Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce)
Laboratory in California, CA · 923 Bloom Walk, Los Angeles · 90089
At a glance
Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) is a 26,530-square-foot laboratory building at 923 Bloom Walk, Los Angeles in Los Angeles, California, built in 1958. In its 2020 California benchmarking disclosure it reported a site energy-use intensity of 253.9 kBtu/ft² and 375 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2020
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 253.9 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 375 tCO₂e |
| GHG intensity | 14.1 kgCO₂e/ft² |
| Electricity | 521,389 kWh |
| Natural gas | 26,940 therms |
| Gross floor area | 26,530 sq ft |
| Source record | california:6800023:2020 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 923 Bloom Walk, Los Angeles
- City
- California
- State
- California
- ZIP
- 90089
- Coordinates
- 34.02010, -118.28903
Within ~1 km
Nearby benchmarked buildings
- University Park Campus (Upc)score —
College/University · 8,763,109 sq ft
- University Village (Uvi)score —
Residence Hall/Dormitory · 1,207,266 sq ft
- Parking Structure A (Psa)score —
Parking · 548,534 sq ft
Residence Hall/Dormitory · 492,541 sq ft
Museum · 425,224 sq ft
- Parking Structure D (Psd)score —
Parking · 406,254 sq ft
See also: most efficient in California · biggest emitters
How does Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) compare with other laboratory buildings in California?
The latest disclosures cover 308 laboratory buildings in California, out of 40,029 buildings citywide. Its site EUI of 253.9 kBtu/ft² is about 40% above the average of 181.8 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 14.1 kgCO₂e/ft² is about 27% above the group average of 11.1 kgCO₂e/ft².
At 26,530 sq ft, it is about 78% below the average floor area of 121,485 sq ft for those buildings. It was built in 1958, 34 years earlier than the group's average year built (1992). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².
What does a site EUI of 253.9 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce)'s 253.9 kBtu/ft² across 26,530 sq ft works out to about 6.7 billion Btu (1,974 MWh-equivalent) in 2020. The disclosure also reports 521,389 kWh of electricity and 26,940 therms of natural gas for the year.
Which law requires Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) to report its energy use?
Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2020 disclosure (source record california:6800023:2020). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More laboratory buildings in California
- Robert Glen Rapp Engineering Research Building (Rrb)· 23,195 sq ft · EUI 52.1 kBtu/ft²
- Building H, 8101 Rosemead Blvd., Pico Rivera· 1,992 sq ft · EUI 18147.6 kBtu/ft²
- Laboratory buildings in California· 308 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce)'s energy grade?
Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) did not report an ENERGY STAR score in its 2020 disclosure, but its site energy-use intensity was 253.9 kBtu/ft².
How much energy does Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) use?
Its 2020 site energy-use intensity was 253.9 kBtu/ft² across 26,530 sq ft, including 521,389 kWh of electricity and 26,940 therms of natural gas.
What are Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce)'s carbon emissions?
Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) reported 375 tCO₂e of greenhouse-gas emissions (14.1 kgCO₂e/ft²) for 2020.
Where is Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce)?
Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) is at 923 Bloom Walk, Los Angeles, in Los Angeles, California 90089. Its coordinates are 34.02010, -118.28903 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) and when was it built?
Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) has 26,530 sq ft of gross floor area, as reported in its 2020 disclosure. The disclosure lists 1958 as its year built. It is classed as laboratory.
Is Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce) covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2020 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Jerry & Nancy Neely Petroleum & Chemical Engineering Building (Pce), Los Angeles, California — 2020 benchmarking disclosure”, https://buildingcensus.com/buildings/california/jerry-nancy-neely-petroleum-chemical-engineering-building-pce-0146fc23 (data as of July 9, 2026).