Oracle Hq 100 Oracle Parkway
Office in California, CA · 100 Oracle Parkway, Redwood City · 94065
At a glance
Oracle Hq 100 Oracle Parkway is a 155,375-square-foot office building at 100 Oracle Parkway, Redwood City in Redwood City, California, built in 1995. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 30.0 kBtu/ft² and 294 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 30.0 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 294 tCO₂e |
| GHG intensity | 1.9 kgCO₂e/ft² |
| Electricity | 1,083,319 kWh |
| Natural gas | 9,112 therms |
| Gross floor area | 155,375 sq ft |
| Source record | california:2677843:2024 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 100 Oracle Parkway, Redwood City
- City
- California
- State
- California
- ZIP
- 94065
- Coordinates
- 37.52970, -122.26583
Within ~1 km
Nearby benchmarked buildings
- Oracle Hq 300 Oracle Parkwayscore 76
Office · 317,383 sq ft
- Oracle Hq 600 Oracle Parkwayscore —
Office · 278,336 sq ft
- Oracle Hq 400 Oracle Parkwayscore —
Office · 267,694 sq ft
- 10 Twin Dolphinscore —
Office · 263,024 sq ft
- Redwood City Ca Gbhsfscore 30
Hotel · 256,273 sq ft
- Oracle Hq 500 Oracle Parkwayscore —
Office · 233,169 sq ft
See also: most efficient in California · biggest emitters
How does Oracle Hq 100 Oracle Parkway compare with other office buildings in California?
The latest disclosures cover 6,214 office buildings in California, out of 40,029 buildings citywide. Its site EUI of 30.0 kBtu/ft² is about half of the average of 56.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.9 kgCO₂e/ft² is about half of the group average of 3.6 kgCO₂e/ft².
At 155,375 sq ft, it is roughly in line with the average floor area of 151,937 sq ft for those buildings. It was built in 1995, 10 years later than the group's average year built (1985). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².
What does a site EUI of 30.0 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Oracle Hq 100 Oracle Parkway's 30.0 kBtu/ft² across 155,375 sq ft works out to about 4.7 billion Btu (1,366 MWh-equivalent) in 2024. The disclosure also reports 1,083,319 kWh of electricity and 9,112 therms of natural gas for the year.
Which law requires Oracle Hq 100 Oracle Parkway to report its energy use?
Oracle Hq 100 Oracle Parkway reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:2677843:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More office buildings in California
- Campus At Lawson Lane-Building A· 155,370 sq ft · score 55 (C)
- Campus At Lawson Lane-Building B· 155,310 sq ft · score 69 (C)
- Us-Svl-Java111· 155,296 sq ft · score 92 (A)
- Kearny Mesa #5 (Correct)· 155,250 sq ft
- Sog - Atrium Office Building· 155,219 sq ft · score 55 (C)
- 5515 E La Palma· 155,179 sq ft · EUI 44.0 kBtu/ft²
- Office buildings in California· 6,214 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Oracle Hq 100 Oracle Parkway's energy grade?
Oracle Hq 100 Oracle Parkway did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 30.0 kBtu/ft².
How much energy does Oracle Hq 100 Oracle Parkway use?
Its 2024 site energy-use intensity was 30.0 kBtu/ft² across 155,375 sq ft, including 1,083,319 kWh of electricity and 9,112 therms of natural gas.
What are Oracle Hq 100 Oracle Parkway's carbon emissions?
Oracle Hq 100 Oracle Parkway reported 294 tCO₂e of greenhouse-gas emissions (1.9 kgCO₂e/ft²) for 2024.
Where is Oracle Hq 100 Oracle Parkway?
Oracle Hq 100 Oracle Parkway is at 100 Oracle Parkway, Redwood City, in Redwood City, California 94065. Its coordinates are 37.52970, -122.26583 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Oracle Hq 100 Oracle Parkway and when was it built?
Oracle Hq 100 Oracle Parkway has 155,375 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1995 as its year built. It is classed as office.
Is Oracle Hq 100 Oracle Parkway covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Oracle Hq 100 Oracle Parkway, Redwood City, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/oracle-hq-100-oracle-parkway-c5ba1b14 (data as of July 9, 2026).