Ine02003 - Slover Distribution Center 3
Distribution Center in California, CA · 13169 Slover Avenue, Fontana · 92337
At a glance
Ine02003 - Slover Distribution Center 3 is a 184,755-square-foot distribution center at 13169 Slover Avenue, Fontana in Fontana, California, built in 1999. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 75 out of 100 (grade B), a site energy-use intensity of 6.6 kBtu/ft² and 81 tCO₂e of greenhouse-gas emissions. That score is higher than 45% of the 2,485 scored distribution center buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 75 (band B) |
| Site EUI | 6.6 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 81 tCO₂e |
| GHG intensity | 0.4 kgCO₂e/ft² |
| Electricity | 358,785 kWh |
| Gross floor area | 184,755 sq ft |
| Source record | california:6071573:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 75 | +3 | 6.6 kBtu/ft² | 81 tCO₂e |
| 2023 | 72 | -6 | 7.1 kBtu/ft² | 93 tCO₂e |
| 2020 | 78 | -6 | 6.1 kBtu/ft² | 69 tCO₂e |
| 2019 | 84 | +3 | 5.1 kBtu/ft² | 62 tCO₂e |
| 2018 | 81 | 5.6 kBtu/ft² | 69 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 13169 Slover Avenue, Fontana
- City
- California
- State
- California
- ZIP
- 92337
- Coordinates
- 34.06130, -117.51857
Within ~1 km
Nearby benchmarked buildings
- Commerce Wayscore 86
Distribution Center · 819,004 sq ft
- Slover Avenue Llcscore 97
Distribution Center · 671,557 sq ft
Distribution Center · 651,235 sq ft
- Valley Boulevardscore 100
Distribution Center · 600,080 sq ft
Distribution Center · 410,006 sq ft
Distribution Center · 410,006 sq ft
See also: most efficient in California · biggest emitters
How does Ine02003 - Slover Distribution Center 3 compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Ine02003 - Slover Distribution Center 3's ENERGY STAR score of 75 compares with an average of 67 across the 2,485 that report a score; it scores higher than 45% of them and lower than 54%. Its site EUI of 6.6 kBtu/ft² is about 67% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.4 kgCO₂e/ft² is about 66% below the group average of 1.3 kgCO₂e/ft².
At 184,755 sq ft, it is about 22% below the average floor area of 238,298 sq ft for those buildings. It was built in 1999, 5 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
How has Ine02003 - Slover Distribution Center 3's energy performance changed over time?
BuildingCensus holds 5 California disclosures for Ine02003 - Slover Distribution Center 3, covering report years 2018, 2019, 2020, 2023, 2024. Its ENERGY STAR score went from 81 in 2018 to 75 in 2024 (-6 points); its best year on file was 2019, at 84. Site EUI moved from 5.6 kBtu/ft² (2018) to 6.6 kBtu/ft² (2024), an 18% increase. Reported emissions went from 69 tCO₂e to 81 tCO₂e over the same span (up 18%).
What does an ENERGY STAR score of 75 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 75 means the building performs better than about 75% of its national peers. BuildingCensus bands the score into report-card grades; 75 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Ine02003 - Slover Distribution Center 3's 6.6 kBtu/ft² across 184,755 sq ft works out to about 1.2 billion Btu (357 MWh-equivalent) in 2024. The disclosure also reports 358,785 kWh of electricity for the year.
Which law requires Ine02003 - Slover Distribution Center 3 to report its energy use?
Ine02003 - Slover Distribution Center 3 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:6071573:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- North San Bernardino Bus Park· 184,654 sq ft · score 14 (D)
- 1410 E Central Ave· 184,550 sq ft · score 94 (A)
- 15989 Cypress Ave· 184,350 sq ft · score 45 (D)
- Clpf-13980 Mountain Lp (Chino Mountain)· 184,289 sq ft · score 85 (A)
- Elkay Plastics Co. Inc.· 184,225 sq ft · score 95 (A)
- Vc1· 183,891 sq ft · score 21 (D)
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Ine02003 - Slover Distribution Center 3's energy grade?
Ine02003 - Slover Distribution Center 3 scores 75 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Ine02003 - Slover Distribution Center 3 use?
Its 2024 site energy-use intensity was 6.6 kBtu/ft² across 184,755 sq ft, including 358,785 kWh of electricity.
What are Ine02003 - Slover Distribution Center 3's carbon emissions?
Ine02003 - Slover Distribution Center 3 reported 81 tCO₂e of greenhouse-gas emissions (0.4 kgCO₂e/ft²) for 2024.
Where is Ine02003 - Slover Distribution Center 3?
Ine02003 - Slover Distribution Center 3 is at 13169 Slover Avenue, Fontana, in Fontana, California 92337. Its coordinates are 34.06130, -117.51857 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Ine02003 - Slover Distribution Center 3 and when was it built?
Ine02003 - Slover Distribution Center 3 has 184,755 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1999 as its year built. It is classed as distribution center.
Is Ine02003 - Slover Distribution Center 3 covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Ine02003 - Slover Distribution Center 3, Fontana, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/ine02003-slover-distribution-center-3-d615b221 (data as of July 9, 2026).