00903 - Moreno Valley Eucalyptus #3 covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2023 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Ine00903 - Moreno Valley Eucalyptus #3, Moreno Valley, California — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/california/ine00903-moreno-valley-eucalyptus-3-8bc4b991 (data as of July 9, 2026).