BuildingCensus
A

Ine02609 - Chino Industrial Center #9

Distribution Center in California, CA · 14628 Yorba Avenue, Chino · 91710

At a glance

Ine02609 - Chino Industrial Center #9 is a 78,418-square-foot distribution center at 14628 Yorba Avenue, Chino in Chino, California, built in 2022. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 96 out of 100 (grade A), a site energy-use intensity of 3.3 kBtu/ft² and 17 tCO₂e of greenhouse-gas emissions. That score is higher than 81% of the 2,485 scored distribution center buildings in California.

ENERGY STAR score
96
band A · 2024
Site EUI
3.3
kBtu/ft²
GHG emissions
17
tCO₂e
GHG intensity
0.2
kgCO₂e/ft²
Floor area
78,418
sq ft
Year built
2022
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score96 (band A)
Site EUI3.3 kBtu/ft²
Source EUI—
GHG emissions17 tCO₂e
GHG intensity0.2 kgCO₂e/ft²
Electricity76,718 kWh
Gross floor area78,418 sq ft
Source recordcalifornia:14441784:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest963.3 kBtu/ft²17 tCO₂e
2023———

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
14628 Yorba Avenue, Chino
State
California
ZIP
91710
Coordinates
33.98713, -117.70274

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Ine02609 - Chino Industrial Center #9 compare with other distribution center buildings in California?

The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Ine02609 - Chino Industrial Center #9's ENERGY STAR score of 96 compares with an average of 67 across the 2,485 that report a score; it scores higher than 81% of them and lower than 16%. Its site EUI of 3.3 kBtu/ft² is about 83% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.2 kgCO₂e/ft² is about 83% below the group average of 1.3 kgCO₂e/ft².

At 78,418 sq ft, it is about 67% below the average floor area of 238,298 sq ft for those buildings. It was built in 2022, 28 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².

How has Ine02609 - Chino Industrial Center #9's energy performance changed over time?

BuildingCensus holds 2 California disclosures for Ine02609 - Chino Industrial Center #9, covering report years 2023–2024. Only one of those years carries energy figures.

What does an ENERGY STAR score of 96 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 96 means the building performs better than about 96% of its national peers. BuildingCensus bands the score into report-card grades; 96 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Ine02609 - Chino Industrial Center #9's 3.3 kBtu/ft² across 78,418 sq ft works out to about 0.3 billion Btu (76 MWh-equivalent) in 2024. The disclosure also reports 76,718 kWh of electricity for the year.

Which law requires Ine02609 - Chino Industrial Center #9 to report its energy use?

Ine02609 - Chino Industrial Center #9 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:14441784:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More distribution center buildings in California

Frequently asked questions

What is Ine02609 - Chino Industrial Center #9's energy grade?

Ine02609 - Chino Industrial Center #9 scores 96 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Ine02609 - Chino Industrial Center #9 use?

Its 2024 site energy-use intensity was 3.3 kBtu/ft² across 78,418 sq ft, including 76,718 kWh of electricity.

What are Ine02609 - Chino Industrial Center #9's carbon emissions?

Ine02609 - Chino Industrial Center #9 reported 17 tCO₂e of greenhouse-gas emissions (0.2 kgCO₂e/ft²) for 2024.

Where is Ine02609 - Chino Industrial Center #9?

Ine02609 - Chino Industrial Center #9 is at 14628 Yorba Avenue, Chino, in Chino, California 91710. Its coordinates are 33.98713, -117.70274 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Ine02609 - Chino Industrial Center #9 and when was it built?

Ine02609 - Chino Industrial Center #9 has 78,418 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2022 as its year built. It is classed as distribution center.

Is Ine02609 - Chino Industrial Center #9 covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Ine02609 - Chino Industrial Center #9, Chino, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/ine02609-chino-industrial-center-9-f01a99de (data as of July 9, 2026).