Kargo Master Rancho Cordova
Manufacturing/Industrial Plant in California, CA · 2587 Mercantile Drive, Rancho Cordova · 95742
At a glance
Kargo Master Rancho Cordova is a 52,200-square-foot manufacturing/industrial plant at 2587 Mercantile Drive, Rancho Cordova in Rancho Cordova, California, built in 1980. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 4.9 kBtu/ft² and 17 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 4.9 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 17 tCO₂e |
| GHG intensity | 0.3 kgCO₂e/ft² |
| Electricity | 76,642 kWh |
| Gross floor area | 52,200 sq ft |
| Source record | california:27307154:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 4.9 kBtu/ft² | 17 tCO₂e | |
| 2023 | — | 5.1 kBtu/ft² | 19 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 2587 Mercantile Drive, Rancho Cordova
- City
- California
- State
- California
- ZIP
- 95742
- Coordinates
- 38.60735, -121.25852
Within ~1 km
Nearby benchmarked buildings
- Fjm Sunrise Industrial Parkscore —
Distribution Center · 266,956 sq ft
- Folsom Blvdscore —
Mixed Use Property · 145,160 sq ft
- 2700 Mercantilescore 41
Distribution Center · 135,456 sq ft
- 2750 Mercantile Drivescore 58
Non-Refrigerated Warehouse · 116,480 sq ft
- 11290Pyriscore 100
Office · 107,020 sq ft
Non-Refrigerated Warehouse · 105,000 sq ft
See also: most efficient in California · biggest emitters
How does Kargo Master Rancho Cordova compare with other manufacturing/industrial plant buildings in California?
The latest disclosures cover 982 manufacturing/industrial plant buildings in California, out of 40,029 buildings citywide. Its site EUI of 4.9 kBtu/ft² is about 96% below the average of 127.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.3 kgCO₂e/ft² is about 96% below the group average of 7.4 kgCO₂e/ft².
At 52,200 sq ft, it is about 61% below the average floor area of 135,409 sq ft for those buildings. Its 1980 construction date is close to the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².
How has Kargo Master Rancho Cordova's energy performance changed over time?
BuildingCensus holds 2 California disclosures for Kargo Master Rancho Cordova, covering report years 2023–2024. Site EUI moved from 5.1 kBtu/ft² (2023) to 4.9 kBtu/ft² (2024), a 4% decrease. Reported emissions went from 19 tCO₂e to 17 tCO₂e over the same span (down 8%).
What does a site EUI of 4.9 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Kargo Master Rancho Cordova's 4.9 kBtu/ft² across 52,200 sq ft works out to about 0.3 billion Btu (75 MWh-equivalent) in 2024. The disclosure also reports 76,642 kWh of electricity for the year.
Which law requires Kargo Master Rancho Cordova to report its energy use?
Kargo Master Rancho Cordova reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:27307154:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More manufacturing/industrial plant buildings in California
- Data Physics Corporation-Test Systems· 52,000 sq ft · EUI 9.2 kBtu/ft²
- 808 Western Avenue· 52,000 sq ft · EUI 99.0 kBtu/ft²
- 21730-21748 Marilla St - 12952· 52,000 sq ft · EUI 5.0 kBtu/ft²
- 13576 Desmond St - Ladbs· 52,000 sq ft · EUI 27.9 kBtu/ft²
- Washington United Industrial Center· 52,000 sq ft · EUI 0.1 kBtu/ft²
- Chino Building· 52,000 sq ft · EUI 2.5 kBtu/ft²
- Manufacturing/Industrial Plant buildings in California· 982 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Kargo Master Rancho Cordova's energy grade?
Kargo Master Rancho Cordova did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 4.9 kBtu/ft².
How much energy does Kargo Master Rancho Cordova use?
Its 2024 site energy-use intensity was 4.9 kBtu/ft² across 52,200 sq ft, including 76,642 kWh of electricity.
What are Kargo Master Rancho Cordova's carbon emissions?
Kargo Master Rancho Cordova reported 17 tCO₂e of greenhouse-gas emissions (0.3 kgCO₂e/ft²) for 2024.
Where is Kargo Master Rancho Cordova?
Kargo Master Rancho Cordova is at 2587 Mercantile Drive, Rancho Cordova, in Rancho Cordova, California 95742. Its coordinates are 38.60735, -121.25852 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Kargo Master Rancho Cordova and when was it built?
Kargo Master Rancho Cordova has 52,200 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1980 as its year built. It is classed as manufacturing/industrial plant.
Is Kargo Master Rancho Cordova covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Kargo Master Rancho Cordova, Rancho Cordova, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/kargo-master-rancho-cordova-efc623f0 (data as of July 9, 2026).