Olume (Lm59) (Not)
Multifamily Housing in California, CA · 1401 Mission Street, San Francisco · 94103
At a glance
Olume (Lm59) (Not) is a 138,512-square-foot multifamily housing building at 1401 Mission Street, San Francisco in San Francisco, California, built in 2016. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 97 out of 100 (grade A), a site energy-use intensity of 25.6 kBtu/ft² and 219 tCO₂e of greenhouse-gas emissions. That score is higher than 63% of the 9,612 scored multifamily housing buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 97 (band A) |
| Site EUI | 25.6 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 219 tCO₂e |
| GHG intensity | 1.6 kgCO₂e/ft² |
| Electricity | 659,391 kWh |
| Natural gas | 13,127 therms |
| Gross floor area | 138,512 sq ft |
| Source record | california:6151614:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 97 | 25.6 kBtu/ft² | 219 tCO₂e | |
| 2023 | — | — | 274 tCO₂e | |
| 2022 | 100 | +1 | 17.8 kBtu/ft² | 151 tCO₂e |
| 2021 | 99 | +5 | 22.3 kBtu/ft² | 177 tCO₂e |
| 2020 | 94 | +1 | 27.4 kBtu/ft² | 228 tCO₂e |
| 2019 | 93 | 28.3 kBtu/ft² | 246 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1401 Mission Street, San Francisco
- City
- California
- State
- California
- ZIP
- 94103
- Coordinates
- 37.77491, -122.41599
Within ~1 km
Nearby benchmarked buildings
- 1455 Market Streetscore —
Commercial · 1,339,547 sq ft
- 1455 Market Streetscore 92
Office · 1,189,547 sq ft
Office · 1,055,601 sq ft
- NEMA SFscore 100
Multifamily · 1,044,955 sq ft
- Nema Apartmentsscore 99
Multifamily Housing · 951,676 sq ft
- 33 8TH STscore 100
Multifamily · 918,968 sq ft
See also: most efficient in California · biggest emitters
How does Olume (Lm59) (Not) compare with other multifamily housing buildings in California?
The latest disclosures cover 10,630 multifamily housing buildings in California, out of 40,029 buildings citywide. Olume (Lm59) (Not)'s ENERGY STAR score of 97 compares with an average of 82 across the 9,612 that report a score; it scores higher than 63% of them and lower than 34%. Its site EUI of 25.6 kBtu/ft² is about 26% below the average of 34.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.6 kgCO₂e/ft² is about 25% below the group average of 2.1 kgCO₂e/ft².
At 138,512 sq ft, it is roughly in line with the average floor area of 150,919 sq ft for those buildings. It was built in 2016, 28 years later than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².
How has Olume (Lm59) (Not)'s energy performance changed over time?
BuildingCensus holds 6 California disclosures for Olume (Lm59) (Not), covering report years 2019–2024. Its ENERGY STAR score went from 93 in 2019 to 97 in 2024 (+4 points); its best year on file was 2022, at 100. Site EUI moved from 28.3 kBtu/ft² (2019) to 25.6 kBtu/ft² (2024), a 10% decrease. Reported emissions went from 246 tCO₂e to 219 tCO₂e over the same span (down 11%).
What does an ENERGY STAR score of 97 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 97 means the building performs better than about 97% of its national peers. BuildingCensus bands the score into report-card grades; 97 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Olume (Lm59) (Not)'s 25.6 kBtu/ft² across 138,512 sq ft works out to about 3.5 billion Btu (1,039 MWh-equivalent) in 2024. The disclosure also reports 659,391 kWh of electricity and 13,127 therms of natural gas for the year.
Which law requires Olume (Lm59) (Not) to report its energy use?
Olume (Lm59) (Not) reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:6151614:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More multifamily housing buildings in California
- Villa Siena #50· 138,460 sq ft · score 31 (D)
- Orangewood Gardens· 138,350 sq ft
- Balboa Court (1690Na)· 138,337 sq ft · score 78 (B)
- The Huntington: The Huntington· 138,322 sq ft · score 97 (A)
- 645 Lantana St (Villa Camarillo I) - Fdc Management· 138,276 sq ft · score 100 (A)
- 9090 Moody St· 138,263 sq ft · score 42 (D)
- Multifamily Housing buildings in California· 10,630 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Olume (Lm59) (Not)'s energy grade?
Olume (Lm59) (Not) scores 97 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Olume (Lm59) (Not) use?
Its 2024 site energy-use intensity was 25.6 kBtu/ft² across 138,512 sq ft, including 659,391 kWh of electricity and 13,127 therms of natural gas.
What are Olume (Lm59) (Not)'s carbon emissions?
Olume (Lm59) (Not) reported 219 tCO₂e of greenhouse-gas emissions (1.6 kgCO₂e/ft²) for 2024.
Where is Olume (Lm59) (Not)?
Olume (Lm59) (Not) is at 1401 Mission Street, San Francisco, in San Francisco, California 94103. Its coordinates are 37.77491, -122.41599 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Olume (Lm59) (Not) and when was it built?
Olume (Lm59) (Not) has 138,512 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2016 as its year built. It is classed as multifamily housing.
Is Olume (Lm59) (Not) covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Olume (Lm59) (Not), San Francisco, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/olume-lm59-not-0521f52a (data as of July 9, 2026).