Phs | Alvarado Hospital Medical Center | West Tower
Hospital (General Medical & Surgical) in California, CA · 6645 Alvarado Rd., San Diego · 92120
At a glance
Phs | Alvarado Hospital Medical Center | West Tower is a 107,000-square-foot hospital (general medical & surgical) at 6645 Alvarado Rd., San Diego in San Diego, California, built in 1989. In its 2022 California benchmarking disclosure it reported an ENERGY STAR score of 73 out of 100 (grade B), a site energy-use intensity of 170.0 kBtu/ft² and 1,131 tCO₂e of greenhouse-gas emissions. That score is higher than 56% of the 300 scored hospital (general medical & surgical) buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2022
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 73 (band B) |
| Site EUI | 170.0 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 1,131 tCO₂e |
| GHG intensity | 10.6 kgCO₂e/ft² |
| Electricity | 3,059,118 kWh |
| Natural gas | 78,347 therms |
| Gross floor area | 107,000 sq ft |
| Source record | california:11907016:2022 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2022latest | 73 | +22 | 170.0 kBtu/ft² | 1,131 tCO₂e |
| 2021 | 51 | -1 | 203.2 kBtu/ft² | 1,233 tCO₂e |
| 2020 | 52 | 211.2 kBtu/ft² | 1,319 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 6645 Alvarado Rd., San Diego
- City
- California
- State
- California
- ZIP
- 92120
- Coordinates
- 32.77716, -117.05675
Within ~1 km
Nearby benchmarked buildings
- Iconic On Alvarado (Sv80)score 97
Multifamily Housing · 391,987 sq ft
- East Towerscore 57
Hospital (General Medical & Surgical) · 202,694 sq ft
- Palmilla (Villa Del Sol)score 69
Multifamily Housing · 193,288 sq ft
- Palmilla (pa631)score —
Multifamily Housing · 193,288 sq ft
Hospital (General Medical & Surgical) · 185,737 sq ft
Hospital (General Medical & Surgical) · 185,737 sq ft
See also: most efficient in California · biggest emitters
How does Phs | Alvarado Hospital Medical Center | West Tower compare with other hospital (general medical & surgical) buildings in California?
The latest disclosures cover 329 hospital (general medical & surgical) buildings in California, out of 40,029 buildings citywide. Phs | Alvarado Hospital Medical Center | West Tower's ENERGY STAR score of 73 compares with an average of 59 across the 300 that report a score; it scores higher than 56% of them and lower than 43%. Its site EUI of 170.0 kBtu/ft² is about 29% below the average of 238.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 10.6 kgCO₂e/ft² is about 25% below the group average of 14.1 kgCO₂e/ft².
At 107,000 sq ft, it is about 75% below the average floor area of 432,386 sq ft for those buildings. It was built in 1989, 12 years later than the group's average year built (1978). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².
How has Phs | Alvarado Hospital Medical Center | West Tower's energy performance changed over time?
BuildingCensus holds 3 California disclosures for Phs | Alvarado Hospital Medical Center | West Tower, covering report years 2020–2022. Its ENERGY STAR score went from 52 in 2020 to 73 in 2022 (+21 points). Site EUI moved from 211.2 kBtu/ft² (2020) to 170.0 kBtu/ft² (2022), a 20% decrease. Reported emissions went from 1,319 tCO₂e to 1,131 tCO₂e over the same span (down 14%).
What does an ENERGY STAR score of 73 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 73 means the building performs better than about 73% of its national peers. BuildingCensus bands the score into report-card grades; 73 falls in band B — above median (70–84). It sits 2 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Phs | Alvarado Hospital Medical Center | West Tower's 170.0 kBtu/ft² across 107,000 sq ft works out to about 18.2 billion Btu (5,331 MWh-equivalent) in 2022. The disclosure also reports 3,059,118 kWh of electricity and 78,347 therms of natural gas for the year.
Which law requires Phs | Alvarado Hospital Medical Center | West Tower to report its energy use?
Phs | Alvarado Hospital Medical Center | West Tower reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:11907016:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More hospital (general medical & surgical) buildings in California
- (Ca) Sharp | 250 Prospect Place· 104,504 sq ft · score 31 (D)
- John Muir Health Mob· 103,903 sq ft · EUI 77.3 kBtu/ft²
- Foothill Presbyterian Hospital· 102,119 sq ft · score 82 (B)
- Phs | Ca | La Palma Intercommunity Hospital· 101,574 sq ft · score 100 (A)
- Adventist-Ahuv-275 Hospital Dr· 101,170 sq ft · score 88 (A)
- Anaheim Global Medical Center· 100,010 sq ft · score 100 (A)
- Hospital (General Medical & Surgical) buildings in California· 329 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Phs | Alvarado Hospital Medical Center | West Tower's energy grade?
Phs | Alvarado Hospital Medical Center | West Tower scores 73 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2022 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Phs | Alvarado Hospital Medical Center | West Tower use?
Its 2022 site energy-use intensity was 170.0 kBtu/ft² across 107,000 sq ft, including 3,059,118 kWh of electricity and 78,347 therms of natural gas.
What are Phs | Alvarado Hospital Medical Center | West Tower's carbon emissions?
Phs | Alvarado Hospital Medical Center | West Tower reported 1,131 tCO₂e of greenhouse-gas emissions (10.6 kgCO₂e/ft²) for 2022.
Where is Phs | Alvarado Hospital Medical Center | West Tower?
Phs | Alvarado Hospital Medical Center | West Tower is at 6645 Alvarado Rd., San Diego, in San Diego, California 92120. Its coordinates are 32.77716, -117.05675 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Phs | Alvarado Hospital Medical Center | West Tower and when was it built?
Phs | Alvarado Hospital Medical Center | West Tower has 107,000 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 1989 as its year built. It is classed as hospital (general medical & surgical).
Is Phs | Alvarado Hospital Medical Center | West Tower covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Phs | Alvarado Hospital Medical Center | West Tower, San Diego, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/phs-alvarado-hospital-medical-center-west-tower-cfa3f266 (data as of July 9, 2026).