Mission Trails Industrial Park
Manufacturing/Industrial Plant in California, CA · 7345 Mission Gorge Road, San Diego · 92120
At a glance
Mission Trails Industrial Park is a 651,279-square-foot manufacturing/industrial plant at 7345 Mission Gorge Road, San Diego in San Diego, California, built in 1999. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 9.6 kBtu/ft² and 419 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 9.6 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 419 tCO₂e |
| GHG intensity | 0.6 kgCO₂e/ft² |
| Electricity | 1,603,117 kWh |
| Natural gas | 10,450 therms |
| Gross floor area | 651,279 sq ft |
| Source record | california:6616806:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 9.6 kBtu/ft² | 419 tCO₂e | |
| 2023 | — | 4.0 kBtu/ft² | 177 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 7345 Mission Gorge Road, San Diego
- City
- California
- State
- California
- ZIP
- 92120
- Coordinates
- 32.80296, -117.08557
Within ~1 km
Nearby benchmarked buildings
- 7411 Goen Placescore 100
Distribution Center · 292,490 sq ft
- 7365 Mission Gorge Roadscore 100
Distribution Center · 131,876 sq ft
- 7385 Mission Gorge Roadscore 100
Non-Refrigerated Warehouse · 113,092 sq ft
- Princess View Associatesscore —
Self-Storage Facility · 106,840 sq ft
- Lewis Middlescore 86
K-12 School · 100,516 sq ft
Self-Storage Facility · 68,740 sq ft
See also: most efficient in California · biggest emitters
How does Mission Trails Industrial Park compare with other manufacturing/industrial plant buildings in California?
The latest disclosures cover 982 manufacturing/industrial plant buildings in California, out of 40,029 buildings citywide. Its site EUI of 9.6 kBtu/ft² is about 92% below the average of 127.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.6 kgCO₂e/ft² is about 91% below the group average of 7.4 kgCO₂e/ft².
At 651,279 sq ft, it is about 381% above the average floor area of 135,409 sq ft for those buildings. It was built in 1999, 17 years later than the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².
How has Mission Trails Industrial Park's energy performance changed over time?
BuildingCensus holds 2 California disclosures for Mission Trails Industrial Park, covering report years 2023–2024. Site EUI moved from 4.0 kBtu/ft² (2023) to 9.6 kBtu/ft² (2024), an 140% increase. Reported emissions went from 177 tCO₂e to 419 tCO₂e over the same span (up 137%).
What does a site EUI of 9.6 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Mission Trails Industrial Park's 9.6 kBtu/ft² across 651,279 sq ft works out to about 6.3 billion Btu (1,832 MWh-equivalent) in 2024. The disclosure also reports 1,603,117 kWh of electricity and 10,450 therms of natural gas for the year.
Which law requires Mission Trails Industrial Park to report its energy use?
Mission Trails Industrial Park reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:6616806:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More manufacturing/industrial plant buildings in California
- Carpenter Co.· 625,000 sq ft · EUI 68.8 kBtu/ft²
- Lpf 11101 Etiwanda· 611,968 sq ft · EUI 26.4 kBtu/ft²
- Tabc - Long Beach, Ca· 609,840 sq ft · EUI 127.2 kBtu/ft²
- 974 E Arques Ave (B81)· 606,758 sq ft
- 3100 Lomita Blvd (Rexford Ab 802)· 575,978 sq ft · EUI 335.6 kBtu/ft²
- 17100 Perris Blvd - 13119· 555,670 sq ft · EUI 24.3 kBtu/ft²
- Manufacturing/Industrial Plant buildings in California· 982 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Mission Trails Industrial Park's energy grade?
Mission Trails Industrial Park did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 9.6 kBtu/ft².
How much energy does Mission Trails Industrial Park use?
Its 2024 site energy-use intensity was 9.6 kBtu/ft² across 651,279 sq ft, including 1,603,117 kWh of electricity and 10,450 therms of natural gas.
What are Mission Trails Industrial Park's carbon emissions?
Mission Trails Industrial Park reported 419 tCO₂e of greenhouse-gas emissions (0.6 kgCO₂e/ft²) for 2024.
Where is Mission Trails Industrial Park?
Mission Trails Industrial Park is at 7345 Mission Gorge Road, San Diego, in San Diego, California 92120. Its coordinates are 32.80296, -117.08557 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Mission Trails Industrial Park and when was it built?
Mission Trails Industrial Park has 651,279 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1999 as its year built. It is classed as manufacturing/industrial plant.
Is Mission Trails Industrial Park covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Mission Trails Industrial Park, San Diego, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/mission-trails-industrial-park-52be60ab (data as of July 9, 2026).