Irritecusa, Inc
Manufacturing/Industrial Plant in California, CA · 1420 N Irritec Way, Fresno · 93703
At a glance
Irritecusa, Inc is a 138,262-square-foot manufacturing/industrial plant at 1420 N Irritec Way, Fresno in Fresno, California, built in 1965. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 89.9 kBtu/ft² and 719 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 89.9 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 719 tCO₂e |
| GHG intensity | 5.2 kgCO₂e/ft² |
| Electricity | 3,170,806 kWh |
| Natural gas | 143 therms |
| Gross floor area | 138,262 sq ft |
| Source record | california:25181921:2024 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1420 N Irritec Way, Fresno
- City
- California
- State
- California
- ZIP
- 93703
- Coordinates
- 36.76223, -119.74269
Within ~1 km
Nearby benchmarked buildings
Multifamily Housing · 81,940 sq ft
- Sunset Sands Apartmentsscore 100
Multifamily Housing · 74,448 sq ft
- Norseman Esscore 62
K-12 School · 63,229 sq ft
- Norseman Elementaryscore 68
K-12 School · 63,229 sq ft
- Ericson Esscore 81
K-12 School · 53,005 sq ft
- Ericson Elementaryscore 58
K-12 School · 53,005 sq ft
See also: most efficient in California · biggest emitters
How does Irritecusa, Inc compare with other manufacturing/industrial plant buildings in California?
The latest disclosures cover 982 manufacturing/industrial plant buildings in California, out of 40,029 buildings citywide. Its site EUI of 89.9 kBtu/ft² is about 30% below the average of 127.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 5.2 kgCO₂e/ft² is about 30% below the group average of 7.4 kgCO₂e/ft².
At 138,262 sq ft, it is roughly in line with the average floor area of 135,409 sq ft for those buildings. It was built in 1965, 17 years earlier than the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².
What does a site EUI of 89.9 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Irritecusa, Inc's 89.9 kBtu/ft² across 138,262 sq ft works out to about 12.4 billion Btu (3,643 MWh-equivalent) in 2024. The disclosure also reports 3,170,806 kWh of electricity and 143 therms of natural gas for the year.
Which law requires Irritecusa, Inc to report its energy use?
Irritecusa, Inc reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:25181921:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More manufacturing/industrial plant buildings in California
- 4510 South Alameda St, Vernon, Ca 90058· 137,534 sq ft · EUI 324.5 kBtu/ft²
- Orangewood Industrial Park, L.P.· 136,980 sq ft · EUI 9.3 kBtu/ft²
- Dominguez Property· 136,900 sq ft · EUI 7.4 kBtu/ft²
- 1735 S Santa Fe· 136,879 sq ft · EUI 13.7 kBtu/ft²
- Bgch83 - 3783 Channel Drive(Bg)· 135,680 sq ft · EUI 2.1 kBtu/ft²
- Berry Global - 14000 Monte Vista Ave· 135,236 sq ft · EUI 762.9 kBtu/ft²
- Manufacturing/Industrial Plant buildings in California· 982 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Irritecusa, Inc's energy grade?
Irritecusa, Inc did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 89.9 kBtu/ft².
How much energy does Irritecusa, Inc use?
Its 2024 site energy-use intensity was 89.9 kBtu/ft² across 138,262 sq ft, including 3,170,806 kWh of electricity and 143 therms of natural gas.
What are Irritecusa, Inc's carbon emissions?
Irritecusa, Inc reported 719 tCO₂e of greenhouse-gas emissions (5.2 kgCO₂e/ft²) for 2024.
Where is Irritecusa, Inc?
Irritecusa, Inc is at 1420 N Irritec Way, Fresno, in Fresno, California 93703. Its coordinates are 36.76223, -119.74269 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Irritecusa, Inc and when was it built?
Irritecusa, Inc has 138,262 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1965 as its year built. It is classed as manufacturing/industrial plant.
Is Irritecusa, Inc covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Irritecusa, Inc, Fresno, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/irritecusa-inc-60ffb234 (data as of July 9, 2026).