Normandie North Mob Campus
Medical Office in California, CA · 26003 Normandie Avenue, Los Angeles · 90710
At a glance
Normandie North Mob Campus is a 80,458-square-foot medical office at 26003 Normandie Avenue, Los Angeles in Los Angeles, California, built in 1982. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 146.4 kBtu/ft² and 723 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 146.4 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 723 tCO₂e |
| GHG intensity | 9.0 kgCO₂e/ft² |
| Electricity | 2,028,364 kWh |
| Gross floor area | 80,458 sq ft |
| Source record | california:5889004:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 146.4 kBtu/ft² | 723 tCO₂e | |
| 2023 | — | 132.8 kBtu/ft² | 692 tCO₂e | |
| 2022 | — | 134.0 kBtu/ft² | 685 tCO₂e | |
| 2021 | — | 137.4 kBtu/ft² | 638 tCO₂e | |
| 2020 | — | 141.7 kBtu/ft² | 699 tCO₂e | |
| 2019 | — | 143.2 kBtu/ft² | 731 tCO₂e | |
| 2018 | — | 135.8 kBtu/ft² | 699 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 26003 Normandie Avenue, Los Angeles
- City
- California
- State
- California
- ZIP
- 90710
- Coordinates
- 33.78696, -118.29830
Within ~1 km
Nearby benchmarked buildings
- South Bay Hospital Campusscore 74
Hospital (General Medical & Surgical) · 928,628 sq ft
Hospital (General Medical & Surgical) · 584,909 sq ft
Multifamily Housing · 468,899 sq ft
Parking · 401,753 sq ft
Parking · 278,841 sq ft
Medical Office · 108,702 sq ft
See also: most efficient in California · biggest emitters
How does Normandie North Mob Campus compare with other medical office buildings in California?
The latest disclosures cover 602 medical office buildings in California, out of 40,029 buildings citywide. Its site EUI of 146.4 kBtu/ft² is about 55% above the average of 94.3 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 9.0 kgCO₂e/ft² is about 60% above the group average of 5.6 kgCO₂e/ft².
At 80,458 sq ft, it is about 20% below the average floor area of 100,847 sq ft for those buildings. It was built in 1982, 9 years earlier than the group's average year built (1991). Across all 24 jurisdictions BuildingCensus covers, the 1,266 medical office buildings average an ENERGY STAR score of 64 and a site EUI of 92.2 kBtu/ft².
How has Normandie North Mob Campus's energy performance changed over time?
BuildingCensus holds 7 California disclosures for Normandie North Mob Campus, covering report years 2018–2024. Site EUI moved from 135.8 kBtu/ft² (2018) to 146.4 kBtu/ft² (2024), an 8% increase. Reported emissions went from 699 tCO₂e to 723 tCO₂e over the same span (up 3%).
What does a site EUI of 146.4 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Normandie North Mob Campus's 146.4 kBtu/ft² across 80,458 sq ft works out to about 11.8 billion Btu (3,452 MWh-equivalent) in 2024. The disclosure also reports 2,028,364 kWh of electricity for the year.
Which law requires Normandie North Mob Campus to report its energy use?
Normandie North Mob Campus reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:5889004:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More medical office buildings in California
- 3261 Overland Ave· 80,441 sq ft · score 100 (A)
- 3838 California St.· 80,228 sq ft · score 48 (D)
- Kaiser Permanente - Ca3941 - Harbor/Macarthur Medical Offices· 80,226 sq ft · score 23 (D)
- 1040 Elm Ave· 80,150 sq ft · score 93 (A)
- Palomar Health Outpatient Center Ii· 80,064 sq ft · score 80 (B)
- Mhs | Long Beach | Children'S Village Mob· 80,000 sq ft · score 91 (A)
- Medical Office buildings in California· 602 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Normandie North Mob Campus's energy grade?
Normandie North Mob Campus did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 146.4 kBtu/ft².
How much energy does Normandie North Mob Campus use?
Its 2024 site energy-use intensity was 146.4 kBtu/ft² across 80,458 sq ft, including 2,028,364 kWh of electricity.
What are Normandie North Mob Campus's carbon emissions?
Normandie North Mob Campus reported 723 tCO₂e of greenhouse-gas emissions (9.0 kgCO₂e/ft²) for 2024.
Where is Normandie North Mob Campus?
Normandie North Mob Campus is at 26003 Normandie Avenue, Los Angeles, in Los Angeles, California 90710. Its coordinates are 33.78696, -118.29830 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Normandie North Mob Campus and when was it built?
Normandie North Mob Campus has 80,458 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1982 as its year built. It is classed as medical office.
Is Normandie North Mob Campus covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Normandie North Mob Campus, Los Angeles, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/normandie-north-mob-campus-dfdb4072 (data as of July 9, 2026).