Ine04622 - Redlands Dc 22
Distribution Center in California, CA · 9724 Alabama Street, Redlands · 92374
At a glance
Ine04622 - Redlands Dc 22 is a 156,263-square-foot distribution center at 9724 Alabama Street, Redlands in Redlands, California, built in 2018. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 100 out of 100 (grade A), a site energy-use intensity of 0.5 kBtu/ft² and 6 tCO₂e of greenhouse-gas emissions. That score is higher than 93% of the 2,485 scored distribution center buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 100 (band A) |
| Site EUI | 0.5 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 6 tCO₂e |
| GHG intensity | 0.0 kgCO₂e/ft² |
| Electricity | 28,415 kWh |
| Gross floor area | 156,263 sq ft |
| Source record | california:14758819:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 100 | 0.5 kBtu/ft² | 6 tCO₂e | |
| 2023 | — | — | — | |
| 2022 | 95 | ±0 | 3.6 kBtu/ft² | 39 tCO₂e |
| 2021 | 95 | +75 | 3.6 kBtu/ft² | 39 tCO₂e |
| 2020 | 20 | — | 218 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 9724 Alabama Street, Redlands
- City
- California
- State
- California
- ZIP
- 92374
- Coordinates
- 34.07850, -117.20974
Within ~1 km
Nearby benchmarked buildings
- Ine04623 - Redlands Dc 23score 96
Distribution Center · 1,079,236 sq ft
- Ine04617 - Redlands Dc 17score 10
Distribution Center · 777,620 sq ft
- 9889 Almond Llcscore 96
Distribution Center · 614,328 sq ft
- Ine04615 - Redlands Dc 15score 87
Distribution Center · 606,759 sq ft
- Ine04606 - Redlands Dis Ctr 6score 94
Distribution Center · 600,306 sq ft
- Ine04612 - Redlands Dc 12score 96
Distribution Center · 593,563 sq ft
See also: most efficient in California · biggest emitters
How does Ine04622 - Redlands Dc 22 compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Ine04622 - Redlands Dc 22's ENERGY STAR score of 100 compares with an average of 67 across the 2,485 that report a score; it scores higher than 93% of them. Its site EUI of 0.5 kBtu/ft² is about 97% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.0 kgCO₂e/ft² is about 97% below the group average of 1.3 kgCO₂e/ft².
At 156,263 sq ft, it is about 34% below the average floor area of 238,298 sq ft for those buildings. It was built in 2018, 24 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
How has Ine04622 - Redlands Dc 22's energy performance changed over time?
BuildingCensus holds 5 California disclosures for Ine04622 - Redlands Dc 22, covering report years 2020–2024. Its ENERGY STAR score went from 20 in 2020 to 100 in 2024 (+80 points). Site EUI moved from 3.6 kBtu/ft² (2021) to 0.5 kBtu/ft² (2024), a 86% decrease. Reported emissions went from 218 tCO₂e to 6 tCO₂e over the same span (down 97%).
What does an ENERGY STAR score of 100 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: 100 is the top of the scale. BuildingCensus bands the score into report-card grades; 100 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Ine04622 - Redlands Dc 22's 0.5 kBtu/ft² across 156,263 sq ft works out to about 0.1 billion Btu (23 MWh-equivalent) in 2024. The disclosure also reports 28,415 kWh of electricity for the year.
Which law requires Ine04622 - Redlands Dc 22 to report its energy use?
Ine04622 - Redlands Dc 22 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:14758819:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- Pdc, Sacramento· 156,119 sq ft · score 42 (D)
- Silicon Valley Ic· 156,007 sq ft
- Giumarra Vineyards Corporation· 156,000 sq ft · score 1 (D)
- Eastgate Business Park· 155,943 sq ft · score 44 (D)
- 14969 Summit Drive - 13210· 155,742 sq ft · score 91 (A)
- Bimbo Bakeries Usa West Sacramento Distribution Center· 155,694 sq ft · score 79 (B)
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Ine04622 - Redlands Dc 22's energy grade?
Ine04622 - Redlands Dc 22 scores 100 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Ine04622 - Redlands Dc 22 use?
Its 2024 site energy-use intensity was 0.5 kBtu/ft² across 156,263 sq ft, including 28,415 kWh of electricity.
What are Ine04622 - Redlands Dc 22's carbon emissions?
Ine04622 - Redlands Dc 22 reported 6 tCO₂e of greenhouse-gas emissions (0.0 kgCO₂e/ft²) for 2024.
Where is Ine04622 - Redlands Dc 22?
Ine04622 - Redlands Dc 22 is at 9724 Alabama Street, Redlands, in Redlands, California 92374. Its coordinates are 34.07850, -117.20974 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Ine04622 - Redlands Dc 22 and when was it built?
Ine04622 - Redlands Dc 22 has 156,263 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2018 as its year built. It is classed as distribution center.
Is Ine04622 - Redlands Dc 22 covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Ine04622 - Redlands Dc 22, Redlands, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/ine04622-redlands-dc-22-52d33dc4 (data as of July 9, 2026).