BuildingCensus
A

Pic02 - Maintenance, Building 1200

Non-Refrigerated Warehouse in California, CA · 1475 Kansas Avenue, San Luis Obispo · 93405

At a glance

Pic02 - Maintenance, Building 1200 is a 50,121-square-foot non-refrigerated warehouse at 1475 Kansas Avenue, San Luis Obispo in San Luis Obispo, California, built in 1950. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 92 out of 100 (grade A), a site energy-use intensity of 8.2 kBtu/ft² and 14 tCO₂e of greenhouse-gas emissions. That score is higher than 70% of the 2,227 scored non-refrigerated warehouse buildings in California.

ENERGY STAR score
92
band A · 2024
Site EUI
8.2
kBtu/ft²
GHG emissions
14
tCO₂e
GHG intensity
0.3
kgCO₂e/ft²
Floor area
50,121
sq ft
Year built
1950
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 1 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score92 (band A)
Site EUI8.2 kBtu/ft²
Source EUI—
GHG emissions14 tCO₂e
GHG intensity0.3 kgCO₂e/ft²
Electricity15,433 kWh
Natural gas2,063 therms
Gross floor area50,121 sq ft
Source recordcalifornia:3365348:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest92-58.2 kBtu/ft²14 tCO₂e
202397+74.7 kBtu/ft²14 tCO₂e
202290+19.3 kBtu/ft²16 tCO₂e
202189+1—16 tCO₂e
2020887.0 kBtu/ft²21 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1475 Kansas Avenue, San Luis Obispo
State
California
ZIP
93405
Coordinates
35.32133, -120.72269

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Pic02 - Maintenance, Building 1200 compare with other non-refrigerated warehouse buildings in California?

The latest disclosures cover 2,867 non-refrigerated warehouse buildings in California, out of 40,029 buildings citywide. Pic02 - Maintenance, Building 1200's ENERGY STAR score of 92 compares with an average of 68 across the 2,227 that report a score; it scores higher than 70% of them and lower than 28%. Its site EUI of 8.2 kBtu/ft² is about 62% below the average of 21.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.3 kgCO₂e/ft² is about 79% below the group average of 1.4 kgCO₂e/ft².

At 50,121 sq ft, it is about 71% below the average floor area of 173,929 sq ft for those buildings. It was built in 1950, 38 years earlier than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 4,723 non-refrigerated warehouse buildings average an ENERGY STAR score of 66 and a site EUI of 26.0 kBtu/ft².

How has Pic02 - Maintenance, Building 1200's energy performance changed over time?

BuildingCensus holds 5 California disclosures for Pic02 - Maintenance, Building 1200, covering report years 2020–2024. Its ENERGY STAR score went from 88 in 2020 to 92 in 2024 (+4 points); its best year on file was 2023, at 97. Site EUI moved from 7.0 kBtu/ft² (2020) to 8.2 kBtu/ft² (2024), an 17% increase. Reported emissions went from 21 tCO₂e to 14 tCO₂e over the same span (down 30%).

What does an ENERGY STAR score of 92 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 92 means the building performs better than about 92% of its national peers. BuildingCensus bands the score into report-card grades; 92 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Pic02 - Maintenance, Building 1200's 8.2 kBtu/ft² across 50,121 sq ft works out to about 0.4 billion Btu (120 MWh-equivalent) in 2024. The disclosure also reports 15,433 kWh of electricity and 2,063 therms of natural gas for the year.

Which law requires Pic02 - Maintenance, Building 1200 to report its energy use?

Pic02 - Maintenance, Building 1200 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:3365348:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More non-refrigerated warehouse buildings in California

Frequently asked questions

What is Pic02 - Maintenance, Building 1200's energy grade?

Pic02 - Maintenance, Building 1200 scores 92 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Pic02 - Maintenance, Building 1200 use?

Its 2024 site energy-use intensity was 8.2 kBtu/ft² across 50,121 sq ft, including 15,433 kWh of electricity and 2,063 therms of natural gas.

What are Pic02 - Maintenance, Building 1200's carbon emissions?

Pic02 - Maintenance, Building 1200 reported 14 tCO₂e of greenhouse-gas emissions (0.3 kgCO₂e/ft²) for 2024.

Where is Pic02 - Maintenance, Building 1200?

Pic02 - Maintenance, Building 1200 is at 1475 Kansas Avenue, San Luis Obispo, in San Luis Obispo, California 93405. Its coordinates are 35.32133, -120.72269 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Pic02 - Maintenance, Building 1200 and when was it built?

Pic02 - Maintenance, Building 1200 has 50,121 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1950 as its year built. It is classed as non-refrigerated warehouse.

Is Pic02 - Maintenance, Building 1200 covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Pic02 - Maintenance, Building 1200, San Luis Obispo, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/pic02-maintenance-building-1200-1d450561 (data as of July 9, 2026).